| Sl No | Description | Qty | Unit | HS Engineering & Marketing Services L1 |
|---|---|---|---|---|
| 1.00List of item(s) / work(s) as per tender documents | ||||
| 10.00 | Expansion bellow 202-R-1,2,3,4 ; COLUMNS REACTORS & PRESSURE VESSELS EQUIPMENT : VESSEL TAG NUMBER : 202-R1/R2/R3/R4 SERVICE : REACTORS MAKE : M/S LARSEN & TOUBRO LIMITED ; EXP.BELLOW,2P-1314-119(J77990-1),PATHWAY ; <H>Ignore make in header text.</> (I)Scope of supply will include procurement of raw material, fabrication, inspection and testing, packing & forwarding and supply of expansion joint as per Drawing nos: J77990-1 Rev.03 and Sl. No.: J77990-1-1 THRU-1-4 . (II)Bellow should confirm to the latest edition of ASME B31.3 and EJMA. (III)Bellow should be of universal design as per latest edition of ASME B31.3 and EJMA. However said drawings may be considered as minimum basic requirements. (IV)Good quality packing shall be ensured to avoid any damage during transportation. (V)Expansion bellows are for reactors 202-R-01/02/03/04. 1 EA represents 1 bellow for each reactor. | 4 | EA | 26,81,271.6 ₹1.1 Cr |
| 20.00 | Expert Supervision for installation of Item Sr. No. 10 ; ; ;
Scope:
1.Per diem charges of 01 no. expert for 08 hours working on normal working days (from Monday to Saturday). 'EA' species 'MANDAY'
2. Boarding , lodging and ineternal transportaion shall be in scope of vendor.vendor to quote accordingly.
3. Submission of post installation report. Note :
1.,,This line item only pertains to supervision during installation of procured material at IOCL refinery site and accordingly engineering days shall be reckoned from the date of handover of equipment for supervision job . Payment shall be made as per daily log sheet signed by IOCL site engineer.
2.,,Completion period for Work Order shall be 2 years from CDD of respective material. In case IOCL is not able to handover the site within period of 2 years from Material CDD due to IOCL Site exigencies , then time extension shall be granted by IOCL to vendor and accordingly the vendor shall provide the supervision services for installation .
3.,,All expenses related to travel , lodgings , boarding & fooding shall be in scope of Vendor .
4.,,IFR suit is compulsory in IOCL battery limit . Job shall be executed as per prevailing safety guidelines at IOCL . EIC / IOCL site engineer decision shall be final in this regard. | 30 | EA | 2,95,129.67 ₹88.5 L |
| 30.00 | METALLIC EXPANSION JOINT,EJSC ; EXPANSION JOINTS,METTALIC MATERIAL SPECIFICATION : SS 304 STANDARD SIZE OVERALL LENGTH mm mm ; METALLIC EXPANSION JOINT,EJSC ; (I)Scope of supply will include procurement of raw material, fabrication, testing and supplying of complete assembly of expansion jo int as per Drawing nos: B-02-G2398 Rev B Sheet 1 of 10 to Sheet 10 of 10 attached as Annexure-I. (II)Bellow should confirm to the latest edition of EJMA. (III)Bellow should be of universal design as per latest edition of EJMA. However said drawings may be considered as minimum basic requirements. (IV)Good quality packing shall be ensured to avoid any damage during transportation. | 1 | EA | 2,34,94,512.99 ₹2.3 Cr |
| 40.00 | BELLOW,EXPANSION,EJ-1,REGENERATOR ; REGENERATOR CYLONE SEPERATOR TAG NUMBER: 08-RB-301 [F/ MATHURA] ; BELLOW,EXPANSION,EJ-1 ; (I)Scope of supply will include procurement of raw material, fabrication, testing and supplying of complete assembly of expansion jo int as per Drawing nos: B-01-G2398 Rev B Sheet 1 of 4 to Sheet 4 of 4. (II)Bellow should confirm to the latest edition of EJMA. (III)Bellow should be of universal design as per latest edition of EJMA. However said drawings may be considered as minimum basic requirements. (IV)Good quality packing shall be ensured to avoid any damage during transportation. | 1 | EA | 72,11,999.46 ₹72.1 L |
| 50.00 | Expert Supervision for installation of Item Sr. No. 30 & 40 ; ; ;
Scope:
1. Per diem charges of 01 no. expert for 08 hours working on normal working days (from Monday to Saturday). 'EA' species 'MANDAY'
2. Boarding , lodging and ineternal transportaion shall be in scope of vendor.vendor to quote accordingly.
3. Submission of post installation report. Note :
1.,,This line item only pertains to supervision during installation of procured material at IOCL refinery site and accordingly engineering days shall be reckoned from the date of handover of equipment for supervision job . Payment shall be made as per daily log sheet signed by IOCL site engineer.
2.,,Completion period for Work Order shall be 2 years from CDD of respective material. In case IOCL is not able to handover the site within period of 2 years from Material CDD due to IOCL Site exigencies , then time extension shall be granted by IOCL to vendor and accordingly the vendor shall provide the supervision services for installation .
3.,,All expenses related to travel , lodgings , boarding & fooding shall be in scope of Vendor .
4.,,IFR suit is compulsory in IOCL battery limit . Job shall be executed as per prevailing safety guidelines at IOCL . EIC / IOCL site engineer decision shall be final in this regard. | 30 | EA | 2,95,129.67 ₹88.5 L |
Tender Value
Refer Docs
Closing Date
1 Apr 2025, 3:00 pmClosed
DGM MATERIALS
DGM(MT) PANIPAT REFINERY AND PETROCHEMICAL COMPLEX - 132140
SENIOR FLEXONICS MAKE EXPANSION BELLOW
2025_PR_184183_1
PRMM248153
Single
Mechanical - All
30 days
PANIPAT REFINERY AND PETROCHEMICAL COMPLEX
2 documents required · 2 mandatory
Exempted
8 Apr 2026
12 Mar 2025
2 Apr 2025
12 Mar 2025
1 Apr 2025
12 Mar 2025
Amount
List of item(s) / work(s) as per tender documents
Expansion bellow 202-R-1,2,3,4 ; COLUMNS REACTORS & PRESSURE VESSELS EQUIPMENT : VESSEL TAG NUMBER : 202-R1/R2/R3/R4 SERVICE : REACTORS MAKE : M/S LARSEN & TOUBRO LIMITED ; EXP.BELLOW,2P-1314-119(J77990-1),PATHWAY ; <H>Ignore make in header text.</> (I)Scope of supply will include procurement of raw material, fabrication, inspection and testing, packing & forwarding and supply of expansion joint as per Drawing nos: J77990-1 Rev.03 and Sl. No.: J77990-1-1 THRU-1-4 . (II)Bellow should confirm to the latest edition of ASME B31.3 and EJMA. (III)Bellow should be of universal design as per latest edition of ASME B31.3 and EJMA. However said drawings may be considered as minimum basic requirements. (IV)Good quality packing shall be ensured to avoid any damage during transportation. (V)Expansion bellows are for reactors 202-R-01/02/03/04. 1 EA represents 1 bellow for each reactor.
Expert Supervision for installation of Item Sr. No. 10 ; ; ; Scope: 1.Per diem charges of 01 no. expert for 08 hours working on normal working days (from Monday to Saturday). 'EA' species 'MANDAY' 2. Boarding , lodging and ineternal transportaion shall be in scope of vendor.vendor to quote accordingly. 3. Submission of post installation report. Note : 1.,,This line item only pertains to supervision during installation of procured material at IOCL refinery site and accordingly engineering days shall be reckoned from the date of handover of equipment for supervision job . Payment shall be made as per daily log sheet signed by IOCL site engineer. 2.,,Completion period for Work Order shall be 2 years from CDD of respective material. In case IOCL is not able to handover the site within period of 2 years from Material CDD due to IOCL Site exigencies , then time extension shall be granted by IOCL to vendor and accordingly the vendor shall provide the supervision services for installation . 3.,,All expenses related to travel , lodgings , boarding & fooding shall be in scope of Vendor . 4.,,IFR suit is compulsory in IOCL battery limit . Job shall be executed as per prevailing safety guidelines at IOCL . EIC / IOCL site engineer decision shall be final in this regard.
METALLIC EXPANSION JOINT,EJSC ; EXPANSION JOINTS,METTALIC MATERIAL SPECIFICATION : SS 304 STANDARD SIZE OVERALL LENGTH mm mm ; METALLIC EXPANSION JOINT,EJSC ; (I)Scope of supply will include procurement of raw material, fabrication, testing and supplying of complete assembly of expansion jo int as per Drawing nos: B-02-G2398 Rev B Sheet 1 of 10 to Sheet 10 of 10 attached as Annexure-I. (II)Bellow should confirm to the latest edition of EJMA. (III)Bellow should be of universal design as per latest edition of EJMA. However said drawings may be considered as minimum basic requirements. (IV)Good quality packing shall be ensured to avoid any damage during transportation.
BELLOW,EXPANSION,EJ-1,REGENERATOR ; REGENERATOR CYLONE SEPERATOR TAG NUMBER: 08-RB-301 [F/ MATHURA] ; BELLOW,EXPANSION,EJ-1 ; (I)Scope of supply will include procurement of raw material, fabrication, testing and supplying of complete assembly of expansion jo int as per Drawing nos: B-01-G2398 Rev B Sheet 1 of 4 to Sheet 4 of 4. (II)Bellow should confirm to the latest edition of EJMA. (III)Bellow should be of universal design as per latest edition of EJMA. However said drawings may be considered as minimum basic requirements. (IV)Good quality packing shall be ensured to avoid any damage during transportation.
Expert Supervision for installation of Item Sr. No. 30 & 40 ; ; ; Scope: 1. Per diem charges of 01 no. expert for 08 hours working on normal working days (from Monday to Saturday). 'EA' species 'MANDAY' 2. Boarding , lodging and ineternal transportaion shall be in scope of vendor.vendor to quote accordingly. 3. Submission of post installation report. Note : 1.,,This line item only pertains to supervision during installation of procured material at IOCL refinery site and accordingly engineering days shall be reckoned from the date of handover of equipment for supervision job . Payment shall be made as per daily log sheet signed by IOCL site engineer. 2.,,Completion period for Work Order shall be 2 years from CDD of respective material. In case IOCL is not able to handover the site within period of 2 years from Material CDD due to IOCL Site exigencies , then time extension shall be granted by IOCL to vendor and accordingly the vendor shall provide the supervision services for installation . 3.,,All expenses related to travel , lodgings , boarding & fooding shall be in scope of Vendor . 4.,,IFR suit is compulsory in IOCL battery limit . Job shall be executed as per prevailing safety guidelines at IOCL . EIC / IOCL site engineer decision shall be final in this regard.
US Dollar
European Euro
British Pound
Japanese yen
Swiss Franc
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
Special_Instructions_to_the_Bidders_20250214_version_4.0.pdf
Additional Documents • 2.10 MB
BOQ_194442.xls
BOQ • 0.29 MB
Tender-Acceptance-Format.pdf
Additional Documents • 0.08 MB
FAQs-IOCL-Online-EMD.pdf
Additional Documents • 0.55 MB
PRMM248153.rar
Tender Documents • 3.96 MB
Download all tender documents and submit your bid