Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 LAccepted-AOC 142 HAHIHARPUR KENSHILI USTHI SOUTH 24 PARGANAS WEST BENGAL 743375 | 24 PARAGANAS SOUTH | WEST BENGAL | 743375 | ₹3.0 L | 1 | Accepted-AOC L1 |
| 2 | 2₹3.0 L+₹3,016.35 (1.02%)Rejected-Finance 418 KALITALA PARK KOLKATA KOLKATA KOLKATA 700070 | 24 PARAGANAS SOUTH | WEST BENGAL | 700070 | ₹3.0 L+₹3,016.35 (1.02%) | 2 | Rejected-Finance L2 |
| 3 | 3₹3.0 L+₹5,973.56 (2.02%)Rejected-Finance 121004 | ₹3.0 L+₹5,973.56 (2.02%) | 3 | Rejected-Finance L3 |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
24 Jan 2026, 2:00 pmClosed
EE WS BPS
KALIGHAT BOOSTER PUMPING STATION S.P.MUKHERJEE ROAD KOLKATA-700026
RESTORATION OF DAMAGED BASE FRAME ALONG WITH GLAND PACKING ASSEMBLY AND MAKING PROPER ALIGNMENT OF HT PUMP-MOTOR UNIT NO.1 TO 4 WITH ALLIED RELATED WORKS AT SIRITY BPS
2026_KMC_985800_1
KMC/WS/SBPS/2025-26/11
Open Tender
MECHANICAL
Percentage
20 days
SIRITY BOOSTER PUMPING STATION
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
17 Jun 2026
14 Jan 2026
27 Jan 2026
14 Jan 2026
24 Jan 2026
14 Jan 2026
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. III) For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m
BUILDING WORKS ( C ) Brickworks,Concrete Works etc 8?...Controlled Cement concrete grade mix with well graded stone chips (20 mmnominal size) including adequate plasticiser & excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge.Consumption of cement will not be less than 340 Kg of OPC [43/53 grade ] cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation. [using concrete mixture] With Pakur Variety M 35 Grade of Concrete
CHECKING AND ALINGMENT OF THE MOTOR WITH RESPECT TO PUMP DONE COMPLETE IN ALL RESPECT ACCORDING OF EIC USING PRECISION DIAL GAUGE ETC AND AFTER THAT THE FOUNDATION BOLTS FIXED PROPERLY AND COMPLETE IN ALL RESPECT ACCORDING TO THE DIRECTION OF EIC. FAIR RATE APPROVED BY DG(WS) ON DATED 07/01/2019.
CHAPTER - VII MISCELLANEOUS ITEMS Sealing of uneven gap in PSC Socket/spigot joint by insertion of 19 mm thick asbestos graphite packing (AMP-32) including supplying. fitting and fixing all complete.
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 6. Holding down bolt with nut including 100 x 100 x 6 mm plate washer at bottom fitted complete and packing the hole with cement concrete or cement grout as directed. (iv) 32 mm dia: (a) 450 mm long
CHAPTER - VII MISCELLANEOUS ITEMS Coating of 'Food Gr. Epoxy' Resin of thickness not less than 240 micron with a low-viscosity, crystallization-resistant food grade epoxy resin base with a reactive diluents combined with high build epoxy amine adducts as per BS 5493 standard and a polyamide or amido polyamine or any other suitable hardener. It shall react with epoxy resin at normal ambient temperature, suitable for solvent-free coatings as per recommended proportion for use on metal, concrete and wood surface to protect from corrosion, give anti-fungal properties ,as per guide line of FDA and USDA as well as damage from chemical reaction after making the surface free from dust, oil and moisture etc. all complete as per instruction and to the satisfaction of ElC. [ This item will be operated on prior permission from the concerned SE/Dy Chief Engineer]
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.3.4Field welding of machined ends of pieces of M.S pipes and specials forlaying the same inside trench/over ground by means of electric arc welding as per relevant ISspecification using standard electrodes including edgepreparation and charges of deployment of electric generator set with fuel, lubricant, and all other tools and plants all complete as per specification and direction of Engineer-in-Charge. [ Engineer-in-Charge shall approve the electrodes for arc welding before use ]Throat thickness in mm 10mm
MATERIALS AND LABOUR ETC.(C)-(II) COST OF MATERIALS 1.Supply of G. I. pipes of TATA make including necessary sockets (b) 20 mm dia. (i) Light quality
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 17)Fitter Mechanic. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 18)Fitter Mechanic (Helper). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
Sub Total
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_2406167.xls
BOQ • 0.26 MB
techbid.pdf
Tender Documents • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .