| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | ₹3.0 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹3.0 L+₹3,112.51 (1.05%)Accepted-Finance | ₹3.0 L+₹3,112.51 (1.05%) | L2 | Accepted-Finance 2nd Lowest |
| 3 | L3₹3.0 L+₹6,076.81 (2.05%)Accepted-Finance | ₹3.0 L+₹6,076.81 (2.05%) | L3 | Accepted-Finance Highest |
Tender Value
₹3.0 L
EMD Value
₹5,929
Closing Date
6 Mar 2026, 12:00 pmClosed
Executive Officer,Pedong Panchayat Samity
Pedong Bazar,PO PS-Pedong,Dist-Kalimpong
Construction of Community Toilet at Kage Choiling Gumba within Pedong GP under Pedong Panchayat Samity
2026_GTA_1015591_5
10(10)/PDG/EO/15th CFC/25-26
Open Tender
CIVIL WORKS
Percentage
60 days
Pedong GP
Please refer Tender documents.
2 documents required · 2 mandatory
₹350
₹5,929
26 May 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation trenches or drains in all sorts of soils (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m as directed. The item includes necessary trimming the sides of trenches, ievelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1500mm. | - | M3 | 119.27 | - |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). | - | M3 | 77.54 | - |
| 3 | Filling in foundation or plinth by fine sand in layers not exceeding 150mm as directed and consolidating the same by thorough saturation with water ramming complete including the cost of supply of sand. (Payment to be made om measurement of finished quantity). | - | m3 | 1,441.11 | - |
| 4 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. | 1 | m2 | 50 | ₹50 |
| 5 | Cost of stone boulder 150 mm size delivered ans stacked at site. | - | m3 | 1,526.4 | - |
| 6 | (I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor.
(a) 1:3:6 proportion
(B) With N.B. Variety stone metal | 0.2 | m3 | 5,840.38 | ₹1,168.08 |
| 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. | - | m3 | 7,325.17 | - |
| 8 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. | - | m2 | 400.8 | - |
| 9 | Reinforcement for reinforced concreate work in all sorts of structures including ditribution bars, stirrups, binders, etc. initial straightening and removal of loose rust (if necessary ), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a)For works in foundation, basement and upto roof of ground floor/ upto 4m. (Tor steel/ Mild steel) I. ( JSW / JSPL / SHYAM / SRMB / BMASL / ELCTROSTEEL / SSL.) | 0.44 | MT | 71,943.38 | ₹31,654.37 |
| 10 | Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth | - | m3 | 7,685.48 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_2494919.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .