Loading…
Loading…
Tender Value
₹39.4 L
EMD Value
₹79,000
Closing Date
11 Apr 2026, 3:00 pmClosed
RAKESH KUMAR
EO
SHEKHOPURSARAI
RAKESH KUMAR
EO
CONSTRUCTION OF PCC ROAD FROM MIYAN BIGHA SAMPARK PATH TO DHARMENDRA SINGH DALAN (BAGICHA) IN NAGAR PANCHAYAT SHEKHOPUR SARAI. (GROUP- 12)
128325
NIT 10/2025 - 26/ GR- 12
Open Tender
CIVIL
Samastipur
• REGISTRATION
• PAN CARD
• GST
• ANY OTHER DOCUMENTS AS PER NIT
CIVIL
PERCENTAGE
L1
1
8 documents required · 8 mandatory
₹5,000
Processing Fee: 590
₹79,000
OFFICE AT NAGAR PANCHAYAT SHEIKHOPURSARAI
29 Mar 2026
29 Mar 2026
16 Apr 2026
30 Mar 2026
11 Apr 2026
30 Mar 2026
1 Apr 2026
NAME OF WORK : BOQ FOR CONSTRUCTION OF PCC ROAD FROM MIYAN BIGHA SAMPARK PATH TO DHARMENDRA SINGH DALAN (BAGICHA) IN NAGAR PANCHAYAT SHEKHOPUR SARAI.
SL Nos ITEM QTY. UNIT RATE AMOUNT
1 Excavating, supplying and filling of local earth (including royalty but excluding cairriage cost) by mechanical transport upto a lead of 3km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. If local earth is available at more than 3 km lead the actual lead must be approved by compitent authority. cairraiage of material will be paid seperately and calculated after deducting initial lead. 548.89 M3 411.70 225,978.00
2 Supplying and stacking at site 53mm to 22.4mm size stone aggregate 252.45 M3 883.70 223,090.00
3 Supplying and stacking at site Moorum. 252.45 M3 431.20 108,856.00
4 Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density . 252.45 M3 487.00 122,943.00
5 Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level.1:1.5:3(1 Cement :1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) 311.10 M3 5418.60 1,685,726.00
6 Centring and shuttering including strutting,propping etc. and removal or form work for Foundations,footings, bases Columns 170.00 M2 211.10 35,887.00
7 CARRIAGE OF MATERIAL:-
8 DIFFRENCE COST OF MATERIAL:-
9 Providing and fixing of information board 1.00 Each 3200.00 3,200.00
Total Amount (Including 12% GST) :- 3,702,246.00
Providing amount for rate escalation in gst (12 to 18%).multiplying factor 0.05357 Total Rs : - 198,329.00
Total Amount (Including 18% GST) : - 3,900,575.00
SIAGNIORANGE FEE Rs : - 34,512.00
SIAGNIORANGE FEE
SL No MATERIAL QTY UNIT RATE AMOUNT
2 53MM to 22.4MM SIZE STONE AGGRIGATE 252.45 M3 57.01 14,392.00
TOTAL SIAGNIORANGE FEE Rs : - 34,512.00
NAME OF WORK : BOQ FOR CONSTRUCTION OF PCC ROAD FROM MIYAN BIGHA SAMPARK PATH TO DHARMENDRA SINGH DALAN (BAGICHA) IN NAGAR PANCHAYAT SHEKHOPUR SARAI.
SL Nos ITEM QTY. UNIT RATE AMOUNT
1 Excavating, supplying and filling of local earth (including royalty but excluding cairriage cost) by mechanical transport upto a lead of 3km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. If local earth is available at more than 3 km lead the actual lead must be approved by compitent authority. cairraiage of material will be paid seperately and calculated after deducting initial lead. 548.89 M3 411.70 225,978.00
2 Supplying and stacking at site 53mm to 22.4mm size stone aggregate 252.45 M3 883.70 223,090.00
3 Supplying and stacking at site Moorum. 252.45 M3 431.20 108,856.00
4 Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density . 252.45 M3 487.00 122,943.00
5 Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level.1:1.5:3(1 Cement :1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) 311.10 M3 5418.60 1,685,726.00
6 Centring and shuttering including strutting,propping etc. and removal or form work for Foundations,footings, bases Columns 170.00 M2 211.10 35,887.00
7 CARRIAGE OF MATERIAL:-
8 DIFFRENCE COST OF MATERIAL:-
9 Providing and fixing of information board 1.00 Each 3200.00 3,200.00
Total Amount (Including 12% GST) :- 3,702,246.00
Providing amount for rate escalation in gst (12 to 18%).multiplying factor 0.05357 Total Rs : - 198,329.00
Total Amount (Including 18% GST) : - 3,900,575.00
SIAGNIORANGE FEE Rs : - 34,512.00
SIAGNIORANGE FEE
SL No MATERIAL QTY UNIT RATE AMOUNT
2 53MM to 22.4MM SIZE STONE AGGRIGATE 252.45 M3 57.01 14,392.00
TOTAL SIAGNIORANGE FEE Rs : - 34,512.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 10 2025 26 Shekhopur.pdf
NIT • 4.76 MB
Corrigendum.pdf
NIT • 0.41 MB
NIT 10 2025 26 Shekhopur.pdf
NIT • 4.76 MB
Corrigendum.pdf
NIT • 0.41 MB
PARER CUTTING DAINIK BHASKER.jpg
NIT • 6.42 MB
GR 12.xlsx
NIT • 0.01 MB
GR 12.xlsx
NIT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .