Loading…
Loading…
Tender Value
₹3.9 L
EMD Value
₹7,840
Closing Date
28 Sept 2026, 4:00 pmDue today
EXEN CRD SMC
EXEN CRD SMC
Construction of lane from house of Proffessor Ghulam Rasool to house of Ghulam Ahmad Bhat at Degdarhar Zoonimar.
2026_HAUDD_324535_4
ENIT/72/CRD/SMC/DT.14-09-2026
Open Tender
Civil Works
Percentage
10 days
CITY ROADS SMC
REFER TENDER DOCS
2 documents required · 2 mandatory
₹200
MUNICIPAL ACCOUNT
₹7,840
28 Sept 2026
14 Sept 2026
29 Sept 2026
14 Sept 2026
28 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 15 | No. | 20 | ₹300 |
| 2 | Surface dressing of ground including removing vegetation and inequalities, not exceeding 15cm deep and disposal of the rubbish beyond SMC limits in all kinds of soils including all its leads, lifts, loading, unloading, head load (if any) costs & carriages etc., complete. | 77 | Sqm | 24.12 | ₹1,857.24 |
| 3 | Providing and laying stone soling, duly hand-packed and properly rammed, including dressing, levelling, labour, materials and all costs of loading, unloading and carriage, complete in all respects as directed by the Engineer-in-Charge. | 16 | Cum | 900 | ₹14,400 |
| 4 | P/L, in position cement concrete of specified grade including curing but excluding the cost of centering & shuttering. All work up to plinth level in 1:4:8 (1cement: 4 coarse, sand: 8 graded stone aggregate of 40 mm Nominal size (Crushed) all inclusive leads, lifts, loading, un-loading, head load (if any) cost and carriage of material involved complete. | 28 | Cum | 5,500 | ₹1,54,000 |
| 5 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) all inclusive leads, lifts, loading, unloading, head load (if any) costs and carraiges complete. | 28 | Cum | 7,500 | ₹2,10,000 |
| 6 | Centering & Shuttering including strutting propping etc. and removal form work for foundation, footings bases of columns blocks etc. complete. | 40 | Sqm | 286.35 | ₹11,454 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1094848.xls
BOQ • 0.28 MB
NIT72DATECIVILEXTENSION1ST.pdf
PDF • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .