Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹36,000
Closing Date
25 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Develepment Office
pernampet
Strenghtening of road from TKVK Road to Arunthathiyar colony Road in Sathgar Panchayat R278
2022_RDTN_247400_1
A11/1930/2022
Open Tender
Civil Works
Item Rate
180 days
BDO Office pernambut
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹36,000
26 Aug 2022
16 Aug 2022
25 Aug 2022
16 Aug 2022
25 Aug 2022
16 Aug 2022
Amount
Strengthening of Road from TKVK Road to Arunthathiyar Colony Road in Sathgar Panchayat
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Collection and supply of Girrty gravel for Basecourse And side berms and labour charges for filling etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 125mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying tack coat over WBM surface using 7 kgs of SS1 per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
Applying tack coat over WBM surface using 2.5 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
Providing and laying the premix carpet with seal coat type a for 20mm thickness using 0.18 Cum of 13.2 mm IRC HBG metal and 0.09 Cum of 11.2 mm IRC HBG metal with 14.60 Kg of bitumen for pre mixing 10 Sqm of premix carpet ,for seal coat using 0.09 Cum of 6.70 mm chips with 9.80 Kgs of bitumen per 10 Sqm including cost and conveyance of materials to the work site and stacking them to the Dept metric gauge for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80-100 KN, power roller for premix carpet and seal coat separately including labour charges for spreading the mix for the pre mix carpet application of bitumen for the seal coat over pre mix carpet , hire charges and fuel charges for mini hot mix plant bitumen boiler power roller and all other tools and plants employed etc., complete as per clause 509 of most specifications
Provision for Hectometer stone
Provision for kilometer stone
Provision for Sign board Charges
Letering and Painting Name board
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
DURAI S
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .