| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.2 L+₹97,574.12 (13.5%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Pre Qualification Documents are not Satisfied. |
| Sl No | Description | Qty | Unit | Devarajan L1 | SVB Builders L2 |
|---|---|---|---|---|---|
| 1.00Providing CC Pavement (Without Drain) at SasthiramutluII Street H/O Gendenahalli | |||||
| 2.00 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary as per SS 20 B | 30.52 | Cum | 123.26 ₹3,761.9 Lowest | 123.26 ₹3,761.9 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc. | 34.88 | Cum | 5,162.14 ₹1,80,055.44 Lowest | 5,162.14 ₹1,80,055.44 Lowest |
| 4.00 | Cement concrete 1:2:4 mix using 20mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc. | 21.8 | Cum | 6,556.47 ₹1,42,931.05 Lowest | 6,556.47 ₹1,42,931.05 Lowest |
| 5.00 | Cement concrete 1:1.5:3 mix using 20mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc. | 24.53 | Cum | 7,214.22 ₹1,76,964.82 Lowest | 7,214.22 ₹1,76,964.82 Lowest |
| 6.00 | Centering Charges inclusive of all material and labour charges etc., complete as per standard specification. | 190.75 | Sqm | 516.5 ₹98,522.38 Lowest | 950 ₹1,81,212.5 |
| 7.00 | Provison for Dummy Duct 160mm Dia pipe | 12 | Rm | 430.7 ₹5,168.4 Lowest | 430.7 ₹5,168.4 Lowest |
| 8.00 | Provision for Expansion Joints using Bitumenpad including all etc. complete. | 1 | Nos | 1,500 ₹1,500 Lowest | 1,500 ₹1,500 Lowest |
| 9.00 | Provision for Name Board | 1 | Nos | 4,500 ₹4,500 Lowest | 4,500 ₹4,500 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,10,413 ₹1,10,413 Lowest | 1,25,297 ₹1,25,297 |
Tender Value
₹7.3 L
EMD Value
₹7,500
Closing Date
22 Apr 2025, 3:00 pmClosed
The Block Development Officer(VP), Palacode
Block Development Office, Palacode
Providing CC Pavement (Without Drain) at SasthiramutluII Street H/O Gendenahalli
2025_RDTN_545452_1
Roc.No.158/2025/E2 AGAMT P13
Open Tender
Civil Works
Item Rate
90 days
Block Development Office, Palacode
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹7,500
13 Sept 2025
14 Apr 2025
22 Apr 2025
14 Apr 2025
22 Apr 2025
14 Apr 2025
Amount
Providing CC Pavement (Without Drain) at SasthiramutluII Street H/O Gendenahalli
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary as per SS 20 B
Cement concrete 1:4:8 mix using 40mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
Cement concrete 1:2:4 mix using 20mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
Cement concrete 1:1.5:3 mix using 20mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
Centering Charges inclusive of all material and labour charges etc., complete as per standard specification.
Provison for Dummy Duct 160mm Dia pipe
Provision for Expansion Joints using Bitumenpad including all etc. complete.
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SVB Builders (BID ID -1306327)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .