Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹8.4 L+₹46,443.97 (5.85%)Admitted-Fee/PreQual/Technical/Finance PLOT NO A 13 28 MIDC BUTTIBORI INDUSTRIAL AREA NAGPUR MAHARASHTRA 441122 | NAGPUR | MAHARASHTRA | 441122 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹8.6 L+₹65,147.07 (8.20%)Admitted-Fee/PreQual/Technical/Finance AT MUDIDIH NO 2 P O SIJUA DHANBAD 828121 | DHANBAD | JHARKHAND | 828121 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹8.9 L+₹98,410.99 (12.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹9.4 L+₹1.5 L (18.7%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.8 L
EMD Value
₹18,600
Closing Date
23 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
STAFF OFFICER CIVIL WNA
AGM OFFICE WNA
Providing barbed wire fencing at mine boundary in forest land at Ghonsa OCM under Ghonsa SA of WNA
2026_WCL_368809_1
wn4650-civ-e073-2026-27 Date 12.11.2026
Open Tender
Civil Works - Others
Percentage
45 days
GOCM
Please refer Tender documents.
3 documents required · 3 mandatory
₹18,600
24 Nov 2026
12 Nov 2026
24 Nov 2026
13 Nov 2026
23 Nov 2026
13 Nov 2026
13 Nov 2026 - 16 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading (Note:- The Work is to executed as per the STC attached in the Tender document) | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m.
All kinds of soil. | 72.42 | cum | 200.85 | ₹14,545.56 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 72.42 | cum | 6,287.2 | ₹4,55,319.02 |
| 1.03 | Supplying at site:
16.15.1 R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1cement: 1.5 coarsesand : 3 graded stone aggregate 12.5mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in- charge(cost of earth works in excavation, concrete works in foundation to be paid separately) | 22.96 | cum | 27,336.6 | ₹6,27,648.34 |
| 1.04 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kgper 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. bindingwire tied to 6 mm bar nibs fixed while casting the post(cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used.
With G.I. barbed wire | 10,726 | mtr | 11.8 | ₹1,26,566.8 |
| 1.05 | Clearing jungle including uprooting of rank vegetation, grass,
brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 2,250 | sqm | 13.85 | ₹31,162.5 |
| 2 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.81 MB
BOQ_381800.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .