| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.6 LAccepted-Finance 2 138 MUTHALIYAR STREET VADAKKUPATTU AMODR TIRUVALLUR | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 601204 | L1 | Accepted-Finance Low rate quoted | |
| 2 | L2₹39.9 L+₹32,153.82 (0.81%)Rejected-Finance 16 PERUNAL KOIL STREET VEMBEDU VILLAGE AMBUR POST PIN 635701 THENI TAMIL NADU | TIRUPATHUR | TAMIL NADU | 635701 | L2 | Rejected-Finance High rate quoted |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
19 Jan 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block development officer
Sholavaram block office
Andarkuppam Panchayat AGAMT all works
2023_RDTN_279314_1
3534/2022/A7
Open Tender
Civil Works
Works
120 days
Sholavaram block office
As per documnets
4 documents required · 4 mandatory
₹0
₹1.0 L
Yes
19 Jan 2023
6 Jan 2023
19 Jan 2023
6 Jan 2023
19 Jan 2023
6 Jan 2023
Amount
1.IMPROVEMENTS TO PERAVALLUR PERUMAL KOIL KULAM (MAIN POND, BABY POND, STEPS, REVETMENT, INLET AND OUTLET)
Clearing the Light jungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical (A8)
Earth Work in all soils expected hard rock requiring blastering and conveying by earth by deploying earth moving machineries and tippers for formation of bund in layes of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum Moidture Content) and compaction of each layer to 95% proctor dendity through deployment of appropriate compaction eqipement (+8-10T Power Roller / Vibtratory Power Roller / Short width +-0.90m with drum) power roller or vibratory power roller / fuel operated or elect operated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per spectification.
Construction of Revertment work
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc
supplying and Erection cenetering for sides and soffiots including necessary supports and strutting as directed by the departmental officers
Cement Concrete 1:3:6 ( One Cement Three sand and Six Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete
Plain Cement Concrete 1:2:4 ( One Cement Two sand and Four Hard Broken stone) using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete
Gravel backing for revetments including all labour charges etc complete
Rough stone dry packing including cost and conveyance of all labour charges etc complete
Pointing the rough stone dry packing with cement mortar 1:3 mix including all charges
R.R.Masonry in CM 1:5 using rough stones
2.PROVIDING CEMENT CONCRETE ROAD AT PERUVALLUR PERIYA COLONY
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc
Cement Concrete 1:2:4 using 20 mm ISS HBG metal includig cost and conveyance etc complete
Towards centering charges for all labour charges etc.,
Supplying and fixing of Bitumen pad for exapansion joints
3. IMPROVEMENTS TO BURIAL GROUND (CC ROAD ) IN ANDARKUPPAM HABITATION
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc
Cement Concrete 1:2:4 using 20 mm ISS HBG metal includig cost and conveyance etc complete
Towards centering charges for all labour charges etc.,
Supplying and fixing of Bitumen pad for exapansion joints
4.CONSTRUCTION OF PUES BUILDING TOILET IN ANDARKUPPAM VILLAGE
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc
Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Honey comb Brick work using c.bricks of size 22x11x7 cm including cost and conveyance and all labour charges
Brick jelly 40mm size for filling soak pit inner etc.complete complying with standard specification
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rod
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and p
Finishing the exposed surface of RCC item of work such as slabs, beams, sunshade, facia, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick. including raking the surface.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:3, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly compl
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the sta
Distembering two coat using oil paint including cost and conveyance of all materials to site and all labour charges etc completed
Emulsion TWO coat with using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specificatio
Wash Hand basin of size 550 mm x400mm with all accessories such as cast iron brackets, 32mm dia CP waste coupling , rubber plug and chain ,32mm dia B Class GI waste pipe ,15mm dia GM wheel valve, 15mmdia nylon connection , 15mm dia brass nipples 15 mm CP
Fabrication and Supply of MILD STEEL DOOR
Brick jelly 40mm size for filling soak pit inner etc.complete complying with standard specification
Provison for 750 litres HDPE Tank
Towards the cost and supply of Wash basinincluding all charges etc., complete
Electrification arangements
Wiring with 2 x 1.5 sqmm (22 / 0.3) PVC insulated SC unsheathed Copper conductor cable of 1100V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories inflush with wall with 3mm thick hylum sheet cover with TW switch box and 5A F.T. switch and making good of the concealed portion with suitable Colour for open PVC light / Fan points (SD 20)
Supply and run of 2 of 2.5sqmm (36/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V Grade in suitable PVC rigid pipe on wall and ceiling with continuous earth wire connection of 14SWG TC wire and making good of the concealed portion with suitable colour (SD 56)(Open wiring from meter board to switch board)
Supply and fixing of single box type 4'40 W flu fitting complete with electronic ballast with TW round blocks on wall or ceiling with flu tube with PVC unsheathed Copper leads from terminals to the fitting.(SD 87)
Supply and fixing od bulk head fitting with guard (philips / Bajaj / Crompton / K light ) suitable for incandescent lamp with 60 w bulb.(SD 84)
Supply and run of 2 of 4 sq.mm (56/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V grade on 7/20 GI bearer wire for service connection mains (SD 65)
Supply and fixing of 15 A 3 pin combined flush type wall socket with 15A flush type switch on suitable TW box(SD 136) (Excluding wiring for plug point) (IF Necessarry)
Supply and fixing of TNEB meter Board suitable for 32A Single Phase service connection with 32A Fuse unit (500V) 32A neutral link and earth link (1" x 1/8" Copper flat) on TW plank of size 375mm x 300mm x 19mm with supporting TW reepers of 1" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit.(SD 125)
Supply and fixing of 25mm dia GI pipe
Supply and fixing of 11W CFL bulb
5.PROVIDING FENCING AND ALIED WORK TO OSR LAND IN ANDARKUPPAM VILLAGE
Earth work Excavation in all classes of soils except hard rock in Hard Ordinary soil with initial lead and lift including all other charges and labour charges etc,.
C.C 1:3:6 Mix Using 40mm ISS HBG Metal including cost and conveyance and all materials and all labour charges etc,.Completed.
Supply and Fixing of Precast RCC post of Size 0.15 m X 0.15 m x 2.7 m including cost and Conveyence of all materils etc complete (Local Market Rate )
Supply and Fixing of Precast RCC post of Size 0.10m X 0.10 m x 1.8 m including cost and Conveyence of all materils etc complete (Local Market Rate )
Provision for Supply and Fixing of chain link fencing including cost and conveyance and all labour chages etc Complete pg no 44 s.no 133
Provision for Supply and Fixing of L Angle Size 25x25x4.5 mm including cost and conveyance and all labour chages etc Complete
6. CONSTRUCTION OF THRESHING FLOOR AT PERUVALLUR
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations
Cement Concrete 1:3:6 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Floor finishing with Granolithic flooring in CC 1:2:4 mix using 20 mm ISS metal inckluding cost and conveyance of all materials and labour charges , etc, complete.
Waiting Shed
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed
Supplying and Filling the excavated earth including cost of labour charges for filling etc complete..
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc
RCC 1:1.5:3 Mixusing 20mm HBG metal for all RCC worksexcluding cost and fabrication of reinforcement grill including cost and conveyance and materials of all labour charges etc,.complete.
Above basement
Above basement
Brick work in cm 1:5 mix using good quality of countery bricks including cost and conveyance of all materilas to site and all other labour charegs etc complete..
Upto basement
Above basement
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete.
Upto basement
Above basement
Supply and fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc. complete.
Plastering in CM 1:5 mix, 12mm thickness including cost and conveyance of all materials to site and labour charges etc. complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
AADVIK AND ASSOCIATES
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .