Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | L1 | Accepted-AOC AS PER SILLOD | |
| 2 | L2₹8.3 L+₹74,404.85 (9.79%)Rejected-Finance | L2 | Rejected-Finance HIGH RATE | |
| 3 | L3₹8.4 L+₹84,286.09 (11.1%)Rejected-Finance PLOT NO 35 GUT NO 170 MOHINI RAIPURAM NAGAR BHAGATSING NAGAR AREA AURANGABAD | AURANGABAD | AURANGABAD | MAHARASHTRA | L3 | Rejected-Finance HIGH RATE | |
| 4 | Rejected-Technical | - | Rejected-Technical Due to TEch.Disqualified | |
| 5 | Rejected-Technical | - | Rejected-Technical Due to TEch.DIS Qualified |
Tender Value
₹8.4 L
EMD Value
₹10,000
Closing Date
2 Jan 2020, 2:00 pmClosed
Addl. C.E.O.
Zilla Parishad Aurangabad
Shifting of 11kv line, LT line and DTC for new Building construction of Khultabad Panchayat Samiti Under 1.3 percent DDF Scheme at Tq. Khultabad Dist. Aurangabad.
2019_AURAN_518918_1
ZPA/Works/PSK/MSEDCL/2019
Open Tender
Electrical Works
Percentage
45 days
Tq. Khultabad Dist. Aurangabad.
ZP Reg. in Class C and Above with MSEDCL Vendor Code registered contractors.
2 documents required · 2 mandatory
₹1,000
Online Payment
₹10,000
21 Jul 2020
9 Dec 2019
3 Jan 2020
9 Dec 2019
2 Jan 2020
9 Dec 2019
eProcurement System Government of Maharashtra Created By: Shrikant Mangulkar Created Date/Time: 27-Jan-2020 12:52 PM Tender Title: Shifting of 11kv line, LT line and DTC for new Building construction of Khultabad Panchayat Samiti Dist. Aurangabad Tender ID: 2019_AURAN_518918_1
Tender Inviting Authority: Addl.CEO ZP Aurangabad
Name of Work: Shifting of 11kv line, LT line & DTC for new Building construction of Khultabad Panchayat Samiti Under 1.3% DDF Scheme at Tq. Khultabad Dist. Aurangabad.
Contract No: ZPA/Works/Elect/2019
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Pooja Electrical Works 844550.00 -1.18 834584.31 Eight Lakh Thirty Four Thousand Five Hundred and Eighty Four
2.00 A G Electricals Works 844550.00 -.01 844465.55 Eight Lakh Fourty Four Thousand Four Hundred and Sixty Five
3.00 Aradhya Electricals 844550.00 -9.99 760179.46 Seven Lakh Sixty Thousand One Hundred and Seventy Nine
Lowest Amount Quoted BY: Aradhya Electricals(760179.46)
BOQ Summary Details Tender Title: Shifting of 11kv line, LT line and DTC for new Building construction of Khultabad Panchayat Samiti Dist. Aurangabad Tender ID: 2019_AURAN_518918_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Aradhya Electricals 760179.46 L1
2 Pooja Electrical Works 834584.31 L2
3 A G Electricals Works 844465.55 L3
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .