| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹31.8 LAdmitted-Finance | -36.36% | ₹31.8 L | L1 | Admitted-Finance |
| 2 | L2₹44.3 L+₹12.5 L (39.3%)Admitted-Finance | -11.34% | ₹44.3 L+₹12.5 L (39.3%) | L2 | Admitted-Finance |
| 3 | L3₹49.9 L+₹18.1 L (56.9%)Admitted-Finance | -0.13% | ₹49.9 L+₹18.1 L (56.9%) | L3 | Admitted-Finance |
| 4 | L4₹51.0 L+₹19.2 L (60.3%)Admitted-Finance | +2.00% | ₹51.0 L+₹19.2 L (60.3%) | L4 | Admitted-Finance |
| 5 | L5₹52.5 L+₹20.7 L (65.0%)Admitted-Finance | +5.00% | ₹52.5 L+₹20.7 L (65.0%) | L5 | Admitted-Finance |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
24 Apr 2026, 4:00 pmClosed
Executive Engineer PWD(RandB) Division Satwari
Office of the Executive Engineer PWD(RandB) Division Satwari
Macadamization of road from 4th Bridge Upto Yatri Niwas Bhagwati Nagar Jammu 2026
2026_PWDJK_307893_1
Short e-NIT No. 03 of 2026-27 Dated 15-04-2026
Open Tender
Civil Works
Percentage
30 days
Satwari
As per eNIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD(RandB) Division Satwari
₹1 L
Satwari
25 May 2026
15 Apr 2026
25 Apr 2026
15 Apr 2026
24 Apr 2026
15 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and Laying of River Bed Material of maximum size 75mm including Levelling, dressing, watering and consolidation in layer 20cm in depth each layer consolidation with power road roller of manimum 8 ton capacity complete job. Including carriage | - | Cum | - | - |
| 2 | Providing laying, spreading and compacting graded stone aggregate (Size range from 53mm to 0.075mm) to wet mix macdam specification including premixing the materialwith water at OMC in mechanical mixing plant, carriage of mixed material by tipper to site, for all leads and lifts, laying in uniform layer with mechanical paver finisher in sub base/base course on perpared surface and compacting with vibrtatory roller of 8-10 tones capacity toachive the desired density,complete asper the specifications. | - | Cum | 1,885.95 | - |
| 3 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously repared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity | - | Cum | - | - |
| 4 | Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification,
complete and as per directions of Engineer-in-Charge. 25 mm compacted thickness with bitumen of grade VG- 30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity | - | Sqm | - | - |
| 5 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On W.B.M. @ 0.75 Kg/sqm. | - | Sqm | 75.75 | - |
| 6 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On bitumen surface @ 0.50 Kg/sqm.. | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.30 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_998429.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .