| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹23.0 L+₹1.4 L (6.60%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-PHOTO UPLOADED MUST INCLUDE PERSON IN PRESENCE AT THE SPOT IN THE PHOTO |
Tender Value
₹18 L
EMD Value
₹36,000
Closing Date
14 Sept 2026, 4:30 pmClosed
Er. fayaz Ahmed
Executive engineer REW Ramban
AS PER NIT
2026_RDPR_322350_8
e-Nit 38.2of REW Ramban(UKRAL,KARI, RAMSOO )
Open Tender
Civil Works
Percentage
Ramsoo
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive engineer REW Ramban
₹36,000
24 Sept 2026
26 Aug 2026
15 Sept 2026
26 Aug 2026
14 Sept 2026
26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All Kinds of Soil 80% | - | cum | 592.9 | - |
| 2 | Hard Rock 20% | - | cum | 940.3 | - |
| 3 | Providing and laying stone soling in horizontal position including cost of stones including backing filling. | - | cum | 510 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | cum | 5,202.5 | - |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,
buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering,
finishing and reinforcement. . 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) upto foundation | 1 | cum | 9,395.7 | ₹9,386.3 |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost ofcentring, shuttering and finishing with. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | cum | 8,422.45 | - |
| 7 | Boulders | - | cum | 510 | - |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | 9,821.85 | ₹9,812.03 |
| 9 | Steel Reinforcement for R.C.C work with TMT bars | 1 | Kg | 123.2 | ₹123.08 |
| 10 | Bearings Providing and installing in position of POT- PTFE/ Elastomeric bearings at free/ fixed ends of Truss girder. over abutments and pier locations as per drawings which shall include the following: | - | nos | 25,000 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
BOQ_1080103.xls
BOQ • 0.30 MB
corr.pdf
PDF • 0.49 MB
corrigendum38point2.pdf
PDF • 0.84 MB
corrigendum38_2.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .