Registrar, SPPU
Registrar office, SPPU
Dismantling of existing flooring, brick work, removing brickbat coba etc,Providing Brick Masonry,Waterproofing work,Plastering workd,Flooring work,Painting work,Roofing and Ceiling work and Miscellaneous work.
2025_UOFP_1257305_1
C.A.No.2025-26/SPPU/ ESTATE/EE/ CIVIL/05
Open Tender
Civil Works
Percentage
270 days
campus of SPPU
i)Single Building Work/ Building Maintenance work costing not less than 21 lakhs ii)Avg. annual turnover not less than 83 lakhs for last three financial years in all classes of civil Engineering Work (i.e. 22-23, 23-24, 24-25)
8 documents required · 8 mandatory
₹3,000
₹83,000
27 Feb 2026
9 Dec 2025
17 Dec 2025
9 Dec 2025
16 Dec 2025
9 Dec 2025
9 Dec 2025 - 16 Dec 2025
Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc. Fifth Floor
Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete. Fifth Floor
Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. Fifth Floor
Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. i) Third Floor
ii) Fourth Floor
iii) Fifth Floor
Providing second class Burnt Brick masonry with conventional/ I.S. type bricks in cement mortar 1:6 in superstructure including striking joints, raking out joints, watering and scaffolding etc. Complete. Fifth Floor
Providing cement based water proofing treatment to terraces (Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M.1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer joints of brick bats with C.M.1:3 admixed with approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixed with approved water proofing compound. Marking finished surface with false squares of 300mm x 300 mm. making the junctions at the parapet rounded and tapered top for required height, with drip mould at the junction of plaster and parapet and curing and covering 10 years Guarantee against leakproofness on Court fee stamp paper of Rs. 500/- including ponding test etc. complete. Fifth Floor
Providing and laying Cast in situ/Ready Mix cement concrete M-20 of trap / granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete.(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade). Fifth Floor
Providing and laying Cast in situ/Ready Mix cement concrete in M-20 of trap/ granite/ quartzite/ gneiss metal for R.C.C.coping to plinth or parapet and sill of doors and windows moulded as per detailed drawings or chamfered as approved by the Engineer including steel centering, formwork, cover blocks, laying/pumping, compacting , curing , finishing and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade). Fifth Floor
Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. Fifth Floor
Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc. complete. i) Ground Floor
ii) First Floor
iii) Second Floor
iv) Third Floor
v) Fourth Floor
Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete. i) Ground Floor
ii) First Floor
iii) Second Floor
iv) Third Floor
v) Fourth Floor
Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. i) Third Floor
ii) Fourth Floor
iii) Fifth Floor
Providing and Fixing Mineral Fibre Acoustical Suspended Ceiling System with Dune (Bevelled Tegular) Edge Tiles of size 15mm Exposed Grid. The tiles should have Humidity Resistance (RH) of 99%,NRC 0.5, Light Reflectance 85%, Thermal Conductivity k = 0.052 - 0.057 w/m K, Colour White, Fire Performance UK Class 0 / Class 1 (BS 476 pt - 6 &7) in module size of 600 x 600 x 16mm , with Recycled content of 35 %. The tile shall be laid on precoated G.I.channel height 32 with 15 mm wide T - section flanges colour white having rotary stitching and XL2 CLIP on all T sections i.e. the Main Runner, 1200 mm and 600 mm Cross Tees with a web height of 32mm and a load carrying capacity of 7.57 Kilograms/M2 and pull out stength of minimum 100 Kilograms.. The T Sections have a Galvanizing of 90 grams per M2 and need to be installed with Suspension system. The Tile and Grid system used together should carry a 10 year warranty.approved as per GRIHA and BS 476 etc. complete. i) Third Floor
ii) Fourth Floor
Providing and fixing in position Gypsum board false ceiling with 12.5 mm thick Gypsum boards, screwed/fixed to the under structure of suspended G.I. Grid constructed and suspended from the main ceiling consisting of ceiling sections of size 25 x 50 mm maximum center to center distance of 600 milimetre perimeter channel and intermediate channels at maximum center to center distance 1200 milimetre galvanized grid should be fixed to reinforced cement concrete slab. The gypsum board should be fixed to galvanized iron grid with necessary screws. The boards should be taped and filled from underside to give smooth, seamless ceiling. The rate should include necessary additional ceiling sections and intermediate channels. Additional intermediate channels should be fixed to strap hangers for additional support to prevent strapping at every 1200 milimetre item to be completed in all respect including necessary sleeves for ducts finishing of joints cut outs, painting including labour, material, lifts etc. all complete. Third Floor
Fourth Floor
Mazdoor - Unskilled Heavy Male, Spec. No: - As directed by Engineer in charge
Providing Plumber with tools - Skilled ,Spec. No: - As directed by Engineer in charge
Disposal of excavated lead of 1.5 km including carting away upto dumping ground loading, unloading, spreading etc. complete. As directed by Engineer in charge
Providing and applying priming coat on concrete/ masonary/ Asbestos Cement plastered surfaces including scaffolding if necessary, preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter and sand papering as required etc. complete. i) Ground Floor
ii) First Floor
iii) Second Floor
iv) Third Floor
v) Fourth Floor
Providing and applying washable oil-bound distemper of approved colour and shade to old and new surfaces in two coats including scaffolding, preparing the surfaces. (excluding the primer coat.) etc. complete. i) Ground Floor
ii) First Floor
iii) Second Floor
iv) Third Floor
v) Fourth Floor
Providing and applying plastic emulsion paint of approved quality, colour and shade to new surface in three coats including scaffolding, preparing the surface. (excluding primer coat) etc. complete. i) Ground Floor
ii) First Floor
iii) Second Floor
iv) Third Floor
v) Fourth Floor
Providing and applying Royale Luxury Emulsion of approved make on internal wall surface as detailed below Scrapping for surface with emery paper and wipe clean for area. wall primer with brush by adding mineral turpentine oil by 8 to 10 % or water by 15 to 20% allowing to dry for 6 to 8 hoursAfter applying acrylic wall putty with appropriate prpportion of water of allow to dry for period of 4 to 6 hours of activity. Scrapping with emery paper and wipe clean Applying paints Royale Luxury emulsion 1st coat with brush water content water 40 to 45% or 65 to 70% by role Applying paints Royale luxury emulsion 2nd coat with brush with water content 40 to 45% or 65 to 70 % by roller. (With prior approval of S.E.). i) Ground Floor
ii) First Floor
iii) Second Floor
iv) Third Floor
v) Fourth Floor
Providing and applying two coats of exterior weather shield paint of approved manufacture and of approved colour to the plastered surfaces including cleaning ,preparing the plaster surface ,applying primer coat ,scaffolding if necessary, and watering the surface for two days etc complete. NOTE: For Item One Number 15 to 18 prior approval of Superintending Engineer will be necessary. i) Third Floor
ii) Fourth Floor
iii) Fifth Floor
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.
Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to10 mm thickness and confirming IS.15622-2006 (GroupBla)of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement morar including neat cement float,filling joints,curing and cleaning etc.complete. i) Ground Floor
ii) First Floor
iii) Second Floor
iv) Third Floor
v) Fourth Floor
Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to10 mm thickness and confirming IS.15622-2006 (GroupBla)of approved make, shade and pattern for dado and skirting in required position laid on a bed of 1:4 cement morar including neat cement float,filling joints,curing and cleaning etc.complete. i)Ground Floor
ii) First Floor
iii) Second Floor
iv) Third Floor
v) Fourth Floor
Providing and filling crack filling material to cosealed existing crack at any location by Dr. Fixit crack filler as per specification stipulated by manufactures & As directed by Engineer-in-charge etc.complete.(Need prior approval of Engineer incharge before execution of this item ) SP No. As directed by Engineer-in-charge
Providing and grouting the holes by Poly Ceramic Cementitious ie NicGrout G 06 +53 grade cement material of as per requirement to reduce the porosity of concrete /Masonry structure and to increase the strength of structure using grouting pipes, grouting m/c, mixer etc and all relevant safety with all leads and lifts, material, machinery, labour, etc. Complete as per specification and as directed by Engineer-in-Charge.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
Tender_C.pdf
Tender Documents • 2.33 MB
BOQ_2167199.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .