| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | ₹7.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.5 LRejected-Finance | ₹7.5 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | AYYAKANNU PANDIYAN L2 | P. MALAISAMY L1 |
|---|---|---|---|---|---|
| 1.00Name of work : Construction of Kalaiyarangam at Pudupatti Sarvachithi Vinayagar koil in Kathalur panchayat | |||||
| 2.00 | Earth work excavation in all classess soil with initinal lead and lift as per SS 20Betc complete. | 16.31 | Cum | 265 ₹4,322.15 | 263 ₹4,289.53 |
| 3.00 | Sand filling with good niver sand including cost and conveyance of sand and all labour charges etc.complete. | 5.54 | Cum | 2,020 ₹11,190.80 | 2,019 ₹11,185.26 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all labour charges etc.complete., | 5.54 | Cum | 5,730 ₹31,744.20 | 5,727 ₹31,727.58 |
| 5.00 | Brick work with Cement mortar 1: 5 mix using country Bricks including all labour charges etc.complete., | 15.53 | Cum | 6,200 ₹96,286 | 6,194 ₹96,192.82 |
| 6.00 | Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete | 107.82 | Sqm | 1,100 ₹1.2 L | 1,096 ₹1.2 L |
| 7.00 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including all labour charges etc.complete., | 13.92 | Sqm | 9,520 ₹1.3 L | 9,514 ₹1.3 L |
| 8.00 | Supplying fabricating and placing in position mild steel or ribbed for steel and all roinforced cement concrete works as per the design given including cost of steel and binding wire in all foors etc., complete complying with standard specification. | 1,000 | no | 95 ₹95,000 | 91 ₹91,000 |
| 9.00 | Plastering in Cm 1:5 mix using 12 mm Thick including cost and converyance of all materials to side and labour Charges etc. | 129 | Sqm | 290 ₹37,410 | 288 ₹37,152 |
| 10.00 | WHEATHERING COURSE CONCRETE TO 80 MM THICKNESS (AVERAGE) using 20mm size brick jelly slacked lime in the proportion 32:12:50 (no sand to be used) including cost and conveyance costof al materials to work site and labour charges and finishing with one layer | 33.6 | m | 1,610 ₹54,096 | 1,603 ₹53,860.80 |
Tender Value
₹7.5 L
EMD Value
₹7,500
Closing Date
13 Mar 2026, 11:55 amClosed
BLOCK DEVELOPMENT OFFICER(B.Pt)
PANCHYAT UNION VIRALIMALAI
Construction of Kalaiyarangam at Pudupatti Sarvachithi Vinayagar koil in Kathalur panchayat
2026_RDTN_673695_3
VMLI_mla_mar_3
Open Tender
Civil Works
180 days
VIRALIMALAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,500
13 Mar 2026
13 Mar 2026
13 Mar 2026
13 Mar 2026
13 Mar 2026
13 Mar 2026
Earth work excavation in all classess soil with initinal lead and lift as per SS 20Betc complete.
Sand filling with good niver sand including cost and conveyance of sand and all labour charges etc.complete.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all labour charges etc.complete.,
Brick work with Cement mortar 1: 5 mix using country Bricks including all labour charges etc.complete.,
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
RCC 1:1.5:3 mix using 20mm ISS HBG metal including all labour charges etc.complete.,
Supplying fabricating and placing in position mild steel or ribbed for steel and all roinforced cement concrete works as per the design given including cost of steel and binding wire in all foors etc., complete complying with standard specification.
Plastering in Cm 1:5 mix using 12 mm Thick including cost and converyance of all materials to side and labour Charges etc.
WHEATHERING COURSE CONCRETE TO 80 MM THICKNESS (AVERAGE) using 20mm size brick jelly slacked lime in the proportion 32:12:50 (no sand to be used) including cost and conveyance costof al materials to work site and labour charges and finishing with one layer
Granolithic flooring in cc 1:2:4 including all labour charges etc.complete.,
Distempering two coats with Oil Bound Distemper two coats with one Coat of Primary Coat including cost and conveyance of all materials to site and all labour charges etc., complete.
Painting two coats with Exterior Emulsion including cost and conveyance of all materials to site and all labour charges etc., complete.
Painting TWO coats of new iron works including all labour charges etc.complete.,
Supplying and fixing of steel door of size 0.9 x 2.10 m including cost and conveyance of all materials and all labour charges etc., complete.
Supplying and fixing of steel Window of size 0.9 x 1.20 m including cost and conveyance of all materials and all labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 35 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
KATHALOOR.pdf
Tender Documents • 0.09 MB
BOQ_810431.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid