| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.9 LAccepted-AOC | ₹81.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹86.3 LRejected-Finance | ₹86.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹86.6 LRejected-Finance GRAM SAIDPUR KHURD TIKOLI DISTRICT BAGHPAT UTTAR PRADESH PIN CODE 250001 | BAGHPAT | BAGHPAT | UTTAR PRADESH | 250001 | ₹86.6 L | L3 | Rejected-Finance L3 |
| 4 | L4₹87.0 LRejected-Finance GRAM ALIPUR MORNA TEHSIL MAWANA DISTRICT MEERUT UTTAR PRADESH 245001 | 245001 | ₹87.0 L | L4 | Rejected-Finance L4 |
| 5 | L5₹89.1 LRejected-Finance | ₹89.1 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S SUDHIR KUMAR CONTRACTOR L3 | M/S CHHATERPAL SHARMA L2 | NARESH KUMAR L4 | M/S MOHD ASLAM CONTRACTOR L9 | Mukut Bihari Lal Contractor L7 | M/S R.K. GUPTA AND SONS HUF L8 | M/S PUSHPENDER KUMAR SHARMA L5 | M/s Vicky Chaudhary Contractor, Prop. Vicky Chaudhary L6 | mamber singh L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Scrapping Internal Section Of Canal i.e Bed & Slope With Silt Upto 5 Cm i/c all cost of all labour T&P etc Complete as per directed by engineer -in- charge | 11,790 | m2 | 4.5 ₹53,055 | 3.1 ₹36,607.95 | 2 ₹23,580 | 4 ₹47,160 | 4 ₹47,160 | 3.49 ₹41,112.32 | 0.5 ₹5,895 | 4 ₹47,160 | 4 ₹47,160 |
| 2.00 | Earthwork in embankment & daula of canal by Power Of Transported With Earth With Lead beyond 200m and upto 1.00 km including excavation , loading ,unloading ,manual compaction in 20 cm layer , ramming and dressing the surface to the required level , slopes and all lift complete with all applicable taxes i/c all cost of all labour T&P etc Complete as per directed by engineer -in- charge | 35,145 | m3 | 72.5 ₹25.5 L | 124.2 ₹43.7 L | 79.5 ₹27.9 L | 147.6 ₹51.9 L | 101 ₹35.5 L | 139.48 ₹49.0 L | 90 ₹31.6 L | 100 ₹35.1 L | 63.25 ₹22.2 L |
| 3.00 | Brick On Edge Soiling With Straight Over brunt brick on canal service road i/c joints filled with local sand , preparation of base to proper slope ,ramming ,dressing and i/c supply of all material laboure ,t&p etc required for proper completion of work as per directed by engineer -in- charge | 11,790 | m3 | 460.1 ₹54.2 L | 317.47 ₹37.4 L | 465 ₹54.8 L | 400.3 ₹47.2 L | 460 ₹54.2 L | 356.53 ₹42.0 L | 460 ₹54.2 L | 450 ₹53.1 L | 462 ₹54.5 L |
| 4.00 | Extra For daula ( base 2.0 m top width 0.50m, & height 0.50m) Dressing in proper size & shape excluding cost of earth work i/c all cost of all labour T&P etc Complete as per directed by engineer -in- charge | 31,510 | m2 | 4 ₹1.3 L | 2.76 ₹86,967.60 | 2 ₹63,020 | 2.8 ₹88,228 | 3.5 ₹1.1 L | 3.1 ₹97,668.40 | 1 ₹31,510 | 4 ₹1.3 L | 2.5 ₹78,775 |
| 5.00 | Cleaning Thick Bushes & Thorny Jungle Without Uprooting With Disposal | 48,113.52 | m2 | 4.4 ₹2.1 L | 3.04 ₹1.5 L | 2 ₹96,227.04 | 2.8 ₹1.3 L | 4.2 ₹2.0 L | 3.41 ₹1.6 L | 1 ₹48,113.52 | 4 ₹1.9 L | 2 ₹96,227.04 |
| 6.00 | Earth Work in Silt Clearance Of Channal i/c Lead Upto 30 m & Lift 1.50 mtr by manual labour . The earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by engineer-in-charge. | 5,910.38 | m3 | 50 ₹3.0 L | 43.47 ₹2.6 L | 40 ₹2.4 L | 35 ₹2.1 L | 41 ₹2.4 L | 48.82 ₹2.9 L | 40 ₹2.4 L | 60 ₹3.5 L | 50 ₹3.0 L |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
4 Oct 2025, 11:00 amClosed
SE 1ST IWC MEERUT
SE OFFICE 1ST IWC MEERUT
As per the NIT
2025_UPIDC_1078241_13
08/SE-1/2025-26
Open Tender
Civil Works
90 days
Muzaffar Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.5 L
SE OFFICE 1ST IWC MEERUT
25 Dec 2025
28 Sept 2025
4 Oct 2025
28 Sept 2025
4 Oct 2025
28 Sept 2025
2 Oct 2025
Amount
Scrapping Internal Section Of Canal i.e Bed & Slope With Silt Upto 5 Cm i/c all cost of all labour T&P etc Complete as per directed by engineer -in- charge
Earthwork in embankment & daula of canal by Power Of Transported With Earth With Lead beyond 200m and upto 1.00 km including excavation , loading ,unloading ,manual compaction in 20 cm layer , ramming and dressing the surface to the required level , slopes and all lift complete with all applicable taxes i/c all cost of all labour T&P etc Complete as per directed by engineer -in- charge
Brick On Edge Soiling With Straight Over brunt brick on canal service road i/c joints filled with local sand , preparation of base to proper slope ,ramming ,dressing and i/c supply of all material laboure ,t&p etc required for proper completion of work as per directed by engineer -in- charge
Extra For daula ( base 2.0 m top width 0.50m, & height 0.50m) Dressing in proper size & shape excluding cost of earth work i/c all cost of all labour T&P etc Complete as per directed by engineer -in- charge
Cleaning Thick Bushes & Thorny Jungle Without Uprooting With Disposal
Earth Work in Silt Clearance Of Channal i/c Lead Upto 30 m & Lift 1.50 mtr by manual labour . The earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by engineer-in-charge.
M/S CHHATERPAL SHARMA (BID ID -5578993)
M/S SUDHIR KUMAR CONTRACTOR (BID ID -5577741)
NARESH KUMAR (BID ID -5580073)
M/S PUSHPENDER KUMAR SHARMA (BID ID -5581012)
M/s Vicky Chaudhary Contractor, Prop. Vicky Chaudhary (BID ID -5580682)
Mukut Bihari Lal Contractor (BID ID -5580819)
M/S R.K. GUPTA AND SONS HUF (BID ID -5580968)
M/S MOHD ASLAM CONTRACTOR (BID ID -5580393)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid