| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.2 LAccepted-Finance 216 UGF RAM VIHAR ANAND VIHAR DELHI 110092 | SHAHDARA | DELHI | 110092 | L1 | Accepted-Finance Being lowest | |
| 2 | L2₹28.1 L+₹89,855 (3.30%)Accepted-Finance | L2 | Accepted-Finance Not being lowest | |
| 3 | L3₹30.6 L+₹3.4 L (12.5%)Accepted-Finance | L3 | Accepted-Finance Not being lowest | |
| 4 | L4₹37.1 L+₹9.8 L (36.2%)Accepted-Finance | L4 | Accepted-Finance Not being lowest |
| Sl No | Description | Qty | Unit | POONAM ENTERPRISES L4 | V M CONSTRUCTION L1 | M/S VERMA BUILDER L3 | M/S Amrit Pal Singh & Sons L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of old brick tiles or terracing tiles,single layer on roofs complete all as specified and directed by Engr-in-charge. | 1,600 | Sqm | 20 ₹32,000 | 50 ₹80,000 | 60 ₹96,000 | 10 ₹16,000 Lowest |
| 2.00 | Demolition of existing mud in roofs of any thickness including plastering and leaping, whether full thickness removed or only a part there of, and removing of mud as directed by Engr-in-charge. NOTE- (1) demolished mud should be removed from the site everyday no stack can be made. (2) Mud that is recovered from the roof should be removed by bags not direcltly thrown from roof. | 480 | Cum | 150 ₹72,000 Lowest | 200 ₹96,000 | 150 ₹72,000 Lowest | 200 ₹96,000 |
| 3.00 | Removing excavated material exc 1.5Km and not exc 5.00 km outside of MOD Land and depositing where directed at a level n exc 1.5m above the starting point complete all as specified and directed by Engr-in-Charge. | 480 | Cum | 50 ₹24,000 Lowest | 150 ₹72,000 | 400 ₹1,92,000 | 100 ₹48,000 |
| 4.00 | Roughening the surfaces of old concrete roof surfaces by picking, sweeping clean and washing down with water to remove dust etc including removal of old treatment of any description and removing the debris to a distance of n.exc 50 m away from plinth protection. | 1,800 | Sqm | 30 ₹54,000 | 40 ₹72,000 | 20 ₹36,000 Lowest | 20 ₹36,000 Lowest |
| 5.00 | M&L for cutting out cracks to V-section in existing roofs or terrace cleaning out and filling solidly with a hot mixture of bitumen and clean dry sand in cement mortar 1:1 (by weight) complete all as specified and directed by Engr-in-charge. | 250 | RM | 40 ₹10,000 Lowest | 50 ₹12,500 | 70 ₹17,500 | 50 ₹12,500 |
| 6.00 | M&L for PCC 1:2:4, type B1 by using 20mm graded stone aggregate in Providing, cement concrete in roof kerbs or mud stops, rounded or chamfered on edges complete all as specified and directed by Engr-in-charge. | 96 | Cum | 4,200 ₹4,03,200 | 3,000 ₹2,88,000 | 2,200 ₹2,11,200 Lowest | 4,000 ₹3,84,000 |
| 7.00 | M&L for applying cement slurry over existing roof surface @ 3 Kg/Sqm complete all as specified and directed. | 1,800 | Sqm | 50 ₹90,000 | 60 ₹1,08,000 | 25 ₹45,000 Lowest | 30 ₹54,000 |
| 8.00 | M&L for 15mm thick rendering in cement mortar 1:4 (mixed with WPC @ 3% by weight of cement) to brick/concrete wall and roof surfaces finished even & smooth (without using extra cement) with water proofing compound at the rate of 3% by weight of cement or as per the manufacturer’s instructions complete all as specified and directed by Engr-in-charge. Note: WPC shall be measured and paid for separately | 1,800 | Sqm | 180 ₹3,24,000 | 250 ₹4,50,000 | 170 ₹3,06,000 | 100 ₹1,80,000 Lowest |
| 9.00 | M&L for roof treatment with Polymeric membrane (APP based) with non woven Polyester material as reinforcement with following treatments:-
(a) Surface preparation by removal of existing treatment of tar felt treatment/PCC/plaster/loose particle to ensure or clean. Smooth and dry surface and preparing surface (b) Providing & laying a coat of cold applied bitumen 85/25 based primer on entire surface @ 0.300 Ltr/Sqm on dry and clean surfaces.
(c) Providing & laying APP based polymeric membrane of 3mm thickness of weight not less than 3.0 Kg/Sqm with non woven polyester fiber as reinforcement on primed surfaces by torch application with side over laps & joints over laps etc as per manufacture instructions. (d) Finishing of top surfaces by two coat of aluminium paint over a coat of blown bitumen 85/25 grade @ 1.20 Kg/Sqm all as specified and as per manufacture instructions.
(e) Providing test with filling of water for continuous 48 hours. | 1,600 | Sqm | 780 ₹12,48,000 | 300 ₹4,80,000 Lowest | 420 ₹6,72,000 | 450 ₹7,20,000 |
| 10.00 | M&L A glass fibre reinforced elastomeric liquid applied waterproofing membrane. Asian Paints SmartCare Damp Proof or equvalent upon curing, forms a thick, seamless, durable membrane thus offering ultimate waterproofing complete as per manufacturers instructions work shall be executed upto G+3 storey bldg with necessary steel scaffolding as required complete all as specified. Note- The work will be carried on chajja upto G+3 storey blgd with scaffolding all rates includes in it | 200 | Sqm | 780 ₹1,56,000 | 450 ₹90,000 | 300 ₹60,000 Lowest | 400 ₹80,000 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
11 Aug 2026, 6:00 pmClosed
LT COL MANISH E WASNIK
GE (CENTRAL) DELHI CANTT-10
8826/TOKEN-28/2026-27
2026_MES_778567_1
GE/TOKEN-28/2026-27
Open Tender
Civil Works
Item Rate
270 days
GE (CENTRAL) DELHI CANTT-10
AS PER NIT
9 documents required · 9 mandatory
₹500
Yes
GE (CENTRAL) DELHI CANTT-10
₹80,000
Yes
18 Aug 2026
14 Jul 2026
13 Aug 2026
14 Jul 2026
11 Aug 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old brick tiles or terracing tiles,single layer on roofs complete all as specified and directed by Engr-in-charge. | 1,600 | Sqm | - | - |
| 2 | Demolition of existing mud in roofs of any thickness including plastering and leaping, whether full thickness removed or only a part there of, and removing of mud as directed by Engr-in-charge. NOTE- (1) demolished mud should be removed from the site everyday no stack can be made. (2) Mud that is recovered from the roof should be removed by bags not direcltly thrown from roof. | 480 | Cum | - | - |
| 3 | Removing excavated material exc 1.5Km and not exc 5.00 km outside of MOD Land and depositing where directed at a level n exc 1.5m above the starting point complete all as specified and directed by Engr-in-Charge. | 480 | Cum | - | - |
| 4 | Roughening the surfaces of old concrete roof surfaces by picking, sweeping clean and washing down with water to remove dust etc including removal of old treatment of any description and removing the debris to a distance of n.exc 50 m away from plinth protection. | 1,800 | Sqm | - | - |
| 5 | M&L for cutting out cracks to V-section in existing roofs or terrace cleaning out and filling solidly with a hot mixture of bitumen and clean dry sand in cement mortar 1:1 (by weight) complete all as specified and directed by Engr-in-charge. | 250 | RM | - | - |
| 6 | M&L for PCC 1:2:4, type B1 by using 20mm graded stone aggregate in Providing, cement concrete in roof kerbs or mud stops, rounded or chamfered on edges complete all as specified and directed by Engr-in-charge. | 96 | Cum | - | - |
| 7 | M&L for applying cement slurry over existing roof surface @ 3 Kg/Sqm complete all as specified and directed. | 1,800 | Sqm | - | - |
| 8 | M&L for 15mm thick rendering in cement mortar 1:4 (mixed with WPC @ 3% by weight of cement) to brick/concrete wall and roof surfaces finished even & smooth (without using extra cement) with water proofing compound at the rate of 3% by weight of cement or as per the manufacturer’s instructions complete all as specified and directed by Engr-in-charge. Note: WPC shall be measured and paid for separately | 1,800 | Sqm | - | - |
| 9 | M&L for roof treatment with Polymeric membrane (APP based) with non woven Polyester material as reinforcement with following treatments:-
(a) Surface preparation by removal of existing treatment of tar felt treatment/PCC/plaster/loose particle to ensure or clean. Smooth and dry surface and preparing surface (b) Providing & laying a coat of cold applied bitumen 85/25 based primer on entire surface @ 0.300 Ltr/Sqm on dry and clean surfaces.
(c) Providing & laying APP based polymeric membrane of 3mm thickness of weight not less than 3.0 Kg/Sqm with non woven polyester fiber as reinforcement on primed surfaces by torch application with side over laps & joints over laps etc as per manufacture instructions. (d) Finishing of top surfaces by two coat of aluminium paint over a coat of blown bitumen 85/25 grade @ 1.20 Kg/Sqm all as specified and as per manufacture instructions.
(e) Providing test with filling of water for continuous 48 hours. | 1,600 | Sqm | - | - |
| 10 | M&L A glass fibre reinforced elastomeric liquid applied waterproofing membrane. Asian Paints SmartCare Damp Proof or equvalent upon curing, forms a thick, seamless, durable membrane thus offering ultimate waterproofing complete as per manufacturers instructions work shall be executed upto G+3 storey bldg with necessary steel scaffolding as required complete all as specified. Note- The work will be carried on chajja upto G+3 storey blgd with scaffolding all rates includes in it | 200 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_872014.xls
BOQ • 0.34 MB
tenderpage.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .