Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC | ₹15.0 L | L1 | Accepted-AOC AGG WITH L1 |
| 2 | L2₹15.7 LRejected-AOC DHEERAHEDI POST BHOPA DISTRICT MUZAFFARNAGAR | BHOPA | MUZAFFARNAGAR | UTTAR PRADESH | ₹15.7 L | L2 | Rejected-AOC AGG WITH L1 |
| 3 | L3₹15.7 LRejected-AOC BAROJ ROAD SHAKTI NAGAR COLONY DISTRICT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | ₹15.7 L | L3 | Rejected-AOC AGG WITH L1 |
| 4 | L4₹15.7 LRejected-AOC GRAM SAIDPUR KHURD TIKOLI DISTRICT BAGHPAT UTTAR PRADESH PIN CODE 250001 | BAGHPAT | BAGHPAT | UTTAR PRADESH | 250001 | ₹15.7 L | L4 | Rejected-AOC AGG WITH L1 |
| Sl No | Description | Qty | Unit | M/S SUDHIR KUMAR CONTRACTOR L4 | VIKUL KUMAR L2 | MANOJ CHAUDHARY L3 | bhadana contractor L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismentling of B/W work & stacking of material within 60 mtrs including T & P, labour etc. complete | 16 | Cum | 518 ₹8,288 | 518 ₹8,288 | 520 ₹8,320 | 518 ₹8,288 |
| 2.00 | Dismentling of R.B./R.C.C. work & stacking of material within 60 mtrs including T & P, labour etc. complete | 7 | Cum | 633 ₹4,431 | 633 ₹4,431 | 633 ₹4,431 | 633 ₹4,431 |
| 3.00 | Laying dismentaled material in U/S and D/S of V.R.B. in bed of Dy. per cum. | 19.38 | cum | 132 ₹2,558.16 | 100 ₹1,938 | 120 ₹2,325.60 | 132 ₹2,558.16 |
| 4.00 | Earth work in excavation of foundation including all lead, lift and manual compaction. | 250.46 | Cum | 100 ₹25,046 | 100 ₹25,046 | 110 ₹27,550.60 | 90 ₹22,541.40 |
| 5.00 | P.C.C. 1:3:6 (M10) in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 8.89 | Cum | 5,024.31 ₹44,666.12 | 5,166 ₹45,925.74 | 5,166.15 ₹45,927.07 | 5,024 ₹44,663.36 |
| 6.00 | Centering and shuttering for R.C.C. work including placing in position. | 220 | Sqm | 840 ₹1.8 L | 840 ₹1.8 L | 840.15 ₹1.8 L | 840 ₹1.8 L |
| 7.00 | Supply/Fixing Reinforcement for R.C.C. including bending, binding, cutting and placing in position of reinforcement Sted. SAIL, TATA and Tehri TMT including cost of bindng wire with cost of material including T&P, labour, etc. as per directed by Engineer in charge. | 7.5 | M.T | 72,467 ₹5.4 L | 72,300 ₹5.4 L | 72,300 ₹5.4 L | 72,000 ₹5.4 L |
| 8.00 | Providing and laying RCC 1:1.5:3 with crushed stone ballast and coarse sand with cost of material including T&P, labour etc. as per directed by Engineer in charge. | 97.3 | Cum | 6,887 ₹6.7 L | 6,800 ₹6.6 L | 6,800.1 ₹6.6 L | 6,450 ₹6.3 L |
| 9.00 | C.C. 1:2:4 (M15) in wearing coat and bed flooring with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 1.97 | Cum | 6,057 ₹11,932.29 | 6,400 ₹12,608 | 6,500 ₹12,805 | 6,057 ₹11,932.29 |
| 10.00 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. | 15.98 | Sqm | 177.15 ₹2,830.86 | 177 ₹2,828.46 | 180 ₹2,876.40 | 177 ₹2,828.46 |
Tender Value
₹15.8 L
EMD Value
₹1.6 L
Closing Date
19 Nov 2025, 11:00 amClosed
EE MDGC MUZAFFARNAGAR
EE MDGC MUZAFFARNAGAR
Rajwaha Bhaisani Ke Km 9.500 par isth chatigrasth pul ke punhanirman ka karya
2025_UPIDC_1085718_22
TN-06/EE/2025-26
Open Tender
Civil Works
30 days
as per tender notice
as per tender notice
3 documents required · 3 mandatory
₹854
₹1.6 L
20 Jan 2026
14 Nov 2025
19 Nov 2025
14 Nov 2025
19 Nov 2025
14 Nov 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.79 MB
Tendernotice_2.pdf
PDF • 2.03 MB
BOQ_2002524.xls
BOQ • 0.26 MB
t-6nit.pdf
Tender Documents • 0.58 MB
Download all tender documents and submit your bid