Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹11.2 L Reconstruction of collapsed boundary wall towards backside of sub-division 1 at Rajiv Gandhi Institute of Petroleum Technology, Jais Amethi. | Reconstruction of collapsed boundary wall towards backside of sub-division 1 at Rajiv Gandhi Institute of Petroleum Technology, Jais Amethi. | L1 | |
| 2 | L2₹11.6 L+₹44,274.96 (3.95%) Reconstruction of collapsed boundary wall towards backside of sub-division 1 at Rajiv Gandhi Institute of Petroleum Technology, Jais Amethi. | Reconstruction of collapsed boundary wall towards backside of sub-division 1 at Rajiv Gandhi Institute of Petroleum Technology, Jais Amethi. | L2 | |
| 3 | L3₹11.7 L+₹54,634.16 (4.88%) Reconstruction of collapsed boundary wall towards backside of sub-division 1 at Rajiv Gandhi Institute of Petroleum Technology, Jais Amethi. | Reconstruction of collapsed boundary wall towards backside of sub-division 1 at Rajiv Gandhi Institute of Petroleum Technology, Jais Amethi. | L3 | |
| 4 | L4₹11.9 L+₹73,933.50 (6.60%) Reconstruction of collapsed boundary wall towards backside of sub-division 1 at Rajiv Gandhi Institute of Petroleum Technology, Jais Amethi. | Reconstruction of collapsed boundary wall towards backside of sub-division 1 at Rajiv Gandhi Institute of Petroleum Technology, Jais Amethi. | L4 | |
| 5 | L5₹12.1 L+₹87,130.84 (7.78%) Reconstruction of collapsed boundary wall towards backside of sub-division 1 at Rajiv Gandhi Institute of Petroleum Technology, Jais Amethi. | Reconstruction of collapsed boundary wall towards backside of sub-division 1 at Rajiv Gandhi Institute of Petroleum Technology, Jais Amethi. | L5 |
| Sl No | Description | Qty | Unit | A G ENTERPRISES L4 | M/S MANJESH KUMAR L2 | DHARAMVIR MISHRA L3 | Deep Kumar L5 | Shree Sadguru Builder L1 | RAMA KANT YADAV L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Estimated Cost | - | - | -15.9 ₹11,93,437.03 | -17.99 ₹11,63,778.49 | -17.26 ₹11,74,137.69 | -14.97 ₹12,06,634.37 | -21.11 ₹11,19,503.53 Lowest | -11.97 ₹12,49,206.44 |
Tender Value
₹14.2 L
EMD Value
₹28,382
Closing Date
1 Sept 2026, 3:00 pmClosed
EE(C)(RAEBARELI)
AIIMS, Campus
Reconstruction of collapsed boundary wall towards backside of sub-division 1 at Rajiv Gandhi Institute of Petroleum Technology, Jais Amethi. Subwork/Packages: Main Work
167111
14/EE(Civil)/Raebareli/2026-27
OPEN
Civil Works - Buildings
NCB
45 days
Amethi, Uttar Pradesh
7 documents required · 7 mandatory
₹28,382
Not Applicable
1 Sept 2026
25 Aug 2026
1 Sept 2026
1 Sept 2026
29 Aug 2026
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Index14.pdf
document • 0.46 MB
NIT-14.pdf
document • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .