Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 CrAccepted-AOC | ₹4.4 Cr | 1 | Accepted-AOC AGREEMENT DONE ON AS DIVISION LETTER DATE 26.09.2022 |
| 2 | 2₹5.5 Cr+₹1.1 Cr (24.4%)Rejected-Finance | ₹5.5 Cr+₹1.1 Cr (24.4%) | 2 | Rejected-Finance being L2 |
| 3 | 3₹5.5 Cr+₹1.1 Cr (25.4%)Rejected-Finance MORENA | MORENA | MADHYA PRADESH | 476001 | ₹5.5 Cr+₹1.1 Cr (25.4%) | 3 | Rejected-Finance being L3 |
Tender Value
₹5.5 Cr
EMD Value
₹5.5 L
Closing Date
8 Jun 2022, 5:30 pmClosed
Executive Engineer, Water Resources Div, JOURA
Executive Engineer, Water Resources Division, JOURA
On Turnkey Basis Construction of Baghel (Ranipura) Stop Dam at Asan River, as per detailed scope of work but not limited to that.
2022_WRD_198468_1
896/2021-22/etendering/ Ranipura
Open Tender
Civil Works - Others
Turn-key
365 days
Morena
Please refer Tender documents.
16 documents required · 16 mandatory
₹20,000
₹5.5 L
12 Dec 2022
19 May 2022
10 Jun 2022
19 May 2022
8 Jun 2022
20 May 2022
Amount
On Turnkey basis Construction Baghel (Ranipura) Stop Dam at Asan River as per detailed scope of work but not limited to that
On Turnkey basis Construction Baghel (Ranipura) Stop Dam at Asan River as per detailed scope of work but not limited to that
JAI PRAKASH SHARMA CONTRACTOR
M/s Bhagwati Enterprises
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .