Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.4 L+₹977.91 (0.40%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹2.4 L
EMD Value
₹7,332
Closing Date
6 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O DRAIN FROM MASJID SHAREEF PARREYPORA TO MARTAND CANAL ALONG WITH BOUNDARY WALL NHO IRSHAD PARRAY BLOCK K.PORA
2026_RDPR_313998_31
ENIT37of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹7,332
8 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
6 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearance by the way of engagement of labors including surface excavation and removal of shrubs hurbs etc. | - | lab | - | - |
| 0.0 | E/w in excavation in foundation trenches by manual means dispoal lead upto 25 mts and lift 1.5 mts in all kinds of soil | 20.83 | Cum | - | - |
| 0.0 | P/L of stone Soling tightly handpacked and tamped manually incl carriage I/C plum in c/c | - | Cum | - | - |
| 0.0 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) and by using 20 mm down aggregates | 1 | Cum | - | - |
| 0.0 | 12 MM PLASTER IN 1:6 CEMENT SAND | 1 | Sqm | 1 | ₹1 |
| 0.0 | P/F of shuttering using ordinary timber planks of wood including its removal. | 1 | Sqm | - | - |
| 0.0 | Carriage of materials by mechanical transport
Sand & Bajri at an average lead of 25 kms & H/L of 50 Mtr | - | Cum | 1 | - |
| 0.0 | Provision for sign board and photographs & Carriage of cement | - | LS | - | - |
| 0.0 | PROVISION FOR RCC SPUN PIPE | - | LS | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_1016793.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .