Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹20.2 L+₹25,000 (1.25%)Admitted-Finance 94 5TH FLOOR TOWER D SPENGLE HEIGHTS DHAKOLI KC ZIRAKPUR TEH DERABASSI SAS NAGAR MOHALI PB | S A S NAGAR | PUNJAB | 140103 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N.N.CONSTRUCTION L1 | Satyadev Builders L2 |
|---|---|---|---|---|---|
| 1.00 | Material and Labour for 10 mm thick rendering in CM 1:3 on concrete surface (edges of chajjas, roof, roof projections and similar work over 10 mm thick dubbing out average on irregular face of walls) in two layers, finished the surface even and smooth without using extra cement, including taking down loose/damaged concrete from the surface and removal debris outside the MOD land and applying two coats of apex or cement base paint as per existing finishes and shade as per existing finish specifications, complete all as specified and directed.
Note:- Double scaffolding and necessary shuttering shall be deemed to be included in the quoted rates against this item. | 30 | Sqm | 300 ₹9,000 Lowest | 300 ₹9,000 Lowest |
| 2.00 | Material and labour for preparation of old decorated wall surfaces by brooming down or steel wire brushing and using sand paper scraping down smoke shoot moulds mass and efflorescent salts and trading oil and greasy spots etc and applying One coat of oil bound distemper Incl necessary filling of gap/repair of gap/prepared surfaces through putty if any required, complete all as specified and directed. | 1,800 | Sqm | 40 ₹72,000 Lowest | 42 ₹75,600 |
| 3.00 | Material and labour for complete removal of existing treatment on wall surface of concrete/brick by mechanical remover including preparation of surface by using sand paper on plaster/old surface and applying Birla/JK wall care putty in two layers to obtain smooth regular/even finish by sanding with mechanical wall sander and two coats of oil bound distemper over a coat of primer by spray machine after preparation above putty surface all as specified and directed., complete all as specified and directed. | 5,000 | Sqm | 123 ₹6,15,000 Lowest | 125 ₹6,25,000 |
| 4.00 | Material and Labour for Preparation of old plastered or unplastered surfaces of wall by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts, trading oil, greasy spot etc and applying Two coats of white lime wash on wall , complete all as specified and directed. | 1,000 | Sqm | 25 ₹25,000 | 20 ₹20,000 Lowest |
| 5.00 | Material and Labour for Preparation of old plastered or unplastered surfaces of wall by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts, trading oil, greasy spot etc and applying one coat of white lime wash on wall , complete all as specified and directed. | 1,500 | Sqm | 20 ₹30,000 | 15 ₹22,500 Lowest |
| 6.00 | Material and Labour for Preparation of old plastered or unplastered surfaces of ceiling by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts, trading oil, greasy spot etc and applying two coat of white lime wash on ceiling Incl necessary filling of gap/repair of gap/prepared surfaces through putty if any required , complete all as specified and directed. | 2,800 | Sqm | 25 ₹70,000 | 24 ₹67,200 Lowest |
| 7.00 | Material and Labour for Preparation of old plastered or unplastered surfaces of wall by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts, trading oil, greasy spot etc and applying one coat of Cement Base Paint on wall , complete all as specified and directed. | 4,200 | Sqm | 35 ₹1,47,000 Lowest | 36 ₹1,51,200 |
| 8.00 | Material and Labour for Preparation of old plastered or unplastered surfaces of wall by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts, trading oil, greasy spot etc and applying Two coat of Cement Base Paint on wall Incl necessary filling of gap/repair of gap & incl prepared surfaces after repair if any required , complete all as specified and directed. | 1,500 | Sqm | 45 ₹67,500 Lowest | 45 ₹67,500 Lowest |
| 9.00 | Material and labour for preparation of old wooden surfaces over 10cm width or girth not otherwise described and applying one coat of synthetic enamel paint, complete all as specified and directed. | 850 | Sqm | 45 ₹38,250 Lowest | 45 ₹38,250 Lowest |
| 10.00 | Material and labour for preparation of old steel surfaces over 10cm width or girth not otherwise described and applying one coat of synthetic enamel paint, complete all as specified and directed. | 700 | Sqm | 45 ₹31,500 Lowest | 45 ₹31,500 Lowest |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
15 Sept 2026, 6:00 pmClosed
AGE (I) Highground
AGE (I) Highground Chandigarh
PERIODICAL SERVICES TO BLDGS INCLUDING REPAIRS TO FACIA CHAJJAS, TANK CLEANING ETC AT AF STN HIGHGROUND UNDER AGE (I) HIGHGROUND CHANDIGARH
2026_MES_784936_1
AGE (I)/HG CHD/T-24/2026-27
Open Tender
Civil Works
Item Rate
180 days
AGE (I) Highground Chandigarh
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
AGE (I) Highground
₹40,000
Yes
25 Sept 2026
18 Aug 2026
22 Sept 2026
18 Aug 2026
15 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of DG set of any make, type, model as per set norms of the original manufacturer set and by the authorised rep of the company after unscrewing nut, bolts, screws etc. for servicing, maintenance, tigthtening, adjustment & cleaning of all moving and stationary parts of DG set, complete and segregating the parts for repair/ refixing/ replacing of capacity 63 KVA , complete all as specified and directed.
Make of DG sets :- kirloskar/Crompton Greaves/Ruston/Ashok Leyland /Cummins
Note: The quoted rate includes the following:
(a) Taking down of unserviceable parts.
(b) Any minor repair, replacement of minor parts such as screws, gasket, nuts, bolts, washers, cleaning & greasing etc. of DG set parts.
(c) Defective parts/ engine oil to be replaced will be measured & paid separately under supply only item mentioned under item No 3 to 12 here-in-after. | 1 | Each job | - | - |
| 2 | All as per Serial Item No1 here-in-before but capacity 40 KVA | 5 | Each job | - | - |
| 3 | Primary fuel filter element for DG set capacity 40KVA. | 5 | Each | - | - |
| 4 | Primary fuel filter element for DG set capacity 63KVA. | 1 | Each | - | - |
| 5 | Secondry fuel filter element for DG set capacity 40KVA. | 5 | Each | - | - |
| 6 | Secondry fuel filter element for DG set capacity 63KVA. | 1 | Each | - | - |
| 7 | Air filter element for DG set capacity 40KVA. | 5 | Each | - | - |
| 8 | Air filter element for DG set capacity 63KVA. | 1 | Each | - | - |
| 9 | Oil filter element for DG set capacity 40KVA. | 3 | Each | - | - |
| 10 | Oil filter element for DG set capacity 63KVA. | 1 | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_879548.xls
BOQ • 0.63 MB
03tenderdocT24.pdf
Tender Documents • 1.40 MB
10corrNo2T24.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .