Loading…
Loading…
Tender Value
₹4.5 L
EMD Value
₹8,960
Closing Date
21 Jul 2026, 4:00 pm
Executive Engineer Div. No1 JMC Dogra Hall Jammu.
Executive Engineer Div. No1 JMC Dogra Hall Jammu.
Construction of Deep drain crossing at chowk link road ward no. 4 Jammu Ac Jammu east Head .....(CDF)
2026_HAUDD_314139_17
Division No. 1/JMC/26-27/e-NIT No. 24
Open Tender
Civil Works
Ward No. 104.
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
FA/Chief Accounts Officer JMC
₹8,960
Yes
1 Jul 2026
1 Jul 2026
22 Jul 2026
1 Jul 2026
21 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour engaged for desilting,readjustment of manholes covers, diverting the direction of water dewatering during the execution of work and disposal away from site. | 2 | No | 553 | ₹1,106 |
| 2 | Earthwork in excavation by manual means in trenches for foundations,drains,pipes cables etc (not exceeding 1.5m in width) and for shafts,wells cesspits and the like not exceeding 10 sqm on plan,including dressing of sides and ramming of bottoms lift upto 1.5m,includding getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil. | 27.19 | Cum | 479.3 | ₹13,032.17 |
| 3 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:Bituminous road. | 18.59 | Sqm | 305.95 | ₹5,687.61 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. | 46.47 | Sqm | 286.35 | ₹13,306.68 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | 11.62 | Sqm | 718.2 | ₹8,345.48 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 mix | 1.42 | Cum | 4,826.5 | ₹6,853.63 |
| 7 | Removal of excavated mulba dismantled or unservicable material from the site of work by mechanical transport or animal transport or otherwise including loading/unloading (complete job) | 23.24 | Cum | 200.74 | ₹4,665.2 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 9.7 | Cum | 7,788.4 | ₹75,547.48 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level with cold twisted bar | 1,163.98 | Kg | 123.2 | ₹1,43,402.34 |
| 10 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 803 | Kg | 181.6 | ₹1,45,824.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1017349.xls
BOQ • 0.30 MB
CORRIGENDUM.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid