| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹83.3 L+₹3.3 L (4.09%)Accepted-AOC AT KALINGA VIHAR VIA PATRAPADA DIST KHURDA ODISHA | KHORDHA | ODISHA | 751001 | L2 | Accepted-AOC As per H.O Letter No. 8044/OCC/Works-459-M(WE) Dt.27.06.2023 Awarded value is excluding GST | |
| 2 | L1₹80.1 LRejected-Finance BARAMYNDA BHUBANESWAR | BHADRAK | ODISHA | 755007 | L1 | Rejected-Finance Quoted amount excluding GST | |
| 3 | L3₹1.2 Cr+₹42.7 L (53.3%)Rejected-Finance BYE PASS ROAD JEYPORE KORAPUT | KORAPUT | ODISHA | 763001 | L3 | Rejected-Finance Quoted amount excluding GST | |
| 4 | Rejected-Technical | - | Rejected-Technical Techncially not qualified |
Tender Value
Refer Docs
EMD Value
₹96,137
Closing Date
26 May 2023, 5:00 pmClosed
General Manager (Mech.), E and M, OCC Ltd.
Office of the General Manager (Mech.), E and M
E,C and testing of Barrage Bay and U/Sluice vertical fixed wheel gates with their hoisting arrangements, hoist supporting structure and trestles, stop logs, lifting beam to operate stop logs, monorail supporting structure etc of Kusumi Barrage Pr
2023_OCCL_88895_1
09 /OCCL/2023-24 (on-line)
Open Tender
Mechanical Works
Item Rate
150 days
Nayagarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
₹96,137
Office of the General Manager (Mech.), E and M
21 Jul 2023
12 May 2023
29 May 2023
12 May 2023
26 May 2023
12 May 2023
12 May 2023 - 18 May 2023
20 May 2023
Amount
Barrage Bay vertical fixed wheel gates alongwith rope drum hoisting arrangements, hoist supporting structure & trestle, Gate size:9000 mm x 3500 mm, No of sets : 06
Erection of 1st stage embedded parts
Erection of 2nd stage embedded parts for Barrage Bay vertical fixed wheel gates of size: 9000 mm x 3500 mm. (06Nos) .
Erection of Barrage Bay vertical fixed wheel gates of size: 9000mm x 3500mm. (06Nos) . including light test for proper sealing.
Painting of Barrage Bay vertical fixed wheel gates of size: 9000mm x 3500mm. (06Nos) “after blast cleaning process, performed with sand as per requirements and class ‘A’ of IS14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer should be applied to give a total dry film thickness of 70 ± 5 microns followed by two coats of solvent less black Epoxy Paint applied at an interval of 24 hours between each coat. Each coat should give a minimum dry film thickness of 150 ± 5 microns. The total dry film thickness of all the coats including primer coating should not be less than 350 microns as per IS: 14177:1994 including compressor, paints, thinner, painting equipments, sand, labour, other machinery, scaffolding etc
Erection, Commissioning and Testing of rope drum hoist pertaining to Barrage Bay vertical fixed wheel gates
Painting of rope drum hoisting arrangements, hoist supporting structure & trestle(No of sets : 06) and hoist supporting structures & trestle for one double pier,“after blast cleaning process, performed with sand as per requirements and class ‘A’ of IS14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a total dry film thickness of 40 ± 5 microns as per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 micons per each coat. followed by two coats of synthetic enamel paint confirming to IS:2932:1974 to give dry film thickness of 25± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equipments, labour, other machinery, scaffolding etc. required for painting.
Erection of hoist supporting structures & trestle
Erection of hoist supporting structures & trestle for one double pier
2nd stage concreting of gates, hoist supporting structures & trestle.
Laying and Jointing PVC Pipe. Heading
Erection of 1st stage embedded parts
Erection of 2nd stage embedded parts for Under Sluice vertical fixed wheel gates of size: 9000mm x 4500mm. (02 Nos) .
Erection of Under Sluice vertical fixed wheel gates of size: 9000mm x 4500mm. (02 Nos) . including light test for proper sealing.
Painting of Under Sluice vertical fixed wheel gates of size: 9000mm x 3500mm. (02Nos) “after blast cleaning process, performed with sand as per requirements and class ‘A’ of IS14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer should be applied to give a total dry film thickness of 70 ± 5 microns followed by two coats of solvent less black Epoxy Paint applied at an interval of 24 hours between each coat. Each coat should give a minimum dry film thickness of 150 ± 5 microns. The total dry film thickness of all the coats including primer coating should not be less than 350 microns as per IS: 14177:1994 including compressor, paints, thinner, painting equipments, sand, labour, other machinery, scaffolding etc
Erection, Commissioning and Testing of rope drum hoist pertaining to Under Sluice vertical fixed wheel gates
Erection of hoist supporting structures & trestle
Erection of Ladder-2Nos(1Set)
Painting of rope drum hoisting arrangements, hoist supporting structure & trestle(No of sets : 02) and Ladder-2Nos(1Set),“after blast cleaning process, performed with sand as per requirements and class ‘A’ of IS14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a total dry film thickness of 40 ± 5 microns as per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 micons per each coat. followed by two coats of synthetic enamel paint confirming to IS:2932:1974 to give dry film thickness of 25± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equipments, labour, other machinery, scaffolding etc. required for painting.
2nd stage concreting of gates, hoist supporting structures,trestle & ladder.
Stoplogs for Barrage Bay & undersluice alongwith latch arrangements,( No of leaves:05 & No of Latch:08 )
Erection of 1st stage embedded parts
Erection of 2nd stage embedded parts
Erection of stop logs for Barrage Bay & Under Sluice
Erection of Latch arrangements
Final painting of stoplog leaves for Barrage Bay & Under sluice gates. “after blast cleaning process, performed with sand as per requirements and class ‘A’ of IS14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer should be applied to give a total dry film thickness of 70 ± 5 microns followed by two coats of solvent less black Epoxy Paint applied at an interval of 24 hours between each coat. Each coat should give a minimum dry film thickness of 150 ± 5 microns. The total dry film thickness of all the coats including primer coating should not be less than 350 microns as per IS: 14177:1994 including compressor, paints, thinner, painting equipments, sand, labour, other machinery, scaffolding etc"
2nd stage concreting of stoplog leaves.
Lifting Beam for Stoplogs for Barrage Bay & undersluice & Monrail, Monorail supporting structure , monorail walkway etc.
Erection of Lifting Beam
Erection of Monrail, Monorail supporting structure
Erection of Monrail Walkway
Painting of Lifting Beam, Monrail, Monorail supporting structure, Monrail Walkway & latch arrangements after blast cleaning process, performed with sand as per requirements and class ‘A’ of IS14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a total dry film thickness of 40 ± 5 microns as per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 micons per each coat. followed by two coats of synthetic enamel paint confirming to IS:2932:1974 to give dry film thickness of 25± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equipments, labour, other machinery, scaffolding etc. required for painting.
2nd stage concreting of Monorail supporting structure , monorail walkway etc.
ANANTA CONSTRUCTIONS
NEELAMADHAB ENGINEERING WORKS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .