Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.1 LAdmitted-Finance | ₹74.1 L | L1 | Admitted-Finance |
| 2 | L2₹75.0 L+₹85,300 (1.15%)Admitted-Finance | ₹75.0 L+₹85,300 (1.15%) | L2 | Admitted-Finance |
| 3 | L3₹78.6 L+₹4.5 L (6.08%)Admitted-Finance | ₹78.6 L+₹4.5 L (6.08%) | L3 | Admitted-Finance |
| 4 | L4₹82.6 L+₹8.5 L (11.5%)Admitted-Finance | ₹82.6 L+₹8.5 L (11.5%) | L4 | Admitted-Finance |
| 5 | L5₹1.2 Cr+₹44.7 L (60.3%)Admitted-Finance D 4 276 KH NO 424 FIRST FLOOR BHAGEL SADAN BANK COLONY ROAD MANDOLI EXTN NEAR JAIL BOUNDARY DELHI 110093 | DELHI | DELHI | DELHI | 110093 | ₹1.2 Cr+₹44.7 L (60.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MGR Fabricators Private Limited L5 | SHREEPAD ENGINEERS L2 | PLANT ENGINEERING PEOPLE PVT LTD L3 | M/S. SHABARI TRADING AND ENGINEERING WORKS L1 | MULTITECHHENGIFAB L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Handling, transportation and erection of MS structural shielding plates of dilution hot cells and its component like back access door, tunnel, shielding plugs etc including their installation, fitting, leveling and alignment, fixing, full welding, LPE testing, cleaning and epoxy painting of MS structural surfaces in complete as per tender document. | 150 | MT | 30,000 ₹45,00,000 | 25,800 ₹38,70,000 | 19,000 ₹28,50,000 Lowest | 22,150 ₹33,22,500 | 23,600 ₹35,40,000 |
| 2.00 | Handling, transportation, cleaning, pickling & passivation of SS containement/box along with the components from INRP stores to Block 106, assembly including installation of tunnel, ducts and sleeves alongwith leveling, supports, tack welding, inspection etc as per specifications and drawings. (Approx Weight ~ 900 Kgs each) | 8 | Sets | 60,000 ₹4,80,000 | 1,12,500 ₹9,00,000 | 47,000 ₹3,76,000 | 28,150 ₹2,25,200 Lowest | 44,250 ₹3,54,000 |
| 3.00 | Welding by GTAW process using approved ER308L filler wires with Argon purging and LP examination of welds for SS 304L ducts/liner to the SS containements/ box. | 400 | Running meter | 2,500 ₹10,00,000 | 700 ₹2,80,000 Lowest | 1,900 ₹7,60,000 | 1,000 ₹4,00,000 | 2,360 ₹9,44,000 |
| 4.00 | Fillet/Flange Welding by GTAW process using approved ER308L filler wires with Argon purging and LP examination of welds for SS 304L pipes/circular sections to the SS containements/ box/pump piping. | 1,400 | inch-dia | 1,100 ₹15,40,000 | 400 ₹5,60,000 Lowest | 920 ₹12,88,000 | 650 ₹9,10,000 | 842.86 ₹11,80,004 |
| 5.00 | Collection of Pumps along with fittings from departemental stores within 12 km distance, Handling, Transportation, Cleaning and Installation on Pump Foundation. It includes physical measurement and cleaning of pump foundation, erection and levelling of baseplate followed by grouting, bolting, installation on pump foundation and dry run testing as per pump manual, technical Specification and design drawings.
Average weight of Centrifugal pumps: approx 125 kg | 32 | Nos | 40,000 ₹12,80,000 | 12,500 ₹4,00,000 | 15,500 ₹4,96,000 | 11,000 ₹3,52,000 Lowest | 14,750 ₹4,72,000 |
| 6.00 | Collection from departmental stores within 12 km distance, Handling, Transportation, Pickling & Passivation and Erection of SS Tanks on EPs/Studs at various elevations. It includes physical measurement, alignment, levelling, erection and welding/bolting of lugs to EPs/Studs as per Nozzle Orientation drawings / equipment layouts, technical Specification and as per directions of EIC. It also includes providing lifting, handling equipments and necessary safety gadgets for working at higher elevations and other consumables & nonconsumables as required. | 110 | MT | 28,000 ₹30,80,000 | 13,500 ₹14,85,000 Lowest | 19,000 ₹20,90,000 | 20,000 ₹22,00,000 | 16,090.9 ₹17,69,999 |
Tender Value
₹1 Cr
EMD Value
₹2 L
Closing Date
12 Jun 2024, 3:00 pmClosed
Project Director,INRPC,NRB
PD office, INRPC, BARC Tarapur, Boisar Maharastra - 401502
Installation of pumps, dilution hotcell and process tanks in various blocks of INRP Project.
2024_NRB_806845_1
BARC(T)/NRB/INRPC/MPT-525/2024
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
365 days
INRPC, NRB(T), BARC
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹2 L
PD office,INRPC,BARC,Tarapur
23 Sept 2024
14 May 2024
14 Jun 2024
14 May 2024
12 Jun 2024
14 May 2024
14 May 2024 - 28 May 2024
28 May 2024
Amount
Handling, transportation and erection of MS structural shielding plates of dilution hot cells and its component like back access door, tunnel, shielding plugs etc including their installation, fitting, leveling and alignment, fixing, full welding, LPE testing, cleaning and epoxy painting of MS structural surfaces in complete as per tender document.
Handling, transportation, cleaning, pickling & passivation of SS containement/box along with the components from INRP stores to Block 106, assembly including installation of tunnel, ducts and sleeves alongwith leveling, supports, tack welding, inspection etc as per specifications and drawings. (Approx Weight ~ 900 Kgs each)
Welding by GTAW process using approved ER308L filler wires with Argon purging and LP examination of welds for SS 304L ducts/liner to the SS containements/ box.
Fillet/Flange Welding by GTAW process using approved ER308L filler wires with Argon purging and LP examination of welds for SS 304L pipes/circular sections to the SS containements/ box/pump piping.
Collection of Pumps along with fittings from departemental stores within 12 km distance, Handling, Transportation, Cleaning and Installation on Pump Foundation. It includes physical measurement and cleaning of pump foundation, erection and levelling of baseplate followed by grouting, bolting, installation on pump foundation and dry run testing as per pump manual, technical Specification and design drawings. Average weight of Centrifugal pumps: approx 125 kg
Collection from departmental stores within 12 km distance, Handling, Transportation, Pickling & Passivation and Erection of SS Tanks on EPs/Studs at various elevations. It includes physical measurement, alignment, levelling, erection and welding/bolting of lugs to EPs/Studs as per Nozzle Orientation drawings / equipment layouts, technical Specification and as per directions of EIC. It also includes providing lifting, handling equipments and necessary safety gadgets for working at higher elevations and other consumables & nonconsumables as required.
SHREEPAD ENGINEERS
PLANT ENGINEERING PEOPLE PVT LTD
MULTITECHHENGIFAB
MGR Fabricators Private Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .