| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC CHANDAULI | UTTAR PRADESH | 221009 | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 Cr+₹17.1 L (14.2%)Rejected-Finance | ₹1.4 Cr+₹17.1 L (14.2%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.4 Cr+₹20.0 L (16.6%)Rejected-Finance | ₹1.4 Cr+₹20.0 L (16.6%) | L3 | Rejected-Finance L2 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
4 Nov 2022, 3:00 pmClosed
Superintending Engineer
Office Superintending Engineer 14th Circle Irrigation Work Azamgarh
Construction of C.C.Lining of side slope of right bank of sultanpur parallel branch from km 115.800 to Km 116.270
2022_UPIDC_742669_1
03/SE/2022-23
Open Tender
Civil Works
Item Rate
540 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,700
₹2.8 L
Yes
Azamgarh
31 Jan 2024
28 Oct 2022
4 Nov 2022
28 Oct 2022
4 Nov 2022
28 Oct 2022
31 Oct 2022
Amount
Supply and piling of bamboo 50-80 mm dai 2.00M long including cost of all material labour T&P etc.
Bamboo bracing of 50 to 80 mm dia excluding cost of bamboo but including cost of labour and T&P.
Supply & filing empty cement bag with earth tying and sewing with sutli & placing at site up to 60m including cost E.C. bag includin cost of labour and T&P etc.
Earth work by power transport for a lead of upto 1 km. including Excavation loading unloading & royalty manual copaction and dressing including all lift for lead beyond 630 M and upto 1 km.
Earth work in excavation of foundation including all lead & lift cost of labour T&P etc.
Supplying & laying coarse sand including cost of all material labour T&P etc.
Providing & laying LDPE with all lead lift including cost of all material labour T&P etc.
Centering & Shuttering for R.C.C. work including cost of all material labour T&P etc.
Laying M-20 mix with dala crushed stone grit size 4.75 to 20mm with chopan coarse sand curing shuttering including cost of all material labour T&P etc. (i) RCC work in Toe Wall in 1:1:5:3 (M 20)
(ii) CC Lining in M 20
Cutting bending binding and placing of steel reinforcement in R.C.C. work including cost of binding wire labour T&P etc.
Providing & Laying C:C: 1:2:4 with coarse sand Dala grit 4.75 mm to 20 mm size excluding shuttring including cost of all material labour T&P etc.
Providing & laying primer coat (painting) on new surface including cost of all material labour T&P etc.
Supplying & Fixing PVC seal including cost of all material labour T&P etc.
Providing & Laying Dala stone grit 4.75 mm to 20 mm in porous block excluding shuttering including cost of al material labour T&P etc.
Supplying & laying sealing compound including cost of all material labour T&P etc.
Supplying & fixing P.V.C. pipe including cost of all material labour T&P etc.
1st class brick work in 1:4 cm making side wall (parapet) including cost of all material labour T&P ete.
E/W in widening & strengtheing of right bank including cost of all labour T&P etc
M/S SANT KUMAR SINGH
DHARMENDRA KUMAR
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .