| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | -1.37% | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 CrAdmitted-Finance | -0.80% | ₹1.8 Cr | L2 | Admitted-Finance |
Tender Value
₹1.8 Cr
EMD Value
₹11.0 L
Closing Date
20 May 2026, 1:30 pmClosed
Dy Director (Const) RKUMP Kanpur
Dy Director (Const) RKUMP Kanpur
Construction of 10 no. C category shops , construction/repair of internal road, internal deep drain, construction of road crossing in internal roads, work of raising the boundary wall on the front side at NMY Kamalganj
2026_RKUMP_1135753_2
01/2026-27
Open Tender
Civil Works
365 days
Kamalganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹29,500
Dy Director (Const) RKUMP Kanpur
₹11.0 L
Yes
26 May 2026
6 May 2026
20 May 2026
6 May 2026
20 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil including lift up to 1.5 meter lead up to 30 meter including watering and ramming of excavated earth into plinth and removal and disposal in surplus earth as directed by the E/I. up to a distance of 30M from the foundation trenches.(S.I.251) | 464.46 | CUM | 135 | ₹62,702.1 | BI01010001010000000000000515BI0100001113 |
| 2 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. The earth in form of cutting to be used as spoil banks within 50m distance as directed by the Engineer-in- Charge.+5.km.SI No. 253+253E | 1,490.42 | CUM | 235 | ₹3,50,248.7 | - |
| 3 | Sand filling in plinth including supply of necessary quantity of sand from ganga River including watering dressing etc. Labour and T & P etc. Required for proper completion of work.S.I.255 | 35.92 | CUM | 1,360 | ₹48,851.2 | - |
| 4 | P/L of cement concerete 1:4:8 with cement F. Sand & stone aggregate 40mm size curing complete I/C supply of all materials labour & T&P etc. required for proper completion of work ( S.I.273) | 163.4 | CUM | 5,600 | ₹9,15,040 | - |
| 5 | M-150 brick work in 1:6 with one cement and six coarse sand of 2.25 F.M mortar in foundation and plinth including supply of all materials labour T & P etc. Required for proper completion of the work as per( S.I.303)+ corse sand difrence. | 143.3 | CUM | 4,830 | ₹6,92,139 | - |
| 6 | Brick work in 1:6 super structure above plinth level upto floor two level (upto two storeys) including necessary cutting and moulding of brick work as required and also including honey combed brick in thickness of wall more than 12 cms.SI No. 309 | 110.84 | CUM | 5,130 | ₹5,68,609.2 | - |
| 7 | Brick work in 1:4 cement & c/sand mortar in S.S half brick thick wall .SI No.310A | 7.56 | Cum | 5,510 | ₹41,655.6 | - |
| 8 | R.C.C. Work in 1:1.5:3 in Raft foundation…Complete.Ch-05 S.I.21 | 65.48 | CUM | 8,000 | ₹5,23,840 | - |
| 9 | R.C.C. Work in 1:1.5:3 in Columns …Complete.S.I.289 | 18.56 | CUM | 8,800 | ₹1,63,328 | - |
| 10 | R.C.C. Work in 1:1.5:3 in slab…Complete.Ch-05 S.I.22 | 41.08 | CUM | 8,500 | ₹3,49,180 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
BOQ_2142242.xls
BOQ • 0.26 MB
001.pdf
Tender Documents • 1.68 MB
Download all tender documents and submit your bid