| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹44.9 LAdmitted-Finance CIVIL LINE 4 BEHIND DEV VAHAN PALWAL 2021R1824 | NA | NA | 121004 | +7.00% | ₹44.9 L | L1 | Admitted-Finance |
| 2 | L2₹46.6 LAdmitted-Finance CHAUDHARY APARTMENT NEAR HARYANA PUBLIC SCHOOL BALI NAGAR PALWAL 2021R1085 | 2021085 | +11.00% | ₹46.6 L | L2 | Admitted-Finance |
| 3 | L3₹48.0 LAdmitted-Finance NEAR RADHA KRISHNA MANDIR LOHINA HODAL PALWAL HARYANA 121106 | HODAL | PALWAL | HARYANA | 121106 | +14.25% | ₹48.0 L | L3 | Admitted-Finance |
Tender Value
₹42.0 L
EMD Value
₹84,000
Closing Date
30 Apr 2026, 5:00 pmClosed
MANOJ KUMAR
Municipal Council Palwal
Construction of RCC Drain from Main Road (Bass Moholla) to Hathin Road Ward 26 MC Palwal
2026_HRY_517260_1
20269C190C28 4CF3 43CC B753 38F68FD4C02F294ULB
Open Tender
Civil Works
180 days
Palwal
2 documents required · 2 mandatory
₹2,000
₹84,000
Yes
5 May 2026
24 Apr 2026
1 May 2026
24 Apr 2026
30 Apr 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate] | - | cum | - | - |
| 2 | [5.70]Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. [Through Rate] | - | cum | - | - |
| 3 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] | - | cum | - | - |
| 4 | [6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level [Through Rate] | - | cum | - | - |
| 5 | [6.30.2]Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. [Labour Rate] | - | Sqm | - | - |
| 6 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Labour Rate] | - | Sqm | - | - |
| 7 | [6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate] | - | Kg. | - | - |
| 8 | [6.43]Providing, hoisting and fixing above plinth level up to floor four level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] | - | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_596132.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid