Tender Value
₹12.3 L
EMD Value
₹24,674
Closing Date
30 Dec 2022, 6:00 pmClosed
DFO REASI
DFO REASI HQ REASI
Erection of 235 No.of demarcation Boundary Pillars as per approved design at different locations as per tashree burjiat (description of boundary pillar) and as per latitude and longitude found out by GPS in Bhutan Forest of Katra Range of Reasi Fores
2022_FD_198258_9
e-NIT No. 18 of 2022-23 dated 30-11-2022
Open Tender
Civil Works
Item Rate
45 days
KATRA
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
DFO REASI
₹24,674
11 Jan 2023
23 Dec 2022
31 Dec 2022
23 Dec 2022
30 Dec 2022
23 Dec 2022
23 Dec 2022 - 28 Dec 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal sizeIncl. all carriages lifts complete job.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m Incl. all carriages lifts complete job.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size.Incl. all carriages lifts complete job.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars
Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and the front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014( Nerolac) Exterior Emulsion paint is recommended.
Centering and shuttering including strutting propping etc and removal of form work for columns, piers, abutments, pillars, posts and struts
TAJA BEGUM
MOHINDER LAL GANGAL
BASHIR AHMED
udhay partap singh
ASHWANI KUMAR
Mohd Iqbal
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .