| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | ₹2.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹2.9 LRejected-Finance | ₹2.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹3.0 LRejected-Finance DR GRAHAMS HOMES BLOCK B KALIMPONG | KALIMPONG | KALIMPONG | WEST BENGAL | 734301 | ₹3.0 L | L3 | Rejected-Finance L3 |
Tender Value
₹2.9 L
EMD Value
₹5,834
Closing Date
16 Jan 2026, 3:55 pmClosed
Panchayat Pradhan Yangmakum Gram Panchayat
Office of the Panchayat Pradhan Yangmakum Gram Panchayat
Construction of Community Toilet at Traffic Dara at Yangmakum Gram Panchayat
2025_GTA_981077_1
PP/YANGGP- KPG-I/eNIT 04/2025-2026
Open Tender
CIVIL WORKS
45 days
Yangmakum
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,834
Yes
19 Feb 2026
30 Dec 2025
19 Jan 2026
30 Dec 2025
16 Jan 2026
30 Dec 2025
PWD(WB)/BUILDING WORKS(CCS)/Page-1/Item-2 Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1.500 mm. .
PWD(WB)/BUILDING WORKS(CCS)/Page-229/Item-12 Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
PWD(WB)/BUILDING WORKS(CCS)/Page-229/Item-11A Cost of stone boulder 150 mm size delivered ans stacked at site.
PWD(WB)/BUILDING WORKS(CCS)/Page-27/Item-11Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.(i) (1:3:6) proportion.
PWD(WB)/BUILDING WORKS(CCS)/Page-34/Item-22II (II) Cement concrete with 30 mm. down graded shingles excluding shuttering.N.B. VarietyIn ground floor .(a) 1:3:6 proportion.
PWD(WB)/BUILDING WORKS(CCS)/Page-24/Item-4 Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes. (b) River bazree.
PWD(WB)/BUILDING WORKS(CCS)/Page-43/Item-40 Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. (a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.other than SAIL/TATA/RINL/JSW/JSPL/Shyam/SRMB/ISSL/BMASL/Electrosteel
PWD(WB)/BUILDING WORKS(CCS)/Page-42/Item-36 Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. .
PWD(WB)/BUILDING WORKS(CCS)/Page-16/Item-16 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
PWD(WB)/BUILDING WORKS(CCS)/Page-189/Item-1Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].(ii) With 1:4 cement mortar .(b) 15 mm. thick plaster.
PWD(WB)/BUILDING WORKS(CCS)/Page-114/Item-1Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame excluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be corrected up to three decimals).(d) Sal : Local.
PWD(WB)/BUILDING WORKS(CCS)/Page-117/Item-1Panel shutters of door and window, as per design (each panel consisting of single plank with out joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings.In ground floor.(In case of non-supply of single plank, panel rate of reduction of 20% will be made).(iii) 35mm.thick shutters with 19 mm. thick panel of size 30 to 45cm. (c)other Local wood.
PWD(WB)/BUILDING WORKS(CCS)/Page-194/Item-1White washing including cleaning and smoothening surface thoroughly :All floors:.(b) Two coats (to be done on specific instruction.).
PWD(WB)/BUILDING WORKS(CCS)/Page-200/Item-2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand parpering etc. in cluding using of approved putty etc. on the surface , if necessary.(a) On timber or plastered surface: (1) With super gloss (hi-gloss)(iv) Two coats (with any shade except white).. .
Supplying, fitting and fixing CPVC (Chlorinated PolyvinylChloride) pipes of approved make conforming to IS-15778:2007 . with all necessary accessories, specials viz. socket,bend, tee, union, cross, elbo, nipple, longscrew, reducingsocket, reducing tee, short piece etc. fitted with holder batsclamps, including cutting pipes, fitting, fixing etc. completein all respect including cost of all necessary fittings asrequired,jointing materials in any position above ground.(Payment will be made on the centre line measurements oftotal pipe line including all specials. No separate paymentwill be made for accesories, specials.(a) For Exposed Work(i) CPVC Pipes Class-I,SDR-1120 mm
PWD(WB)/SANITARY AND PLUMBING WORKS/Page-13/Item-19-iiiSupply of PVC pipes & fittings of Schedule 80 (medium duty) conforming to ASTMD-1785 and threaded to match with G.I. Pipes as per IS:1239 (Part-I).p.v.c Pipes 100mm
PWD(WB)/SANITARY AND PLUMBING WORKS/Page-79/Item-4 Supplying, fitting and fixing Orissa pattern water closet in white glazed vitreous chinaware of approved make in position complete excluding 'P' or 'S' trap (excluding cost of concrete for fixing). 580 mm X 440 mm.
PWD(WB)/SANITARY AND PLUMBING WORKS/Page-37/Item-6 Supplying PVC water storage tank of approved quality with closed top weith lid (Black) - Multilayer.1000 litre capacity.
PWD(WB)/SANITARY AND PLUMBING WORKS/Page-10/Item-16 Supplying, fitting and fixing G.I gravity operated water tap for public use with pilfer proof arrangement of approved brand and make.20 mm dia.
PWD(WB)/SANITARY AND PLUMBING WORKS/Page-41/Item-1 Wash basin white vitreous china of approved make (without fittings) supplied, fitted and fixed in position on 75mm X 75mm X 75mm wood blocks and C.I. Brackets including two coats of painting of C.I. Brackets. 550 mm x 400 mm size.
PWD(WB)/SANITARY AND PLUMBING WORKS/Page-5/Item-5Supplying, fitting and fixing gunmetal wheel valve of approved brand and make tested to 21 kg sq.cm. (for water lines only).20 mm.
PWD(WB)/SANITARY AND PLUMBING WORKS/Page-88/Item-3 Construction of Septic tank of different capacities as per approved drawing with 1st class brick work in cement mortar (4:1) including two 560 mm dia. R.C.C. manhloe cover of approved make supplied, fitted and fixied in the top slab with necessary fittings, 19 mm thick cement plaster(4:1) with neat cement finish to the internal surfaces and 12 mm thick plaster(4:1) to outside wall upto 200 mm below G.L. floor finished with 25 mm thick grey artificial stone including supplying, fitting and fixing all necessary specials, fittings, S.W. tees, C.I. foot rest etc. including excavating earth in all sorts of soil, shoring, bailing and pumping out water as necessary, ramming, dressing the bed and refilling the sides of the tank with earth, removing spoils, fliing up the chamber with clear water, removing foreign materialsfrom the chamber and including constructing attached inspection pit as per approved dawing and connecting all necessary pipes, joints etc. with internal plaster work and artificial stone flooring is to be done with admixture of water proofing compound @ 5% by weight of cement, complete in all respect as per directon of Engineer-in-Charge.For 10 users. With Pakur Variety.(SAIL/TATA/RINL)
Please Enable Macros to View BoQ information
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_2392547.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid