| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | ₹4.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.2 L+₹8,244.94 (1.99%)Rejected-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | ₹4.2 L+₹8,244.94 (1.99%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M RAMARAJ L2 | C BALASUBRAMANIAN L1 |
|---|---|---|---|---|---|
| 1.00 | Desilting the existing drain etc complete as per direction of departmental officers. | 6 | M3 | 120 ₹720 | 113 ₹678 Lowest |
| 2.00 | Dismantling the existing damaged Reinforced Cement Concerete slab etc., complete direction of departmental officers. | 6 | M3 | 4,400 ₹26,400 | 4,308 ₹25,848 Lowest |
| 3.00 | Dismantling the existing damaged Cement Concerete wall etc., complete direction of departmental officers. | 13 | M3 | 500 ₹6,500 | 486 ₹6,318 Lowest |
| 4.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 42.99 | M3 | 215 ₹9,243.92 | 203 ₹8,727.98 Lowest |
| 5.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 11 | M3 | 5,338 ₹58,718 Lowest | 5,338 ₹58,718 Lowest |
| 6.00Centering with steel centering for revertment, drain and culvert upto 1.20m depth etc., complete | |||||
| 6.01 | i.Drain sides | 227 | M2 | 300 ₹68,100 | 281 ₹63,787 Lowest |
| 6.02 | ii.Slab bottom | 6 | M2 | 1,269 ₹7,615.27 Lowest | 1,269 ₹7,615.27 Lowest |
| 7.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate) using 20mm gauge hard broken granite stone jelly for All CC items of work xcluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 30.99 | M3 | 6,037 ₹1,87,116.81 Lowest | 6,037 ₹1,87,116.81 Lowest |
| 8.00 | Plastering with cement mortar 1:5(one cement and five sand) 12mm thick in all floors complying with standard specifications. | 44 | M2 | 350 ₹15,400 | 290 ₹12,760 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
9 Jan 2025, 3:00 pmClosed
Assistant Commisssioner,West Zone
West Zone, Coimbatore Corporation
Reconstruction of storm water drain at Ajjanoor north street north side in ward no 39 of west zone.
2024_MAWS_515431_20
E6/WESTZONE/2024
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation
As per the tender document attached
4 documents required · 4 mandatory
₹0
₹5,000
16 May 2026
2 Jan 2025
9 Jan 2025
2 Jan 2025
9 Jan 2025
2 Jan 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.02 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
SWD.pdf
Tender Documents • 0.70 MB
BOQ_613504.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .