Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.4 LAccepted-AOC NEAR KRAYA VIKRAY SAMITI ASHOK NAGAR DISTRICT FATEHPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | 1 | Accepted-AOC L1 bidder | |
| 2 | 2₹7.6 L+₹1.9 L (4.94%)Accepted-AOC | 2 | Accepted-AOC L2 bidder, consented on L1 bidder rates. | |
| 3 | 3₹41.2 L+₹3.7 L (9.88%)Rejected-Finance | 3 | Rejected-Finance L3 bidder | |
| 4 | Rejected-Technical AURI MOR ANPARA SONEBHADRA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | - | Rejected-Technical PQC not qualified |
Tender Value
₹37.1 L
EMD Value
₹72,000
Closing Date
7 Jul 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of The Superintending Engineer, Operation and Maintenance Circle-II, 2x500 MW Anpara D Thermal Power Station, U. P. Rajya Vidyut Utpadan Nigam Ltd., PO- Anpara-231225, Distt- Sonebhadra (UP)
Routine / Preventive / Breakdown Maintenance of Mill Reject Handling System and Cleaning of areas related to BMD-II of Unit 6 and 7, 2x500 MW, DTPS, Anpara.
2022_RVUNL_705985_1
T-09/BMD-II/DTPS/2022-23
Open Tender
Power/Energy Projects/Products
Fixed-rate
365 days
Anpara Thermal Power Station
As per Tender specifications
2 documents required · 2 mandatory
₹2,950
Dy. GM(F), Construction Unit, CFAandBO, DTPS
₹72,000
19 Oct 2022
6 Jun 2022
11 Jul 2022
6 Jun 2022
7 Jul 2022
6 Jun 2022
120 days
Amount
Round the clock Routine maintenance of Mill Reject Handling System of unit no. 06 & 07. [Carrying out the above work per shift (i.e. for 08 hours) in one unit (6 or 7) of 2x500 MW ‘D’TPS, Anpara will be treated as one job.]
Replacement of Seal.
Cleaning of choked bends.
Cleaning of choked pipe.
Cleaning of choked vessel / pyrite hopper.
Cleaning of choking of Mill Reject Chute when Mill Reject chute, associated gates & bellow have to be dismantled.
Attending problems of cooling water line/ air water lines/ Leakages.
Replacement / Repair / Servicing of gates/ valves/ bellows/ bends.
Replacement / Repair / Servicing of Dome Valve Assembly.
Replacement / Reinstallation / Repair of grid screen of pyrite hopper.
Replacement and Repair of Pipe (per meter).
Erection of suitable platform for replacement / repairing of pipe.
Replacement and Cleaning of Dust bags / Grid of Reject Bunker.
Clearing of Choking of Reject Bunker.
Reject Bunker Outlet Gate Servicing and Replacement.
Servicing / Replacement of valves of Air Receiver Tank.
Servicing / Replacement of Mill Reject Sump Pump.
Attending Minor Faults of Mill Reject Sump Pump.
Replacement / Realignment of Rupture Disc
Cleaning and/or water washing of area ‘0’ meter Mill Area from 'A' Mill to drain before Mill Reject Bunker after 'E' Mill (Right Side of Boiler) or 'K' Mill to drain before Mill Reject Bunker after 'F' Mill (Left Side of Boiler) of units # 6 & 7. (One job shall be given for cleaning of complete mill area of one side of each boiler.)
Cleaning and/or water washing of paved area ‘0’ meter (RCC area beyond MRS trench of Left side Mills of Unit # 6 upto drain).
Cleaning and/or water washing of paved area ‘0’ meter between boilers of Unit # 6 & 7. ("Paved Open Area" between boilers + RCC area in between "Open Area" & beyond MRS trench of Right side Mills of Unit 6 + RCC area in between "Open Area" & beyond MRS trench of Left side Mills of Unit # 7).
Cleaning and/or water washing of paved area ‘0’ meter (RCC area beyond MRS trench of Right side Mills of Unit # 7 + open Paved area beyond RCC area upto Main drain).
Cleaning and/or water washing of area ‘0’ meter of FD & PA Fans (Left side & Right Side of Boiler) of Unit # 6 & 7.
Cleaning and/or water washing of area ‘0’ meter of ID Fans of units # 6 & 7. (One job shall be given for cleaning of complete area of both ID Fans of one boiler.)
Cleaning with compressed air of various grills, Platform, Stairs and hand railing of Mill Floor, RC Feeder floor & various Air / Flue gas ducts etc. of unit # 6 & 7. (One job shall be given for cleaning of complete above mentioned area of one boiler.)
Brooming, Sweeping & Cleaning of area ‘22’ meter RC Feeder Floor (Left Side or Right side of Boiler) of units # 6 & 7. (One job shall be given for cleaning of complete Feeder Floor area of one side of boiler.)
Cleaning with compressed air of Complete coal pipe from each of the 10 mills ('A' Mill to 'K' Mill) upto Fuel Inlet Elbow of Unit # 6 & 7. (One job shall be given for cleaning of complete Coal Pipes of one boiler.) Total Length: approx 1750 RM for one boiler. (Necessary scaffolding for approach to Coal pipe shall be made by contractor & all safety measures should be taken care off during work at height.) (i) From date of start of work to completion of work. (One job of "twice a month" ) (ii) From April to July (one additional job of "twice a month" of separate work indent as per requirement)
Outer Area Cleaning with compressed air of complete Ducts & related structures. (FD Fan to APH inlet, PA Fan to APH inlet, APH outlet to each mill (Hot Air Duct), PA Fan to each mill (Cold Air Duct), Common duct after HAD / CAD to each mill, & ID Fan inlet gate to chimney) of units # 6 & 7. (Necessary scaffolding for approach to Ducts shall be made by contractor & all safety measures should be taken care off during work at height.) (One job shall be given for cleaning of complete above mentioned area of one boiler.) (i) From date of start of work to completion of work. (one job of "twice a month") (ii) From April to July (one additional job of "twice a month" of separate work indent as per requirement).
Cleaning of accumulated ash from Seal Air Fan Platform during any breakdown. (One job shall be given for cleaning of complete platform of one Seal Air Fan)
Cleaning of MRS Trench by removing the cover & putting back the cover. (Left side or Right side of Mills) of units # 6 & 7. (Width 1.0 mtr, depth 2.5 mtr, total length 48.5 mtr.) (One job shall be given for cleaning of complete MRS Trench from each mill to Sump Pump of one side of one boiler.)
Cleaning of drain covered with grill/slab at back side of mills towards boiler area by removing the cover and putting back the cover to their position. (Width 0.5 mtr, depth 0.5 mtr, total length 85 mtr.) (One job shall be given for cleaning of complete drain at back side of left or right side of mills of one boiler.)
Cleaning of all Dust Bins of Mill & its related auxiliaries area & accumulation at place as specified by Engineer in charge.
Loading of coal/Pyrite rejects & other foreign materials accumulated besides each mills, feeder floor & other areas related to BMD-II in tractor trolley/truck and carrying & disposing the same to the reject disposal yard /designated place in the premises of plant.
Loading of coal/Pyrite rejects from overhead storage bunker/hopper in tractor trolley/truck by opening the discharge gate provided below the hopper and carrying & disposing the same to the reject disposal yard.
EASTERN ENGINEERING CORPORATION
INDIA ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .