| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 CrAccepted-AOC R O PARAYPORA THEYAN KALAROOCH KUPWARA | KUPWARA | JAMMU AND KASHMIR | 193221 | ₹7.9 Cr Quoted ₹6.7 Cr | L1 | Accepted-AOC NTP issued |
| 2 | L2₹6.8 Cr+₹15.5 L (2.33%)Rejected-Finance | ₹6.8 Cr+₹15.5 L (2.33%) | L2 | Rejected-Finance L2 |
| 3 | L3₹7.0 Cr+₹33.9 L (5.09%)Rejected-Finance | ₹7.0 Cr+₹33.9 L (5.09%) | L3 | Rejected-Finance L3 |
Tender Value
₹7.9 Cr
EMD Value
₹15.8 L
Closing Date
12 Jun 2026, 4:30 pmClosed
Chief Engineer PMGSY Kashmir
Engineering Complex Bund Road near Govt. Silk factory Showroom Rajbagh Srinagar-190008
Construction and Maintenance of Road from L021- Dudi Chuntwari Km 6 RD 100 to Chuntwari Bala, Sanctioned L-4.500 km, Carriageway Width 3.75mtr PMGSY-IV (Batch-I, 2026-27) (Waste Plastic Technology), Package No. JK08-4012, PMGSY Div Kupwara.
2026_KSRRD_147812_1
JK084012
Open Tender
CIVIL
Percentage
548 days
Kupwara
Please refer Tender documents.
21 documents required · 21 mandatory
₹10,000
₹15.8 L
Office of Chief Engineer PMGSY Kashmir
10 Jul 2026
21 May 2026
13 Jun 2026
22 May 2026
12 Jun 2026
29 May 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork | - | - | - | - |
| 2 | Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 (Finished work to be measured) | 7,947 | Cum | 165.81 | ₹13,17,692.07 |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Finished work to be measured) | 5,562.9 | Cum | 1 | ₹5,562.34 |
| 4 | Pavement | - | - | - | - |
| 5 | Loosening, Levelling and Compacting original ground supporting SUBBASE to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for SUBGRADE construction as per Technical Specification Clause 301.4.1 (Finished work to be measured) | 3,493.13 | Cum | 1 | ₹3,492.78 |
| 6 | GSB: Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. Using naturally occuring gravel. including loading, unloading, cost of carriage, octri, royalti, complete job (Finished Job to be measured). | 1,642.1 | Cum | 1 | ₹1,641.94 |
| 7 | WBM GRADE 2: Providing, laying, spreading and compacting stone aggregates of specificsizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.including loading, unloading, cost of carriage, octri, royalti, complete job (Finished Job to be measured). | 0.4 | Cum | 1 | ₹0.4 |
| 8 | Prime Coat: Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of Granular base including cleaning of road surface and sproaying primer at the rate of 0.70-1.0 Kgs/Sqm using mehanical means as per TS clause 502 (low porosity) including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octori (finished work to be measured) complete job including loading, unloading, cost of carriage, octri, royalti, complete job (Finished Job to be measured). | 17,473.65 | SQM | - | - |
| 9 | Bituminous macadam P/L Waste Plastic bituminous Mac.50mm thick, with Hot mix plant using crushed aggregate of grading as per Table 500.4 premixed with bituminous binder(3.04%), and waste plastic (0.26%) as per clause 5.1 of table 3 of SP-98 transported to site of workupto required lead 1, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the designed compaction as per technical specification clause 504 including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading unloading and octori. (Finished work to be measured, complete.) | 873.68 | CUM | 1 | ₹873.59 |
| 10 | Tack Coat: Providng and applying tack coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 Kg/ per sqm on the prepared bituminious surface cleaned with hydraulic broom as per technical specification clause 503 including loading, unloading, cost of carriage, octri, royalti, complete job (Finished Job to be measured). | 17,473.65 | SQM | 0.2 | ₹3,492.98 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_230701.xls
BOQ • 0.34 MB
SBD_JK084012.pdf
Tender Documents • 1.97 MB
Biddatesheet.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .