Tender Value
₹3.1 Cr
EMD Value
₹6.2 L
Closing Date
17 Jun 2026, 2:00 pm
General Manager, UPPCL, Zone-6 Noida
K-2, Sector-116, Noida Gautambudha Nagar
Construction work of 06 Nos. Type-III Residences at District Jail Ghaziabad in District Ghaziabad
2026_UPPRC_1157186_1
30/PCL/GM/Zone-6/Noida/2026-27 Dt. 03.06.2024
Open Tender
Civil Works
365 days
District Jail Ghaziabad in District Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹6.2 L
4 Jun 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. DSR-2.8.1 | - | CUM | 194.19 | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in- charge. All kinds of soil | - | CUM | 132.42 | - |
| 3 | In all kind of soil upto 1.5m to 3.0m. depth | 1 | CUM | 227.02 | ₹226.79 |
| 4 | Filling carted earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5m. DSR 2.25a | 1 | CUM | 522.6 | ₹522.08 |
| 5 | Supplying and filling in plinth with sand under floor, including watering,ramming,consolidating and dressing complete. | 1 | CUM | 1,584.39 | ₹1,582.81 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 4.1.8 | 0.4 | CUM | 5,081.99 | ₹2,032.8 |
| 7 | Construction of granular sub-base by providing close graded Materia conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 (dsr-16.78.2) | - | CUM | 2,182.04 | - |
| 8 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 80 mm thick C.C. paver block of M-35 grade with approved colour design and pattern. (DSR-16.91.2) | - | SQM | 814.29 | - |
| 9 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313(PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1)Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4) Treatment of soil along external perimeter of building 5 liters/sqm. (5) Treatment of soil under apron along external perimter 5 liters/sqm. PWD CH 8 8.01 | 1 | SQM | 231.31 | ₹231.08 |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.R.C.C. work in Plinth beams | - | CUM | 7,090.87 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
Tender30.pdf
Tender Documents • 3.32 MB
DWG30.pdf
Additional Documents • 9.68 MB
BOQ_2168352.xls
BOQ • 0.63 MB
Download all tender documents and submit your bid