| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42.1 LAdmitted-Finance 170 SHASTRI NAGAR PRAVESH VIHAR MEERUT UTTAR PRADESH 170 SHASTRI NAGAR PRAVESH VIHAR MEERUT UTTAR PRADESH 170 SHASTRI NAGAR PRAVESH VIHAR MEERUT UTTAR PRADESH MEERUT MEERUT UTTAR PRADESH 250004 UDYAM UP 56 0047838 | MEERUT | UTTAR PRADESH | 250004 | -3.54% | ₹42.1 L | L1 | Admitted-Finance |
| 2 | L2₹42.3 LAdmitted-Finance | -3.10% | ₹42.3 L | L2 | Admitted-Finance |
| 3 | L3₹42.4 LAdmitted-Finance | -2.78% | ₹42.4 L | L3 | Admitted-Finance |
Tender Value
₹43.6 L
EMD Value
₹87,000
Closing Date
26 May 2026, 2:00 pmClosed
General Manager (T) UPPCL Lucknow
Office of the General Manager (T) UPPCL Lucknow
Levelling of 200 mtr. Running Track and providing seating arrangements near running track at JNV Gariyaband (Chhattisgarh)
2026_UPPRC_1149910_1
4/GM(T)/UPPCL/2026-27/DATE 15.05.2026
Open Tender
Civil Works
150 days
JNV Gariyaband (Chhattisgarh)
As per Bid documents
2 documents required · 2 mandatory
₹11,800
Project Manager UPPCL
₹87,000
4 Jun 2026
18 May 2026
26 May 2026
18 May 2026
26 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Discription of work | - | - | - | - | 1 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 5 km, also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc., complete. | - | Cum | 681.59 | - | 2 |
| 3 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | Sqm | 17.12 | - | 3 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | - | CUM | 253.27 | - | 4 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth,
sides of foundations etc. in layers not exceeding 20cm in depth,
consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | - | CUM | 190.71 | - | 5 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 Cement : 5 coarse sand (zone-III) : 10 graded stone aggregate 40 mm nominal size) | - | CUM | 6,342.6 | - | 6 |
| 7 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | - | CUM | 681.59 | - | 7 |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | - | - | - | - | 8 |
| 9 | All works upto plinth level | - | - | - | - | 9 |
| 10 | Concrete of M25 grade with minimum cement content of 330 kg /cum | - | - | - | - | 10 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.