| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 LAccepted-Finance | ₹22.9 L | L1 | Accepted-Finance Being lowest |
| 2 | L2₹26.8 L+₹3.9 L (17.1%)Rejected-Finance | ₹26.8 L+₹3.9 L (17.1%) | L2 | Rejected-Finance Being not lowest |
| 3 | L3₹27.5 L+₹4.6 L (20.1%)Rejected-Finance B 134 GANESH MURTHI NAGAR PART III COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | ₹27.5 L+₹4.6 L (20.1%) | L3 | Rejected-Finance Being not lowest |
| 4 | L4₹29.3 L+₹6.3 L (27.7%)Rejected-Finance | ₹29.3 L+₹6.3 L (27.7%) | L4 | Rejected-Finance Being not lowest |
| 5 | L5₹30.0 L+₹7.0 L (30.7%)Rejected-Finance A 14 USHA SADAN NEAR POST OFFICE COLABA MUMBAI 05 | MUMBAI | MUMBAI | MAHARASHTRA | 400005 | ₹30.0 L+₹7.0 L (30.7%) | L5 | Rejected-Finance Being not lowest |
| Sl No | Description | Qty | Unit | SHRI SAI ENTERPRISES L3 | saisiddhi construction L4 | SHREE SHIV SHANKER ENTERPRISE L1 | S S ENTERPRISES L5 | vikas construction & co L2 | GANGAJAL L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Material & Labour for attending complaints for cleaning of all blockages of nahni trap/floor trap, bottle traps, gully traps, P or S traps of WCs, 100mm / 75 mm CI pipes and stacks up to Ist manhole, CI/SGSW pipes between gully trap and first manhole, CI Tee/door bends, sewage lines of any dia and depth including opening of cover slabs and and recovering after completion, by passing/rodding ropes, knots, bamboo/ wire/ kandi, rotary cleaning rods or with mechanical process, and removal of sludge/ mud/dry silt etc. in foul position to outside defence land etc between two manholes to maintain internal sewage system on all working days from 0900 Hrs to 1700 Hrs in the area II of AGE B/R Central with manual / pressure cleaning pumps & flexible roads and other necessary equipments, complete all as specified and directed. | 1,500 | Each Job | 100 ₹1,50,000 | 110 ₹1,65,000 | 200 ₹3,00,000 | 250 ₹3,75,000 | 99 ₹1,48,500 | 77 ₹1,15,500 Lowest |
| 2.00 | Material & Labour for attending complaints for cleaning of all blockages of nahni trap/floor trap, bottle traps, gully traps, P or S traps of WCs,100mm / 75 mm CI pipes and stacks up to Ist manhole, CI/SGSW pipes between gully trap and first manhole, CI Tee/door bends, sewage lines of any dia and depth including opening of cover slabs and and recovering after completion, by passing/rodding ropes, knots, bamboo/ wire/ kandi, rotary cleaning rods or with mechanical process, and removal of sludge/ mud/dry silt etc. in foul position to outside defence land etc between two manholes to maintain internal sewage system from 0900 Hrs to 1700 Hrs in the area II of AGE B/R Central with manual/ pressure cleaning pumps & flexible roads and other necessary equipments but on emergency basis on Sunday/ closed holiday/Gazetted holidays on call of Engr-in-charge/JE, complete all as specified and directed. | 280 | Each Job | 100 ₹28,000 Lowest | 110 ₹30,800 | 200 ₹56,000 | 250 ₹70,000 | 109 ₹30,520 | 125 ₹35,000 |
| 3.00 | M&L for cleaning of drains/culverts including removing & re-covering of RCC/CI/Steel covers by completely removing silt, soil, mud sludge, vegetation growth etc. and removing the same to out side MoD land all as directed by Engr-in-Charge for any width of drains and depth of drains n.exc 0.45m, complete all as specified and directed. | 550 | RM | 40 ₹22,000 | 35 ₹19,250 | 15 ₹8,250 Lowest | 20 ₹11,000 | 18 ₹9,900 | 148 ₹81,400 |
| 4.00 | Cleaning of drains/culverts including removing & re-covering of RCC/CI/Steel covers and completely removing silt, soil, mud sludge, vegetation growth etc. and removing the same to out side MoD land all as directed by Engr-in-Charge for any width of drains and depth exc 45 cm but n.exc 90 cm, complete all as specified and directed. | 450 | RM | 40 ₹18,000 | 25 ₹11,250 | 15 ₹6,750 Lowest | 20 ₹9,000 | 27 ₹12,150 | 178 ₹80,100 |
| 5.00 | Demolition brickwork or stone/boulder masonry, build incement mortar including all quions, arches, pillars etc, but excluding ashlar facings, dressed stonework and precast concrete articles, complete all as specified and directed. | 30 | Cum | 200 ₹6,000 | 150 ₹4,500 | 150 ₹4,500 | 200 ₹6,000 | 149 ₹4,470 Lowest | 225 ₹6,750 |
| 6.00 | Material and labour for brick work with sub class 'B' brick straight curved on plan exceeding 6 metre mean radius with old size bricks built in CM 1:6 of manholes,septic tank, soak pits etc, complete all as specified and directed. | 30 | Cum | 5,000 ₹1,50,000 | 5,000 ₹1,50,000 | 3,000 ₹90,000 Lowest | 5,500 ₹1,65,000 | 4,580 ₹1,37,400 | 5,700 ₹1,71,000 |
| 7.00 | Taking down cement plaster from inside/outside of existing septic tank/manhole/walls etc including racking out joints, hacking for key scrubbing down with water and removal of rubbish off the premises, complete all as specified and directed. | 500 | Sqm | 15 ₹7,500 | 15 ₹7,500 | 2 ₹1,000 Lowest | 20 ₹10,000 | 10 ₹5,000 | 37 ₹18,500 |
| 8.00 | Material & Labour for 15 mm thick rendering in cement mortar 1:4 mixed with liquid waterproofing admixture as per manufactures instructions inside and outside wall of manhole of brick work/ concrete surface and finishing fair and even inside and even and smooth inside without using extra cement mortar as per manufactures instructions, complete all as specified and directed.
Note: (i) WPC shall be measured and paid for separately as 'Supply only'.
(ii) WPC to be mixed @200ml per 50 Kg bag of cement all as manufacturers instruction. | 700 | Sqm | 200 ₹1,40,000 | 200 ₹1,40,000 | 150 ₹1,05,000 | 200 ₹1,40,000 | 119 ₹83,300 Lowest | 225 ₹1,57,500 |
| 9.00 | Supply only integral water proofing, complete all as specified and directed. | 18.4 | Ltr | 150 ₹2,760 | 100 ₹1,840 | 100 ₹1,840 | 20 ₹368 Lowest | 29 ₹533.6 | 325 ₹5,980 |
| 10.00 | Firstly old loose spelled concrete should be chiseled from roof ceiling with the help of scrapers chisel & hammer after that cleaning of rust from mild steel rod and applying cement spry 3.00 Kg per sqm by paint brush over cleaned surfaces and Material and Labour for 12-15 mm thick ready mix plaster in Multi layer for ceiling on fair faces of brick wall or concrete surfaces, finished even and fair Including three coat white wash, complete all as specified and directed by Engr-in-charge. | 110 | Sqm | 300 ₹33,000 | 220 ₹24,200 | 200 ₹22,000 | 200 ₹22,000 | 99 ₹10,890 Lowest | 115 ₹12,650 |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
1 Aug 2026, 6:00 pmClosed
Kameshwar Prasad, IDSE, EE
GE (West), Colaba, Mumbai - 400 005
REPAIR/REPLACEMENT /CLEANING OF SEWAGE LINE, MANHOLES, WC PAN, GULLY TRAPS AND PIPES IN SEWAGE DUCTS ETC IN AREA-II OF AGE (B/R) CENTRAL UNDER GE (WEST) COLABA, MUMBAI
2026_MES_776503_1
8279/E8
Open Tender
Civil Works
Item Rate
330 days
GE (West), Colaba
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (W) Colaba, Mumbai
₹1 L
Yes
11 Aug 2026
4 Jul 2026
3 Aug 2026
4 Jul 2026
1 Aug 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material & Labour for attending complaints for cleaning of all blockages of nahni trap/floor trap, bottle traps, gully traps, P or S traps of WCs, 100mm / 75 mm CI pipes and stacks up to Ist manhole, CI/SGSW pipes between gully trap and first manhole, CI Tee/door bends, sewage lines of any dia and depth including opening of cover slabs and and recovering after completion, by passing/rodding ropes, knots, bamboo/ wire/ kandi, rotary cleaning rods or with mechanical process, and removal of sludge/ mud/dry silt etc. in foul position to outside defence land etc between two manholes to maintain internal sewage system on all working days from 0900 Hrs to 1700 Hrs in the area II of AGE B/R Central with manual / pressure cleaning pumps & flexible roads and other necessary equipments, complete all as specified and directed. | 1,500 | Each Job | - | - |
| 2 | Material & Labour for attending complaints for cleaning of all blockages of nahni trap/floor trap, bottle traps, gully traps, P or S traps of WCs,100mm / 75 mm CI pipes and stacks up to Ist manhole, CI/SGSW pipes between gully trap and first manhole, CI Tee/door bends, sewage lines of any dia and depth including opening of cover slabs and and recovering after completion, by passing/rodding ropes, knots, bamboo/ wire/ kandi, rotary cleaning rods or with mechanical process, and removal of sludge/ mud/dry silt etc. in foul position to outside defence land etc between two manholes to maintain internal sewage system from 0900 Hrs to 1700 Hrs in the area II of AGE B/R Central with manual/ pressure cleaning pumps & flexible roads and other necessary equipments but on emergency basis on Sunday/ closed holiday/Gazetted holidays on call of Engr-in-charge/JE, complete all as specified and directed. | 280 | Each Job | 1 | ₹280 |
| 3 | M&L for cleaning of drains/culverts including removing & re-covering of RCC/CI/Steel covers by completely removing silt, soil, mud sludge, vegetation growth etc. and removing the same to out side MoD land all as directed by Engr-in-Charge for any width of drains and depth of drains n.exc 0.45m, complete all as specified and directed. | 550 | RM | 2 | ₹1,100 |
| 4 | Cleaning of drains/culverts including removing & re-covering of RCC/CI/Steel covers and completely removing silt, soil, mud sludge, vegetation growth etc. and removing the same to out side MoD land all as directed by Engr-in-Charge for any width of drains and depth exc 45 cm but n.exc 90 cm, complete all as specified and directed. | 450 | RM | 3 | ₹1,350 |
| 5 | Demolition brickwork or stone/boulder masonry, build incement mortar including all quions, arches, pillars etc, but excluding ashlar facings, dressed stonework and precast concrete articles, complete all as specified and directed. | 30 | Cum | 4 | ₹120 |
| 6 | Material and labour for brick work with sub class 'B' brick straight curved on plan exceeding 6 metre mean radius with old size bricks built in CM 1:6 of manholes,septic tank, soak pits etc, complete all as specified and directed. | 30 | Cum | 5 | ₹150 |
| 7 | Taking down cement plaster from inside/outside of existing septic tank/manhole/walls etc including racking out joints, hacking for key scrubbing down with water and removal of rubbish off the premises, complete all as specified and directed. | 500 | Sqm | 6 | ₹3,000 |
| 8 | Material & Labour for 15 mm thick rendering in cement mortar 1:4 mixed with liquid waterproofing admixture as per manufactures instructions inside and outside wall of manhole of brick work/ concrete surface and finishing fair and even inside and even and smooth inside without using extra cement mortar as per manufactures instructions, complete all as specified and directed.
Note: (i) WPC shall be measured and paid for separately as 'Supply only'.
(ii) WPC to be mixed @200ml per 50 Kg bag of cement all as manufacturers instruction. | 700 | Sqm | 7 | ₹4,900 |
| 9 | Supply only integral water proofing, complete all as specified and directed. | 18.4 | Ltr | 8 | ₹147.2 |
| 10 | Firstly old loose spelled concrete should be chiseled from roof ceiling with the help of scrapers chisel & hammer after that cleaning of rust from mild steel rod and applying cement spry 3.00 Kg per sqm by paint brush over cleaned surfaces and Material and Labour for 12-15 mm thick ready mix plaster in Multi layer for ceiling on fair faces of brick wall or concrete surfaces, finished even and fair Including three coat white wash, complete all as specified and directed by Engr-in-charge. | 110 | Sqm | 9 | ₹990 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_869543.xls
BOQ • 0.33 MB
8279TenderPages.pdf
Tender Documents • 1.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .