Tender Value
Refer Docs
EMD Value
₹20.4 L
Closing Date
11 Aug 2026, 3:00 pm
DDC mandi parishad Lucknow
3rd floor kisan mandi bhawan gomti nagar Lucknow
Construction of A- Type shops 10Nos,B-Type shops 06 Nos,C-Type shops 10 Nos,Canteen,Const.of Boundary infront of Office near A-Type Shops,Const. of RCC Drain and Repair of water supply line,Supply and Fixing of 2 HP Submersible Pump at N.M.Y. UNNAO.
2026_RKUMP_1170373_1
N.K.Lko/E-Tender/2026-1156 Dated 17.07.2026
Open Tender
Civil Works
Percentage
540 days
unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹29,500
DDC mandi parishad Lucknow
₹20.4 L
21 Jul 2026
21 Jul 2026
11 Aug 2026
21 Jul 2026
11 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. (2.1.1) | 765.87 | CUM | 135 | ₹1,03,392.45 |
| 2 | Concrete with 4 cm. stone ballast fine sand nd cement in proportion of 12:6:1 in foundation and under floor and including supply of II material labour and T&P etc required for proper completion of the work. (S.I No. 273) | 264.06 | CUM | 3,210 | ₹8,47,632.6 |
| 3 | Class-150 brick work in 1:6 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.(6.1.2) | 726.37 | CUM | 4,765 | ₹34,61,153.05 |
| 4 | Class-150 brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.(6.1.2) | 135.12 | CUM | 5,240 | ₹7,08,028.8 |
| 5 | R.C.C. work with cement, approved coarse sand and 2cm (3/4") gauge approved stone grit in the proportion of 1:2:4 in beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. . (SI NO 285) | 129.35 | cum | 9,350 | ₹12,09,422.5 |
| 6 | Filling of carted earth in trenches, plinth and sides of foundation etc. in lavers not exceeding 20cm. in depth consolidating each deposited layer by ramming & watering and dressing and including cartage of earth upto 5.00km and all taxes required for proper completion of the work. . (AOR) | 6,011.78 | CUM | 206.8 | ₹12,43,236.1 |
| 7 | R.C.C. work with cement, approved coarse sand and 2cm (3/4") gauge approved stone grit in the proportion of 1:1.5:3 in Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. . (SI NO 289) | 142.52 | cum | 9,450 | ₹13,46,814 |
| 8 | Sand filling in plinth including supply of necessary quantity of local sand from a distance not exceeding 8 Kms from the site of work and including watering dressing etc. required for proper completion of work (S. I. No.255 a) | 416.84 | CUM | 690 | ₹2,87,619.6 |
| 9 | M-150 Brick work in 1:4 Cement Coarse sand mortar in supper structure in one brick thick wall including supply jof all material labour and T&P etc. required for proper completion of thework (S.I. No. 305a + 309+310) | 69.12 | Cum | 5,550 | ₹3,83,616 |
| 10 | P/L of Plain cement concrete with cement, approved coarse sand and 2cm (3/4") gauge approved stone grit in the proportion of 1:2:4 including necessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. . (SI NO 279 .b) | 75.66 | cum | 7,185 | ₹5,43,617.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
Tendernotice_2.pdf
PDF • 1.69 MB
BOQ_2198748.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].