Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Fee/PreQual/Technical/Finance | -11.33% | ₹3.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.7 L+₹13,333 (3.76%)Admitted-Fee/PreQual/Technical/Finance ANANTNAG ANANTNAG JAMMU AND KASHMIR | ANANTNAG | JAMMU AND KASHMIR | 192101 | -8.00% | ₹3.7 L+₹13,333 (3.76%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
27 Jul 2026, 4:00 pmClosed
Executive Engineer
Irrigation Division Shopian
Improvements to Noori Khul by way of raising, bed treatment, slit clearance from the house of Shabir Ahmad Boda to the house of Zahoor Ahmad Mantoo via Ab Hamid Boda
2026_IFC_316647_1
eNIT 18 of 2026-27
Open Tender
Civil Works
Percentage
15 days
Shopian
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer
₹8,000
7 Aug 2026
18 Jul 2026
28 Jul 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet | 41 | Cum | 184.95 | ₹7,582.95 |
| 2 | Carriage of Materials by Mechanical Transport including loading, unloading and stacking avg. lead 02kms | 36.9 | Cum | 184.3 | ₹6,800.67 |
| 3 | Dumping stone excluding cost of stones. in Horizontal on level | 23.23 | Cum | 237.9 | ₹5,526.42 |
| 4 | Supply of Nallah Stones | 23.23 | Cum | 700 | ₹16,261 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 31.58 | Cum | 6,591.25 | ₹2,08,151.68 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 124.8 | sqm | 286.35 | ₹35,736.48 |
| 7 | CEMENT PLASTER (IN FINE SAND)
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) | 244.06 | sqm | 283.8 | ₹69,264.23 |
| 8 | Carriage of material by Mechanical Transport .
Stone boulders avg. lead of 03kms | 23.23 | Cum | 195.1 | ₹4,532.17 |
| 8.01 | 20 mm agg. Avg. lead of 13kms from Narapora | 28.42 | Cum | 318.31 | ₹9,046.37 |
| 8.02 | Sand from Kakapora avg. lead 32 kms | 14.21 | Cum | 542.42 | ₹7,707.79 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1033751.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .