| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.7 LAccepted-AOC LIG 4 SHARDA VIHAR KORBA C G 495677 | KORBA | KORBA | CHHATTISGARH | 495677 | L-1 | Accepted-AOC Accepted as the bidder attains L-1 status | |
| 2 | L-2₹2.5 L+₹29,500 (13.1%)Rejected-Finance PLOT NO 46 SUGANDHA VIHAR NEAR NEW ERA PROGRASSIVE SCHOOL RAMPUR DIST KORBA 495677 | KORBA | CHHATTISGARH | 495677 | L-2 | Rejected-Finance Rejected as the bidder attains L-2 status | |
| 3 | L-3₹2.7 L+₹48,959 (21.7%)Rejected-Finance FLAT NO LIG 90 M P NAGAR KORBA CHHATTISGARH | KORBA | CHHATTISGARH | 495677 | L-3 | Rejected-Finance Rejected as the bidder attains L-3 status | |
| 4 | L-4₹2.9 L+₹59,500 (26.4%)Rejected-Finance ATAL CHOWK CHANWARIDAND MANENDRAGARH KOREA CHHATTISGARH | KOREA | CHHATTISGARH | 497442 | L-4 | Rejected-Finance Rejected as the bidder attains L-4 status |
| Sl No | Description | Qty | Unit | A A ZILKAR L3 | Pioneer Enterprises L2 | S.S. ELECTRICAL L4 | HARI OM POWER ENGINEERING L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Complete repairing / rewinding of Power Transformer, 2.5 MVA, 33/3.3KV, Sl. No. 2200, Make - Ramakrishna Pvt. Ltd. Scope of Work: i). Rewinding of one limb of HV winding & one limb of LV winding (approx. 274 Kg) with new copper strip (Size- Thickness - 2.80mm & Width - 8.46mm). ii), Re-insulation and repairing of all three limbs of HV and LV windings with replacement of paper covering/ insulating materials and gasket/ cork sheet etc. iii). Labour cost & cost of insulating materials of appropriate class & gaskets etc. shall be in the scope of contractor. iv). Repairing of complete oil leakage. v). Providing & fixing of winding separator etc as required. vi). Scrap copper shall be retained by the contractor. vii). Transportation (to and fro) of the transformer shall be in the scope of contractor. viii). Test certificate of repaired transformer to be submitted at the time of delivery. | 1 | Job | 1,50,000 ₹1,50,000 | 1,40,000 ₹1,40,000 | 1,70,000 ₹1,70,000 | 1,00,000 ₹1,00,000 Lowest |
| 2.00 | Complete repairing / rewinding of Power Transformer, 1600 KVA, 6.6/3.3KV, Sl. No. 4951, Make - Andrew Yule Scope of Work: i). Rewinding of complete all three limbs of HV winding (approx. 322.50 Kg) with new copper strip (Size- Thickness - 2.80mm & Width - 8.46mm). ii), Re-insulation and repairing of all three limbs of HV and LV windings with replacement of paper covering/ insulating materials and gasket/ cork sheet etc. iii). Labour cost & cost of insulating materials of appropriate class & gaskets etc. shall be in the scope of contractor. iv). Repairing of complete oil leakage. v). Providing & fixing of connector copper bus-bar about 35 Kg etc as required. vi). Providing & fixing of winding separator etc as required. vii). Scrap copper shall be retained by the contractor. viii). Transportation (to and fro) of the transformer shall be in the scope of contractor. ix). Test certificate of repaired transformer to be submitted at the time of delivery. | 1 | Job | 1,24,459 ₹1,24,459 | 1,15,000 ₹1,15,000 Lowest | 1,15,000 ₹1,15,000 Lowest | 1,25,500 ₹1,25,500 |
| 3.00Note: 1). Bidders are advised to see the transformers before quoting the offer. 2). Rate offered should be after deducting the scrap value of copper. 3). Job shall be carried out at the contractor's workshop and the job shall be routed through Regional Stores, Dipka Area. 4). To and fro transportation of the transformers is under the bidder's scope. (Please refer to page no. (26-30) of NIT or Additional Clauses in tenders of Transformers in the uploaded tender documents for Additional Clauses in tenders of Transformers repairing / rewinding to safeguard the interest of the company). | |||||||
| 4.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - | - |
Tender Value
₹4.2 L
EMD Value
₹5,300
Closing Date
30 Aug 2025, 5:00 pmClosed
Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Complete repairing / rewinding of 02 Nos. Power Transformers, i). Rating 2.5 MVA, 33/3.3KV, Sl. No. 2200, Make - Ramakrishna Pvt. Ltd. and ii). Rating 1600 KVA, 6.6/3.3KV, Sl. No. 4951, Make - Andrew Yule under Dipka Expansion Project.
2025_SECL_341670_1
SECL/GM/DA/SO(EnM)/ e-tender/25-26/86 dtd-16/08/25
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
4 documents required · 4 mandatory
₹5,300
29 Nov 2025
18 Aug 2025
1 Sept 2025
18 Aug 2025
30 Aug 2025
19 Aug 2025
18 Aug 2025 - 25 Aug 2025
Amount
Complete repairing / rewinding of Power Transformer, 2.5 MVA, 33/3.3KV, Sl. No. 2200, Make - Ramakrishna Pvt. Ltd. Scope of Work: i). Rewinding of one limb of HV winding & one limb of LV winding (approx. 274 Kg) with new copper strip (Size- Thickness - 2.80mm & Width - 8.46mm). ii), Re-insulation and repairing of all three limbs of HV and LV windings with replacement of paper covering/ insulating materials and gasket/ cork sheet etc. iii). Labour cost & cost of insulating materials of appropriate class & gaskets etc. shall be in the scope of contractor. iv). Repairing of complete oil leakage. v). Providing & fixing of winding separator etc as required. vi). Scrap copper shall be retained by the contractor. vii). Transportation (to and fro) of the transformer shall be in the scope of contractor. viii). Test certificate of repaired transformer to be submitted at the time of delivery.
Complete repairing / rewinding of Power Transformer, 1600 KVA, 6.6/3.3KV, Sl. No. 4951, Make - Andrew Yule Scope of Work: i). Rewinding of complete all three limbs of HV winding (approx. 322.50 Kg) with new copper strip (Size- Thickness - 2.80mm & Width - 8.46mm). ii), Re-insulation and repairing of all three limbs of HV and LV windings with replacement of paper covering/ insulating materials and gasket/ cork sheet etc. iii). Labour cost & cost of insulating materials of appropriate class & gaskets etc. shall be in the scope of contractor. iv). Repairing of complete oil leakage. v). Providing & fixing of connector copper bus-bar about 35 Kg etc as required. vi). Providing & fixing of winding separator etc as required. vii). Scrap copper shall be retained by the contractor. viii). Transportation (to and fro) of the transformer shall be in the scope of contractor. ix). Test certificate of repaired transformer to be submitted at the time of delivery.
Note: 1). Bidders are advised to see the transformers before quoting the offer. 2). Rate offered should be after deducting the scrap value of copper. 3). Job shall be carried out at the contractor's workshop and the job shall be routed through Regional Stores, Dipka Area. 4). To and fro transportation of the transformers is under the bidder's scope. (Please refer to page no. (26-30) of NIT or Additional Clauses in tenders of Transformers in the uploaded tender documents for Additional Clauses in tenders of Transformers repairing / rewinding to safeguard the interest of the company).
Total impact of GST for the purpose of CTC
Pioneer Enterprises (BID ID -1179204)
A A ZILKAR (BID ID -1178962)
S.S. ELECTRICAL (BID ID -1179392)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .