Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45,430Accepted-AOC 37 B PHASE 3 INDUSTRIAL ESTATE GANGYAL JAMMU | ₹45,430 | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹47,500+₹2,070 (4.56%)Rejected-AOC GANGYAL JAMMU | ₹47,500+₹2,070 (4.56%) | L2 | Rejected-AOC NOT THE LOWEST BIDDER |
| 3 | L3₹46,700+₹1,270 (2.80%)Rejected-AOC BYE PASS N H NEAR STATE BANK OF INDIA SIDHRA JAMMU | ₹46,700+₹1,270 (2.80%) | L3 | Rejected-AOC NOT THE LOWEST BIDDER |
| Sl No | Description | Qty | Unit | M/S K S ENGG WORKS L1 | HITECH MECHNICALS L3 | GS ENGG WORKS L2 |
|---|---|---|---|---|---|---|
| 1.01 | Repairs to Lubrication pumping unit no. 04 by way of dismounting the pump from the base frame after unbolting both suction and delivery lines, shifting pump to workshop, dismantling and replacing damaged components of pump. Rebuilding of damaged stainless steel pump shaft by way of depositing SS material at worn out spots and turning, finishing shaft to its original size and specification, cutting key ways. Fabrication of new Stainless Steel shaft sleeves & lantern ring. Repair to impeller & P/F of CI Neck Ring. Repair to bearing housing by way of fabrication p/f of CI sleeve & bearing cover plate along with. bolts. Facing of coupling pulley set for face to face alignment and P/F coupling star L150 & P/F 03 no. bolts along with coupling star L150 and assembling the pump after fitting new components and P/F 6305 ZZ bearing - 02 Nos. and then back shifting to TPH Jammu and fitting on the base frame, making proper alignment with motor and fitting both suction and delivery line. Replacing damaged nuts and Studs/bolts, gasket, gland packing with new one. Coupling pump and motor after making proper alignment and fitting L150 coupling star between coupling halves. Repairing of control panel of the unit 04 by way of replacing its damaged HRC fuses- 03 No., , spare coil 230 V AC for MNX-50, Add on block 2NO- 01 No., Thermal Overload Relay 30-50 Amp-01 no., push button 01 no., jumper wire 01 No. with end terminals. Testing on full load. Complete job includes cost of material and labour charges including carriage charges. | 1 | Job | 45,430 ₹45,430 Lowest | 47,500 ₹47,500 | 46,700 ₹46,700 |
Tender Value
Refer Docs
Closing Date
25 May 2026, 3:00 pmClosed
executive engineer mech. division rtic jammu
Executive engineer mech. division rtic jammu
Repair of Lubrication unit no 04 of lubrication system installed at Lift Irrigation Station, Tawi Pump House Jammu.
2026_IFC_309319_1
NIT 03 OF 2026-27 DT. 04-05-2026
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Executive engineer mech. division rtic jammu
Please refer Tender documents.
8 documents required · 8 mandatory
₹200
Yes
Ex Engineer mech. division Rtic Jammu
Yes
Executive engineer mech. division rtic jammu
20 Aug 2026
4 May 2026
26 May 2026
4 May 2026
25 May 2026
6 May 2026
5 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Repairs to Lubrication pumping unit no. 04 by way of dismounting the pump from the base frame after unbolting both suction and delivery lines, shifting pump to workshop, dismantling and replacing damaged components of pump. Rebuilding of damaged stainless steel pump shaft by way of depositing SS material at worn out spots and turning, finishing shaft to its original size and specification, cutting key ways. Fabrication of new Stainless Steel shaft sleeves & lantern ring. Repair to impeller & P/F of CI Neck Ring. Repair to bearing housing by way of fabrication p/f of CI sleeve & bearing cover plate along with. bolts. Facing of coupling pulley set for face to face alignment and P/F coupling star L150 & P/F 03 no. bolts along with coupling star L150 and assembling the pump after fitting new components and P/F 6305 ZZ bearing - 02 Nos. and then back shifting to TPH Jammu and fitting on the base frame, making proper alignment with motor and fitting both suction and delivery line. Replacing damaged nuts and Studs/bolts, gasket, gland packing with new one. Coupling pump and motor after making proper alignment and fitting L150 coupling star between coupling halves. Repairing of control panel of the unit 04 by way of replacing its damaged HRC fuses- 03 No., , spare coil 230 V AC for MNX-50, Add on block 2NO- 01 No., Thermal Overload Relay 30-50 Amp-01 no., push button 01 no., jumper wire 01 No. with end terminals. Testing on full load. Complete job includes cost of material and labour charges including carriage charges. | - | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
2.pdf
Tender Documents • 0.37 MB
BOQ_1001406.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .