Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹72.9 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹79.4 L+₹6.5 L (8.88%)Rejected-AOC 87 BANERJEE BAGAN LANE SALKIA HOWRAH 711106 | HOWRAH | HOWRAH | WEST BENGAL | 711106 | L-2 | Rejected-AOC L-2 | |
| 3 | L-3₹84.7 L+₹11.8 L (16.1%)Rejected-AOC ALAMPUR BALI ROAD NH 6 HOWRAH 711302 | HOWRAH | HOWRAH | WEST BENGAL | 711302 | L-3 | Rejected-AOC L-3 |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
8 Oct 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager
HRBC Office Compound, Canteen Building, 1st Floor, Munshi Premchand Sarani, Kolkata 700 021
Dry Dock Repairing of M.V. Sagarini (WB-1660) for PW (Roads) Directorate, at Sub-Contractors Yard
2022_TSWL_412407_1
GM/TENDER/22-23/SR/5560
Open Tender
MISC ELECTRICAL WORKS
Item Rate
60 days
Howrah
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
THE SHALIMAR WORKS (1980) LIMITED
₹15,000
Yes
9 Nov 2022
29 Sept 2022
11 Oct 2022
29 Sept 2022
8 Oct 2022
29 Sept 2022
Amount
BLOCKING:
Blocking and unblocking the vessel MV Sagarini (43m. x 11m.) at dock yard with bidder's own arrangements and cost.
PROPELLER:
Dismantling of propeller and propeller shaft (both port and starboard side) including extraction of the Gun Metal (GM) bushes.
New supply and fitting of star board and portside propellers [No. of blades: 4, Diameter: 1000mm., pitch: 820mm., P/D: 0.82, B.A.R.: 0.75. Material: Manganese Bronze Grade Cu-1] Note: Drawing will be provided to the bidder.
New supply and fitting of 02 (two) nos. propeller shafts [4750mm. long, Dia: 85mm. Maximum, AISI 316 Stainless Steel] Note: Drawing will be provided to the bidder.
New supply and fitting of total of 04 nos. of G.M. bushes [02 bush in each shaft of internal Dia 85mm. and BS 1400 LG2] with 04 nos. new cutlass rubber lining, as per existing material, specification, shape and size including supply, machining/turning of new bushes as per existing specification (including the cost of material, machining etc. which shall be borne by the bidder). Note: Drawing will be provided to the bidder.
RUDDER:
Dismantling the sukhan / rudder assembly complete with all nuts and bolts, bush etc. including sukhan / rudder plate for both port and starboard side and refitting after repairing and survey by the Engineer & Chief Ship Surveyor, IW&T Department, Govt. of West Bengal.
Fitting fixing of complete rudder assembly (both sides) after supplying and fitting of 02 (two) nos. new rudder plates (dimension: 1050mm. X 1025mm., 8mm. thick with 20mm. Diameter R/BAR Frame, G.M. bush [BS 1400 LG2], nut and bolts etc. including necessary machining, welding as per requirement for both port and starboard side. (The cost of all materials and machining shall be at bidder's own expense). Copy of drawing for Rudder shall be provided to the bidder.
STEERING:
Repairing the tie rods by supplying and fitting new tie rod pins after checking the alignment of the rods and also changing the steering arm pin and new making and fitting fixing of bush and re-assembling. (Steering system is electro-hydraulic steering gear).
Servicing the power pack assembly by changing the metal filter and replacing the solenoid valve with new solenoid valve, including supplying of necessary spares required for servicing and replacement at bidder's own cost.
GEAR BOX:
Servicing the gearbox FD-300 (CHINA make reverse reduction hydraulic marine gearbox), both port and starboard side, by replacing the filter, 28 x 2 = 56 clutch plates, oil seals, sealing ring, piston ring, gasket set etc. including dismantling, fitting, fixing, reassembling. Supply of new spares to be made by the bidder at bidder's own cost. RE-FITTING the Stern Gear assembly after survey.
Changing and new fitting of remote and control cable connected with engine and gearbox, both port and starboard side, including fitting, fixing and supply of materials at bidder's own cost.
TANKS:
Opening the manhole of HSD reserve tank, both port and starboard side and cleaning the tank and checking the plates for thickness / leakage and repairing the same by cutting, welding plate, etc. and refitting the manhole properly with new gasket, including supply of required material at bidder's own cost.
Opening the manhole of sewage tank and checking the thickness of plates for leakage and repairing the same by cutting, plate welding etc. and refitting the manhole with new gasket and new nuts and bolts etc. (supplied by bidder at his own cost).
Opening the manhole of HSD service tank both port and starboard side, also service tank for Diesel Generator set as well as Bilges tank and clearing the tanks and checking for leakages, if any, and welding if required and refitting as per original arrangement with new gasket and fitting fixing as per existing arrangement. Also making new arrangement of drain line with valve for draining of water and sludge and dirty oil of HSD service tank. (The materials required shall be supplied by the bidder at his own cost).
Opening the manhole of water tank both port and starboard side and cleaning and checking the water tank for leakage and repairing the same by welding if required and refitting the same with new nuts, bolts, gaskets etc. supplied by the bidder at his own cost.
New making / supply and replacing 05 nos. nut bolts of hinges of the electric motor operated ramp one by one of size approx. 80mm x 330mm bolt [70mm. Dia upto 120mm. length, 80mm. Dia length upto 130mm., Bolt Head: 80mm. length and Dia 160mm. and M70 nut of 70mm. length;] and with new making of proper lubricating system and proper locking system of nut. Copy of Drawing of details of existing ramp fixing arrangement shall be provided to the bidder. (All materials required shall have to be supplied by the successful bidder at his own cost). Note: There is no bollard on the ramp in the existing design of the ramp. 02 (two) nos. bollards are to be fabricated and fixed by the bidder on the ramp as a separate item of work (other than this item of work) mentioned in this Schedule. Therefore, the bidder is to analyse the existing ramp fixing designed specification and arrangement vis-a-vis capacity of the hinge bolts to take additional load that will arise from the pulls at the two said bollards on the ramp at the time of mooring while landing on a jetty. The bidder is to get the said change from the existing ramp details approved by the Engineer & Chief Ship Surveyor.
Supply and fixing by welding 02 nos. single bollard of height 1' and Dia 4'' on extreme end of the ramp, both port and STBD side, for mooring the vessel during berthing on a jetty. Designing the bollards, including analysing its effect, if any, on the ramp hinge (to find out if the existing ramp hinge is of sufficient capacity) at time of mooring on to a jetty will have to be ascertained by the bidder at his own cost as this is a new arrangement and is a change from the existing arrangement. Drawing of the bollards on the ramp will have to be submitted. Note: The bidder is to get the change (fabricating and fixing of two bollards on the ramp) from the existing ramp details approved by the Engineer & Chief Ship Surveyor.
Repairing the under surface portion of 5.5m. X 4.5m. ramp by cutting, grinding, continuous welding of 8mm. MS Plate of different sizes stated below after removing the sections of the plates which have failed and welding the new plates as below: 1) 1.88m. x 0.15m. x 0.008m. (Thickness) - 2 nos. 2) 3m. x 0.20m. x 0.008m. (Thickness) - 5 nos. 3) 0.26m. x 0.22m. 0.008m. (Thickness) - 10 nos. 4) 0.31m. x 0.10m. x 0.008m. (Thickness) - 20 nos. 5) 0.48m. x 0.26m. x 0.008m. (Thickness) - 5 nos. Copy of Drawing of existing ramp details shall be provided to the bidder.
Repairing the ramp-wire-rope-pulley (both port and starboard side) of by dismantling the pulley and opening and then replacing the bearing with new bearing and greasing. Reassembling the entire pulley properly to make it fit for operation (including material supplied by the bidder at his own cost). Note: Total ramp weight - 5.5 tons.
Fabricating and fixing a guide for the wire rope so that it may not come out from the groove of the ramp pulley (including material supplied by the bidder at his own cost). Note: This shall be a new arrangement which is not existing at present.
DECK RAILING:
Repairing the deck railing by cutting the worn out pipe and fitting 1.25'' and 2'' Dia pipe of approx. length 200m. and 150m. of minimum 1.6mm. thickness GI pipe by welding, grinding, painting etc. Cost of materials and labour charges shall be borne by the bidder.
MAST LADDER:
New making and fixing two nos. ladder on mast (vertical height of high mast from the deck is 3000mm.) of ramp, both port and STBD side, for providing access to ramp lifting pulley on top of the mast for servicing of pulley and light including supply of material, welding etc at bidder's own cost.
New making and fitting two nos. I section on port and STBD side for guiding the mooring rope (Poly propylene rope) including supply of materials at bidder's own cost. This arrangement is to prevent the mooring rope from getting entangled with electric winch wire ropes / link chain at the time of berthing / landing on a jetty.
ENGINE ROOM VENTILATOR:
Servicing of port and STBD side blowers by dismantling, bearing changing, alignment checking etc. and re-assembling and testing. Heat burnishing of 02 nos. blower motor. Cost of all materials / spares, labour shall be at bidder own expense.
Repairing the port and STBD side blower (ventilator for Engine room) head cover by cutting the worn out damaged M.S. Plates and fitting fixing, welding of 6mm. thickness plates for each of the blowers [approx. size (1) 2.6mtr. x 0.25mtr. ------ 02 nos., and (2) 2.6mtr. x 0.1mtr. - 04 nos. for each blower], including cost of materials and labour charge to be borne by the bidder.
DORMITORY ACCOMMODATION IN M.V. SAGARINI:
New making one no. new bed of size 2m. x 0.88m. with 2'' angle, plate etc. and fitting fixing on the Master's room by welding including supply of all materials at bidder's own cost.
WINDOWS TO OPEN OUTSIDE INSTEAD OF THE EXISTING ARRANGEMENT:
Two nos. water wiper assembly is to be replaced with new wiper assembly including supply, fitting, fixing complete at bidder's own cost.
ADDITIONAL FACILITIES IN KITCHEN AND ACCOMMODATION OF CREW:
Supply and properly fitting 4 nos. of 18" wash basin with water tap and connected pipe and also supply and new fitting one no. Indian style pan.
ELECTRICAL SYSTEM CHECKING AND REPAIR:
Megger testing for verifying condition of electrical insulation, resistance, etc. and putting back the electrical system to its original condition. The bidder shall have to bear the cost of materials required for the purpose, including hiring the testing equipment and changing of electrical wire where required. Note: M.V. Sagarini was manufactured in the year 2017 and commissioned into service at Lot-8, Kakdwip in December, 2017.
Fully checking the Navigational Lighting Panel, general lighting system, navigation lighting system, junction box and rectify, if necessary, with change of required materials.
Heat varnishing of all motor and transformer as listed below. 1) Anchor motor 05 hp - 02 nos. 2) Ramp motor 7.5 hp - 01 no. 3) G S Pump motor – 03 hp - 02 mos. 4) Steering Motor - 03 hp - 01 nos. 5) F. Oil transfer Motor – 02 hp - 01 no. 6) Fresh water motor – 02 hp - 01 no. 7) Sea water motor - 02 hp -01 no. 8) Sewage motor 03 hp - 01 no.
Fully checking and servicing of alternator of 50 KVA and 30 KVA DG including changing of necessary spares.
PROTECTIVE ZINC ANODE:
Supply and fitting fixing of 20 nos. Zinc anode to prevent corrosion of plates and other parts including cost of materials and labour charges.
Opening the 24 nos. x 18 studs = 432 studs of 18 nos. man holes on the deck and replacing the said nut & studs by stainless steel nuts and studs with 55 X 3mm. Rubber gasket for each nut. Note: Existing: M16 bolt.
ENGINE SILENCER:
Complete dismantling the duct line / heat insulator of the main engine silencer pipe, by dismantling the galvanized sheet, removing all the glass wool on both sides, port and STBD side, and cutting and taking out the worn out silencer pipe with flange and fitting new 7" MS pipe (Heavy gauge) of minimum 1.8 mm thickness, length 15" x 02 nos. , dia. 7" and 5 bends x 02 nos. = 10nos. bends of same gauge and 04 nos. flange and connecting the water line with 4" dia. new coupling as per sample by cutting , welding , grinding etc. (including all materials & labour charges for fitting all the duct lines as per original arrangement)
PIPE LINE REPLACEMENT / REPAIRING:
Repairing the pipe line by cutting and taking out the old pipes, flange , bend and fitting fixing with MS ASTM 106 Grade B pipe of different Dia , Different length and for Different sections as follows: The rate is inclusive of all materials and labour charges to be borne by the bidder.
VALVES SERVICING:
Servicing of 04 nos. 125 mm sea water main valve by opening, machining, grinding, gasket and seat setting of the valves in pipe line complete. All materials to be supplied by bidder at his own expense.
Servicing of 06 nos. 65 mm bilges valve by opening machining, grinding, gasket and seat setting including fitting fixing the valve in pipe line complete.
Re-fitting of ship-side valves during survey after repairing / servicing.
HEAT EXCHANGER, TURBO CHARGERS, SAFETY ALARMS:
Pressure testing of heat exchanger of main engines (02 nos.), and axial and vertical end play setting of turbo chargers of two main engines and cleaning of charging alternator, exhaust manifold, lubricating oil collar of both port and STBD side 270 BHP main engines of the vessel.
Pressure testing of heat exchanger and cleaning of exhaust mainfold, Dynamo, Changing of all hoses for 30 KVA and 50 KVA DG. , including of axial and vertical end play setting of turbo charger for 50 KVA DG set. Supply of all materials required shall be bidder's own cost.
Checking. Servicing and rectification, if required, of safety alarms.
PAINTING:
Removing the rust and other organic and inorganic matter from the exterior sides of bottom plates of M.V. Sagarini and the left hand side and right hand side of the hull (below water level at full load ) by sand blasting, wire brushing and chiselling where required. Painting will be done as follows : - Exterior hull upto load water line : a. Zinc coating : 100 micron. b. Epoxy polymer : 01 coat. c. High build epoxy mastic : 01 coat. d. Epoxy tie-coat. e. Co- polymer binder Antifouling. 1) Bottom plate Length Frame 00 to Frame 86 = 43m. Width = 11m. Total Area = 473 sqm. 2) Side wall = 10.925 + 67.48 + 18.01 = 96.5 x 2= 193 sqm. 3) Forward and Backward transom = 15.33 + 11.80 = 27.13 sqm.
Removing the rust and stains by sand blasting, wire brushing, scraping by emery paper or using grinding machine for the same and cleaning the surface for dust and stain free by using blower or cotton cloth and cleaning & drying of bilges and then applying non corrosive marine epoxy primer paint one coat and 2nd coat by painting marine epoxy black paint ( or colour as specified by engineering in charge) by spray machine or using by brush where machine is not accessible( including cost of paints, brush, thinner, washing materials, hiring machine, labour cost etc.) on following of MV Sagarini. a) Ramp -------------------------------- 468.56 sqm b) Inside side shell--------------------193.01 sqm c) Bulkhead ( Transverse )---------- 257.6 sqm d) Bulkhead ( Longitudinal )---------- 278.08 sqm e) Inside transom ---------------------- 27.13 sqm f) Inside of Deck ------------------------ 473.00 sqm g) Water tank--------------------------- 19.20 sqm h) Fuel tank ---------------------------- 20.80 sqm i) Sewage tank ------------------------ 9.91 sqm j) Checker plate ----------------------- 220.00sqm k) Add stiffeners 30% of total Inside area 1857.29 sqm --------- 557.19sqm Total area 2524.48 sqm For two coats, 2524.48 x 2 = 5048.96 sqm
Removing the rust and stains by chiselling, wire brushing, scraping by emery paper or using grinding machine for the same and cleaning the surface for dust and stain free by using blower or cotton cloth/ waist and then applying one coat non corrosive marine epoxy primer Ren/Black/Grey paint and 2nd coat by marine epoxy paint ( colour as specified by engineer in charge) and top coat by polyurethane to protect the epoxy from UV rays of sunlight by spray machine or using by brush where machine is not accessible( including cost of paints, brush, thiner, washing materials, hiring machine, labour cost etc.) on following of MV Sagarini. a) Ramp -------------------------------- 49.5 sqm b) Deck Outside-----------------------473.00 sqm c) Ladder Room----------------------- 44.00 sqm d) Store and bathroom -------------- 42.50 sqm e) Kitchen ------------------------------ 30.96 sqm f) Cabin Outside ------------------------95.71 sqm g) Bathroom and 04 nos Cabin ----- 38.616 sqm h) Deck house inside ----------------- 357.08 sqm i) Wheel house outside --------------- 35.92 sqm j) Add stiffeners 30% of total Inside area 291.36 sqm ------------ 87.40 sqm Railing, pipe , piller, bollard, Fender, etc, lump sum ------------- 200.00 sqm Total area 1454.68 sqm For three coats, 1454.68 x 3 = 4364.04 sqm
White lac varnishing the inside of wheel house complete, approximate area 40sqm. The job is to be done after completing all repairing works, including varnishing of 04 (four) nos. of Doors.
The damaged and corroded portion of the main deck plate to be removed by gas/electrode (as appropriate) cutting and followed by grinding to prepare edges as per USG report and in consultation with Engineer & Chief Ship Surveyor, IW&T Directorate, Govt. of West Bengal. The cropped portion to be reconstructed by butt welding of 10mm. thick Hot Rolled Steel plates conforming to IS: 2062 - Gr. - B specification or equivalent. Supply of HR steel plates and all other materials required for completing the job shall be at bidder's own cost. The welding joint to be made as per semi-automatic/automatic electric arc welding/MIG welding. The electrode to be used should be of IRS/LRS approved specification. The total weight of the cropped areas are 1645 kg (approx.) i.e. steel plates of approx. mass of 1645 kg are to be replaced.
Ultrasonic Gauge Test of bottom and deck plate, side shell, forward and backward transom, transverse and longitudinal bulkhead and different internal steel structure at different places as shall be instructed by the Engineer-in-Charge at the time of Dry-Dock Repairing.
Charges for supply of 02 nos. new rudder stock made of forged steel (EN 24). See Drawings for detailed dimension.
Charges for welding the new lashing chain with plate and stock and cementing the flange portion of rudder stock (port and starboard) with cement and soda (materials to be supplied by agency).
Cleaning of mud, sediments from Engine Room Bilges Area.
JANA AND BROTHERS
G. P. ENTERPRISE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .