Tender Value
₹6.0 L
EMD Value
₹12,100
Closing Date
31 Aug 2021, 3:00 pmClosed
Chief Engineer
Chennai port trust, Chennai-1
Tender for renovation of two wheeler parking shed at administrative office campus in EE(C)CDII division
2021_ChPT_642910_1
T/WMA3/25/2021/E
Open Tender
Civil Works
Works
90 days
Chennai port trust
Civil works
7 documents required · 7 mandatory
₹0
₹12,100
Yes
12 Jan 2022
11 Aug 2021
1 Sept 2021
11 Aug 2021
31 Aug 2021
25 Aug 2021
1. Dismantling the existing damaged PVC roof sheets from the Two wheeler Parking shed, DG Shed and wherever required carefully without disturbing the existing vertical supports and adjoining structures near by all as per drawings, relevant specifications including hand over all serviceable materials to department stores available at inside Port premises, including providing barricading, cutting, handling, stacking within a lead of 50m for disposal and the unserviceable materials hand over to RSD within a lead of 2 kms all as directed at site of work including all labour, equipment, tools, tackles, scaffolding, transport, safety ladders / belts, fuel, etc., complete
2. Dismantling the existing damaged roof trusses, purlins, sag rods from the Two wheeler Parking shed , DG Shed and wherever required up to the Vertical supports carefully without disturbing the existing vertical supports and adjoining structures near by all as per drawings, relevant specifications including hand over all serviceable materials to the department stores available at inside Port premises, including providing barricading, cutting, handling, stacking within a lead of 50 m for disposal and hand over all the unserviceable materials to the RSD within a lead of 2 kms all as directed at site of work including all labour, equipment, tools, tackles, scaffolding, transport, safety ladders / safety belts, fuel, etc., complete.
3. Supplying, fabrication and erection of new Structural steel members for Roof Trusses consists of 50 mm dia MS pipe medium (B Class) alround, 25 mm dia MS pipe medium (B-Class) as bracing & 50 mm dia MS pipe medium (B Class) as sag rods etc. for roofing system and fixing of roof trusses in proper position in the existing vertical supports with necessary MS Gusset Plates of size 250X250X10mm, bolts & nuts including providing MS hollow rectangular section of size 60X40X3.20mm as purlin / wall cladding or nearest available higher size over the roof trusses for fixing of Galvalume colour coated sheet (0.47 mm thick) including all acesseries / consumables for proper completion of the work, all as per drawings, relevant specifications and as directed at site of work including scaffolding, safety helmets / belts, all eqiupments such as welding plants with all accessories etc., materials, labour, tools, transport, fuel, etc., complete.
4. Providing and fixing Galvanised Powder coated Colour corrugated roofing Sheet of 0.47mm thickness for roofing system / wall cladding to the required size and fixing in proper position including all accessories / consumables for proper completion of the work, all as per drawings, relevant specifications and as directed at site of work including scaffolding, all materials, labour, tools, equipments, transport , fuel, safety helmets / belts, etc., complete.
5. Providing and fixing Galvanised Powder coated Colour corrugated roofing Sheet of 0.47mm thickness for roofing system / wall cladding to the required size and fixing in proper position including all accessories / consumables for proper completion of the work, all as per drawings, relevant specifications and as directed at site of work including scaffolding, all materials, labour, tools, equipments, transport , fuel, safety helmets / belts, etc., complete.
6 Preparing the existing brick wall surfaces and providing plastering in cement mortar 1:5 (1 cement: 5 fine river sand) 12 mm thick to the required finish, curing etc., all as per relevant specification and as directed at site of work including providing scaffolding, all materials, labour, tools, equipments, etc.,complete.
7 Preparing the old ceiling surfaces and applying two coats of white wash using lovelycem of approved make, colour to give an even shade, all as directed at site of work including providing scaffolding, all materials, labour, tools, equipments, brushes, etc. complete. Note: Painting co-efficient over the measured quantity shall be allowed as stipulated in the manual.
8 Preparing the newly plastered wall surfaces and applying two coats of colour wash over one coat of primer using Plastic emulsion paint of approved make, colour to give an even shade all as directed at site of work including providing scaffolding, all materials, labour, tools, equipments, brushes, etc. complete. Note: Painting co-efficient over the measured quantity shall be allowed as stipulated in the manual.
9 Preparing the existing wall surfaces and applying two coats of colour wash using Plastic emulsion paint of approved make, colour to give an even shade all as directed including providing scaffolding, all materials, labour, tools, equipments,brushes,etc.,complete. Note: Painting co-efficient over the measured quantity shall be allowed as stipulated in the manual.
10 Preparing the new steel members and applying two coats of synthetic enamel paint over a coat of red oxide primer of approved quality, colour to give an even shade all as directed at site of work including providing scaffolding, all materials, labour, brushes, tools, equipments, transport, fuel etc.,complete. Note: Painting co-efficient over the measured quantity shall be allowed as stipulated in the manual.
11 Preparing the existing steel members and applying two coats of synthetic enamel paint of approved quality, colour to give an even shade all as directed at site of work including providing scaffolding, all materials, labour, brushes, tools,equipments,transport,fueletc., complete. Note: Painting co-efficient over the measured quantity shall be allowed as stipulated in the manual.
A.K.CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .