Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.9 LAccepted-Finance 111 MINI SHOPPING COMPLEX NEAR HOTEL ASIA NEHRU MARKET JAMMU JAMMU KASHMIR 180004 | JAMMU | JAMMU AND KASHMIR | 180004 | 1 | Accepted-Finance Found Eligible | |
| 2 | 2₹1.9 L+₹250 (0.13%)Accepted-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | 2 | Accepted-Finance Found Eligible | |
| 3 | 3₹2.4 L+₹45,250 (23.2%)Accepted-Finance 235 YARD 6 NARWAL JAMMU JAMMU KASHMIR 180001 | JAMMU | JAMMU AND KASHMIR | 180001 | 3 | Accepted-Finance Found Eligible |
| Sl No | Description | Qty | Unit | Vaibhav Engineers and Technocrates L3 | Shivam enterprises L2 | AADISHWAR ELECTRICAL AND MECHANICAL WORKS L1 |
|---|---|---|---|---|---|---|
| 1.00 | 1. Repairs to 250 KVA voltage stabilizer at LIS Aryanpura. The job involves disconnecting of the Voltage stabilizer from the main power supply (Incoming and Outgoing cables). Loading the voltage stabilizer in the vehicle by using crane and suitable tools and tackle and shifting the voltage stabilizer to workshop. Opening and removing of the panel, loosening /dismantling of the top cover, nut and bolts. Lifting of inside transformer assembly with the chain pulley block for extraction of the complete unit. Dismantling/Extraction of the coils. Thereafter dismantling of the core assembly and extraction of the all burnt copper wire with the help of manual labour and suitable tools/tackles. Rewinding of copper wire of the superior quality and then complete insulating and varnishing of coils. Assembling of the coils to make it a complete unit. Replacement of the rotor switch (2 nos.) by way of p/f of new components, replacing all the damaged /burnt components. Filling of 180 litre T.oil in stabilizer after heating of the T.oil. Reinstallation of the stabilizer frame with transformer assembly. Lowering of complete unit in tank after p/f of shock proof gasket and body with nuts/bolts. Shifting the voltage stabilizer to LIS and unloading of the voltage stabilizer at site by using crane Connecting power cables by p/f of new thimbles of the requisite capacity and testing on load. Complete job includes the cost of material, labour charges, transportation charges, hiring charges of tools/tackles required at site. 01 No. Complete Job.
2 Repair to 100 HP 3 phase induction motor of pumping unit no.01 installed at LIS Aryanpura. The job involves disconnecting the electrical connections from the main supply and disassembling the motor by unfastening the foundation nuts and bolts and decoupling from the pump. Shifting of the motor to workshop by mechanical transport. Then complete dismantling of the motor involves extraction of rotor from stator followed by cleaning of stator and rotor using compressed air, organic solvent, CCL4 etc. to remove the dust particles /silt etc. Extraction of burnt winding from the stator, cleaning of stator with petrol. P/F of new winding wire of suitable gauge & size in the stator, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process. Assembling of the motor. Shifting the motor back to LIS. Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump, testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles, transportation charges.
01 No. Complete Job | 1 | Job | 4,800 ₹2,35,200 | 3,900 ₹1,91,100 | 3,895 ₹1,90,855 Lowest |
Tender Value
₹2.4 L
EMD Value
₹4,876
Closing Date
4 Dec 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of Executive Engineer MID Akhnoor/Nowshera
Repair to 250 KVA Voltage stabilizer and 100 HP 3 phase induction motor of unit no.01 at LIS Aryanpura.
2025_IFC_296611_1
MID/AN/75
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
10 days
Aryanpura
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
₹4,876
Yes
Office of Executive Engineer MID Akhnoor/Nowshera
8 Dec 2025
27 Nov 2025
5 Dec 2025
27 Nov 2025
4 Dec 2025
29 Nov 2025
28 Nov 2025
1. Repairs to 250 KVA voltage stabilizer at LIS Aryanpura. The job involves disconnecting of the Voltage stabilizer from the main power supply (Incoming and Outgoing cables). Loading the voltage stabilizer in the vehicle by using crane and suitable tools and tackle and shifting the voltage stabilizer to workshop. Opening and removing of the panel, loosening /dismantling of the top cover, nut and bolts. Lifting of inside transformer assembly with the chain pulley block for extraction of the complete unit. Dismantling/Extraction of the coils. Thereafter dismantling of the core assembly and extraction of the all burnt copper wire with the help of manual labour and suitable tools/tackles. Rewinding of copper wire of the superior quality and then complete insulating and varnishing of coils. Assembling of the coils to make it a complete unit. Replacement of the rotor switch (2 nos.) by way of p/f of new components, replacing all the damaged /burnt components. Filling of 180 litre T.oil in stabilizer after heating of the T.oil. Reinstallation of the stabilizer frame with transformer assembly. Lowering of complete unit in tank after p/f of shock proof gasket and body with nuts/bolts. Shifting the voltage stabilizer to LIS and unloading of the voltage stabilizer at site by using crane Connecting power cables by p/f of new thimbles of the requisite capacity and testing on load. Complete job includes the cost of material, labour charges, transportation charges, hiring charges of tools/tackles required at site. 01 No. Complete Job. 2 Repair to 100 HP 3 phase induction motor of pumping unit no.01 installed at LIS Aryanpura. The job involves disconnecting the electrical connections from the main supply and disassembling the motor by unfastening the foundation nuts and bolts and decoupling from the pump. Shifting of the motor to workshop by mechanical transport. Then complete dismantling of the motor involves extraction of rotor from stator followed by cleaning of stator and rotor using compressed air, organic solvent, CCL4 etc. to remove the dust particles /silt etc. Extraction of burnt winding from the stator, cleaning of stator with petrol. P/F of new winding wire of suitable gauge & size in the stator, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process. Assembling of the motor. Shifting the motor back to LIS. Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump, testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles, transportation charges. 01 No. Complete Job
Shivam enterprises (BID ID -2659500)
Vaibhav Engineers and Technocrates (BID ID -2657871)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_961081.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .