| 1 | L-1₹6.3 LAccepted-AOC 48 ICHAK ICHAK SAMUNDRA BAGI HAZARIBAG JHARKHAND 825402 | HAZARIBAGH | JHARKHAND | 825402 | ₹6.3 L Quoted ₹5.3 L | L-1 | Accepted-AOC Technocommercially elegible L-1 Bidder |
| 2 | L-2₹5.5 LRejected-Finance | ₹5.5 L | L-2 | Rejected-Finance L-2 As per BOQ Summary details |
| 3 | L-3₹6.6 LRejected-Finance | ₹6.6 L | L-3 | Rejected-Finance L-3 As per BOQ Summary details |
| 4 | L-4₹7.8 LRejected-Finance NEAR RAM JANKI MANDIR BACHRA PIPARWAR CHATRA JHARKHAND 829201 | CHATRA | JHARKHAND | 829201 | ₹7.8 L | L-4 | Rejected-Finance L-4 As per BOQ Summary details |
Tender Value
₹14.3 L
EMD Value
₹18,000
Closing Date
21 Apr 2026, 10:00 amClosed
Staff Officer (Civil), NK Area.
Office of General Manager NK Area Dakra
Cleaning of drain in Belt roadway,Travelling roadway ,along Subsidence area and Blanketting of Subsidence Zone/Pot holes/Cracke above depillered W5 Pannel and Trench cutting on the surface over proposed depillering W5 Pannel at Churi Project,NK Area.
2026_CCL_358231_1
SO(C)/NK/e-tender/26-27/18
Open Tender
Civil Works - Others
60 days
Churi Project, NK Area
As per NIT
3 documents required · 3 mandatory
₹18,000
9 May 2026
10 Apr 2026
22 Apr 2026
11 Apr 2026
21 Apr 2026
11 Apr 2026
11 Apr 2026 - 18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ( Part A ) Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | Sqm | 10.55 | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | - | Cum | - | - |
| 3 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | - | Cum | - | - |
| 4 | (Part B) Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | - | Cum | - | - |
| 5 | ( Part C ) Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | - | Cum | 205.8 | - |
| 6 | Carriage of Materials By Mechanical Transport including loading,unloading and stacking Earth Lead - 5 km | - | Cum | - | - |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. | - | Cum | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)Aggregate (RCA) upto 25% : 3 graded stone aggregate 20 mm nominal size including Recycled Concrete Aggregate (RCA) upto 25%). | - | Cum | 7,907.55 | - |
| 9 | (Part D) Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | - | Cum | 205.8 | - |
| 10 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.03 MB
BOQ_371106.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid