| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-Finance | 1 | Accepted-Finance L-1 | |
| 2 | 2₹1.3 L+₹1,100 (0.88%)Accepted-Finance 0 AMANIGANJ BHAKHAULI PURE BHALE SULTAN MILKIPUR VILLAGE TOWN BHAKHAULI CITY AYODHYA FAIZABAD UTTAR PRADESH 224153 INDIA | AYODHYA | UTTAR PRADESH | 224153 | 2 | Accepted-Finance L-2 | |
| 3 | 3₹1.3 L+₹1,290 (1.04%)Accepted-Finance | 3 | Accepted-Finance L-3 |
Tender Value
Refer Docs
EMD Value
₹1,500
Closing Date
5 Jun 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
ETC-II, UPPTCL, PAARESHAN BHAWAN, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW-226010
WORK
2023_UPTCL_804438_1
SHORT TERM E-TENDER NO. ETC-II/L/17/2023-24
Open Tender
Electrical Works
Item Rate
15 days
ELECTY. 400 KV S/S UNNAO
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹590
SE, ETC-II, UPPTCL, LUCKNOW
₹1,500
12 Jun 2023
22 May 2023
6 Jun 2023
22 May 2023
5 Jun 2023
22 May 2023
Amount
Carriage of 3 NO. 198 KV Lightening Arrester with terminal connector diverted from 220 KV Sub-station Chinhat, Lucknow (ETD-II Lucknow) to 400 KV Sub-station Dahi Chowki, Unnao.
Shifting of 3 NO. 198 KV Lightening Arrester with terminal connector from store to loading point and safely loading of3 NO. 198 KV Lightening Arrester with terminal connector with the help of manual labour/crane at 220 KV Sub-station Chinhat, Lucknow alongwith other associated work with all cost of men, materials and T&P etc required for satisfactory completion of work in the direction of the supervising engineer.
Safe carriage of 3 NO. 198 KV Lightening Arrester with terminal connector on suitable capacity/size vehicle arranged by the contractor from 220 KV Sub-station Chinhat, Lucknow to 400 KV Sub-station Dahi Chowki, Unnao (Approx. Distance 80 Km.)
Unloading and proper stacking of 3 NO. 198 KV Lightening Arrester with terminal connector from the vehicle to store/suitable place with the help of manual labour/crane at 400 KV Sub-Station Dahi chowki, Unnao alongwith other associated work with all cost of men, materials and T&P etc required for satisfactory completion of work in the direction of the supervising engineer.
Carriage of 1 No. 220 KV Control & Relay Panel (Duplex Type) diverted from 400 KV Sub-station Muzaffarnagar to 400 KV Sub-station Dahi Chowki, Unnao.
Shifting of 1 No. 220 KV Control & Relay Panel (Duplex Type) from store to loading point and safely loading of 1 No. 220 KV Control & Relay Panel (Duplex Type) with the help of manual labour/crane at 400 KV Sub-Station Muzaffarnagar alongwith other associated work with all cost of men, materials and T&P etc required for satisfactory completion of work in the direction of the supervising engineer.
Safe carriage of 1 No. 220 KV Control & Relay Panel (Duplex Type) on suitable capacity/size vehicle arranged by the contractor from 400 KV Sub-Station Muzaffarnagar to 400 KV Sub-station Dahi Chowki, Unnao. (Approx. Distance 625 Km.)
Unloading and proper stacking of 1 No. 220 KV Control & Relay Panel (Duplex Type)from the vehicle to store/suitable place with the help of manual labour/crane at 400 KV Sub-Station Dahi chowki, Unnao alongwith other associated work with all cost of men, materials and T&P etc required for satisfactory completion of work in direction of the supervising engineer.
Carriage of 3Km.4Cx2.5 Sq.mm. Armoured control cableand 7No. 245 KV Bus Post Insulator (BPI) diverted from 400 KV Sub-station Gorakhpur to 400 KV Sub-station Dahi Chowki, Unnao.
Shifting of 3Km. 4Cx2.5 Sq.mm. Armoured control cable and 7No. 245 KV Bus Post Insulator (BPI) with the help of manual labour at 400 KV Sub-Station Gorakhpur with all cost of men, materials and T&P etc required for satisfactory completion of work in the direction of the supervising engineer.
Safe carriage of 3Km.4Cx2.5 Sq.mm. Armoured control cable and 7No. 245 KV Bus Post Insulator (BPI) on suitable capacity/size vehicle arranged by the contractor from 400 KV Sub-Station Gorakhpur to 400 KV Sub-station Dahi Chowki, Unnao (Approx. Distance 350 Km.)
Unloading and proper stacking of 3 Km. 4Cx2.5 Sq.mm. Armoured control cable and 7No. 245 KV Bus Post Insulator (BPI) from the vehicle to store/suitable place with the help of manual labour at 400 KV Sub-Station Dahi chowki, Unnao with all cost of men, materials and T&P etc required for satisfactory completion of work in direction of the supervising engineer.
M/S YASHVARDHAN ENGINEERING WORKS
JAI BHART ENGG WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .