Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.2 LAccepted-AOC | ₹24.2 L | L1 | Accepted-AOC Due to quoted Lowest Rate |
| 2 | L2₹24.9 LRejected-Finance | ₹24.9 L | L2 | Rejected-Finance Due to quoted Highest Rate |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualify |
Tender Value
₹25.0 L
EMD Value
₹59,000
Closing Date
15 Jun 2026, 12:00 pmClosed
Project Manager
UPPCL Unit-26, Saharanpur
CONSTRUCTION WORK OF ADDITIONAL DORMITORY HALL BUILDING FOR KASTURBA GANDHI BALIKA VIDYALAYA AT BUDHANA IN DISTRICT MUZAFFARNAGAR UP
2026_UPPRC_1157240_1
05/PCL/PM-26/SRE/2026-27
Open Tender
Civil Works
Percentage
90 days
Saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹59,000
Yes
9 Jul 2026
5 Jun 2026
15 Jun 2026
5 Jun 2026
15 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 mabove ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 550 | sqm | 12.17 | ₹6,693.5 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. | 52.96 | CUM | 122.78 | ₹6,502.43 |
| 1.03 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 16.74 | CUM | 484.55 | ₹8,111.37 |
| 1.04 | Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. | 13.05 | CUM | 1,469.05 | ₹19,171.1 |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 14.48 | CUM | 4,712.03 | ₹68,230.19 |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (M-20)Upto plinth level(i) R.C.C. work in Footing | - | CUM | 6,257.17 | - |
| 1.07 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (M-20)Upto plinth level(iii) R.C.C. work in Columns | - | CUM | 6,257.17 | - |
| 1.08 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (M-20)Upto plinth level(ii) R.C.C. work in Beam | - | CUM | 6,257.17 | - |
| 1.09 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (M-20) GF&FF(iii) R.C.C. work in Columns | - | CUM | 7,507.25 | - |
| 1.1 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (M-20) GF&FF(i) R.C.C. work in Lintel | - | CUM | 7,958.63 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.26 MB
BOQ_2168472.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].