Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.5 LAdmitted-Finance | ₹49.5 L | L1 | Admitted-Finance |
| 2 | L2₹51.1 L+₹1.7 L (3.34%)Admitted-Finance | ₹51.1 L+₹1.7 L (3.34%) | L2 | Admitted-Finance |
| 3 | L3₹55.3 L+₹5.9 L (11.9%)Admitted-Finance | ₹55.3 L+₹5.9 L (11.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Hanuman Construction Co., L1 | Rameshwar Prasad Beniwal L3 | Pradeep Constructions L2 |
|---|---|---|---|---|---|---|
| 1.001. The rates for the Elect. Items are based on Specfiactions . 2. In case of any typographical error, the relevant code for specification & BSR for rates shall be final. 3. The contents of RPWA 100 shall form the essential & integral part of this G-Schedule. | ||||||
| 1.01 | LVkbZyk / Dhamans ?kkl ds cht dh vkiwfrZ ¼cktkj nj½ 1 fdyks@लेंन प्रति 100 eh- ¼ 1 लेंन में ½ | 57.27 | kg | 400 ₹22,908 Lowest | 498.53 ₹28,550.81 | 400 ₹22,908 Lowest |
| 1.02 | Up rooting of vetiver/ moonja clumps from natural source | 4.65 | Lacs | 2,200 ₹10,230 | 2,497 ₹11,611.05 | 1,500 ₹6,975 Lowest |
| 1.03 | Prunning & seprating of slips moonja | 9.33 | Km | 700 ₹6,531 | 798.23 ₹7,447.49 | 500 ₹4,665 Lowest |
| 1.04 | Planting & dressing | 9.33 | Km | 1,900 ₹17,727 | 2,498.52 ₹23,311.19 | 1,500 ₹13,995 Lowest |
Tender Value
₹65.0 L
EMD Value
₹1.3 L
Closing Date
17 Aug 2026, 6:00 pmClosed
Executive Engineer
wdsc tonk
NIT 28 2026-27 Block Piplu MJSA 2.3 Construction of PT, MPT, Field Outlet Waste Weir, Sunken Pond 36 Nos., G.P. Loharwara, Sandera, Banwara
2026_WDSC_584298_3
NIT 26-28 2026-27 Div Tonk
Open Tender
Civil Works
Percentage
120 days
tonk
refer bid
2 documents required · 2 mandatory
₹1,000
refer bids
₹1.3 L
Yes
21 Aug 2026
8 Aug 2026
18 Aug 2026
8 Aug 2026
17 Aug 2026
8 Aug 2026
8 Aug 2026 - 17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 11. The rates for the Elect. Items are based on Specfiactions . 2. In case of any typographical error, the relevant code for specification & BSR for rates shall be final. 3. The contents of RPWA 100 shall form the essential & integral part of this G-Schedule. | |||||
| 1.01 | LVkbZyk / Dhamans ?kkl ds cht dh vkiwfrZ ¼cktkj nj½ 1 fdyks@लेंन प्रति 100 eh- ¼ 1 लेंन में ½ | 57.27 | kg | 500 | ₹28,635 |
| 1.02 | Up rooting of vetiver/ moonja clumps from natural source | 4.65 | Lacs | 2,500 | ₹11,625 |
| 1.03 | Prunning & seprating of slips moonja | 9.33 | Km | 800 | ₹7,464 |
| 1.04 | Planting & dressing | 9.33 | Km | 2,500 | ₹23,325 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BID.pdf
Tender Documents • 3.51 MB
BOQ_1038260.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .