Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC | L1 | Accepted-AOC Lowest Rate | |
| 2 | L2₹12.9 L+₹12,279.22 (0.96%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹13.3 L+₹49,174.56 (3.85%)Rejected-Finance 00 VPO SALWAN 132046 | KARNAL | HARYANA | 132046 | L3 | Rejected-Finance Rejected | |
| 4 | L4₹14.6 L+₹1.9 L (14.6%)Rejected-Finance VPO BIR BANGRAN DISTT KAITHAL | KAITHAL | HARYANA | L4 | Rejected-Finance Rejected | |
| 5 | L5₹17.4 L+₹4.6 L (35.9%)Rejected-Finance | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | The Shaheed Bhagat Singh Cooperative Labour and construction Society Ltd Mundh L2 | THE JAI BHOLE CO-OPERATIVE LABOUR & CONSTRUCTION SOCIETY LTD. L3 | The shri bala ji cooperative labour and construction society bir bangran L4 | The Hari Har Cooperative Labour and Construction Society Limited Ardana L1 | The Assa Singh Cooperative Labour & Construction Society Ltd. Safidon L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | the analysis of the earth filling supply of earth filling transport include loading and unloading the lead of transport of per km rate is 5 rs in portal the rate is not sepate per km the analysis is based on hsr number 4.33 and 3.1.2 and the per km 5 rs above 5km to 15 km the total rate may be calculate combine the hsr items 4.33 and 3.1.2 and add per km rate as per hsr 3.1.2 total rate calculate the 206 rs per cum | 247.5 | cum | 155 ₹38,362.5 | 195 ₹48,262.5 | 180 ₹44,550 | 131.32 ₹32,501.7 Lowest | 198.96 ₹49,242.6 |
Tender Value
₹19.4 L
EMD Value
₹38,740
Closing Date
3 Jun 2026, 5:00 pmClosed
Sh Jai Dev Sharma
Municipal Committee Assandh
Repair of various street in ward no 16 Assandh (Only for L and C Society Ltd.)
2026_HRY_524913_1
2026DF2D1446 F555 4D52 B790 97C99D9FFE52313ULB
Open Tender
Civil Works
Works
130 days
Assandh
2 documents required · 2 mandatory
₹1,000
Yes
₹38,740
Yes
18 Jun 2026
27 May 2026
4 Jun 2026
27 May 2026
3 Jun 2026
27 May 2026
27 May 2026 - 29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | the analysis of the earth filling supply of earth filling transport include loading and unloading the lead of transport of per km rate is 5 rs in portal the rate is not sepate per km the analysis is based on hsr number 4.33 and 3.1.2 and the per km 5 rs above 5km to 15 km the total rate may be calculate combine the hsr items 4.33 and 3.1.2 and add per km rate as per hsr 3.1.2 total rate calculate the 206 rs per cum | 247.5 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_603865.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .