Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC ETAH | UTTAR PRADESH | 207001 | ₹12.7 L | L1 | Accepted-AOC Tender is accepted due to the lowest rate quoted. |
| 2 | L2₹12.7 LRejected-AOC | ₹12.7 L | L2 | Rejected-AOC Tender is rejected for being more than the lowest. |
| 3 | L3₹12.7 LRejected-AOC | ₹12.7 L | L3 | Rejected-AOC Tender is rejected for being more than the lowest. |
Updated dates
Tender Value
₹12.7 L
EMD Value
₹1.3 L
Closing Date
12 Mar 2026, 12:00 pmClosed
Executive Officer
Nagar Panchayat Mahroni
Construction of Drain from Raghuveer parihar house towards purushottam sahu house in pragya nagar
2026_DOLBU_1114252_1
290-2/Etender/NPM/2025-26
Open Tender
Civil Works
60 days
Nagar Panchayat Mahroni
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Executive Officer
₹1.3 L
16 Mar 2026
11 Feb 2026
12 Mar 2026
11 Feb 2026
12 Mar 2026
11 Feb 2026
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. 2.7.1 Ordinary rock cum 498.9
Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing of Shuttering and Centuring
P/F Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level.
P/F of Sign Board i/c all comp. etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_2065989.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid