Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | L1 | Accepted-AOC Tender submitted by TTR Contruction contractor is less then minus 24.00 percent of tender value Hence the tender is accepted | |
| 2 | L2₹5.2 L+₹8,402.85 (1.66%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹5.2 L+₹10,932.85 (2.16%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹5.3 L+₹26,494.85 (5.22%)Rejected-Finance | L4 | Rejected-Finance Rejected | |
| 5 | L5₹5.4 L+₹32,897.85 (6.49%)Rejected-Finance | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | TTR CONSTRUCTION L1 | T. GEORGE STEPHEN L5 | SAHAYA THAYTHEYOUSH L4 | ALEXANDER CONSTRUCTIONS L3 | RAM PRADHEEP L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in hard stiff clay, black cotton, hard red earth, shales murram, gravel , stoney earth and earth mixed with small sized boulders SS.20B and sand , silt or other loose soil , wet sand or slit not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed expect in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc complete (For Drain) | 69 | m3 | 200.45 ₹13,831.05 | 90 ₹6,210 | 211 ₹14,559 | 100 ₹6,900 | 80 ₹5,520 Lowest |
| 2.00 | Plain cement concrete Using 1:4:8 mix ( One cement , four Sand and Eight aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 11.5 | m3 | 4,033.8 ₹46,388.7 Lowest | 4,830 ₹55,545 | 4,246 ₹48,829 | 4,500 ₹51,750 | 4,400 ₹50,600 |
| 3.00 | 3. Supplying and erecting centering to sides and soffits including supports and strutting with necessary centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10cm to 13cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86 | 272 | m2 | 253.2 ₹68,870.4 | 180 ₹48,960 Lowest | 266 ₹72,352 | 200 ₹54,400 | 200 ₹54,400 |
| 4.00 | 4. Cement concrete 1:3:6 (One cement, Three crushed stone sand and six broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers – mixing by mechanical means | 81 | m3 | 4,667 ₹3,78,027 Lowest | 5,300 ₹4,29,300 | 4,912 ₹3,97,872 | 5,000 ₹4,05,000 | 5,000 ₹4,05,000 |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
23 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer,
Suchidrum Town Panchayat
Construction of retaning wall from 15th ward OHT in Suchindrum town panchayat
2026_DTP_712821_1
94/2026/A1
Open Tender
Civil Works
Works
Suchindrum Town Panchayat Office
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹8,000
31 Oct 2026
10 Oct 2026
23 Oct 2026
10 Oct 2026
23 Oct 2026
10 Oct 2026
10 Oct 2026 - 23 Oct 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in hard stiff clay, black cotton, hard red earth, shales murram, gravel , stoney earth and earth mixed with small sized boulders SS.20B and sand , silt or other loose soil , wet sand or slit not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed expect in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc complete (For Drain) | 69 | m3 | 100 | ₹6,900 |
| 2 | Plain cement concrete Using 1:4:8 mix ( One cement , four Sand and Eight aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 11.5 | m3 | 100 | ₹1,150 |
| 3 | 3. Supplying and erecting centering to sides and soffits including supports and strutting with necessary centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10cm to 13cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86 | 272 | m2 | 100 | ₹27,200 |
| 4 | 4. Cement concrete 1:3:6 (One cement, Three crushed stone sand and six broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers – mixing by mechanical means | 81 | m3 | 100 | ₹8,100 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_856206.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.03 MB
BOQ_856206.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .