A.R M.O on Powari Telangpee road KM 0.00 to 5.00. SH. Widening of curve at RD 4.110 to 4.125 C.O U .shape drain at RD 4.090 to 4.110 Parapet at RD 4.672 to 4.780 Edge Wall at RD 4.745 to 4.765 and C.C pavement with kharanja stone soling at RD 4.050
2026_PWD_143929_10
5917 dated 18.09.2026
Open Tender
Civil Works - Roads
Percentage
90 days
Powari
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
₹19,600
22 Sept 2026
22 Sept 2026
28 Sept 2026
22 Sept 2026
27 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting in earth work in all depths and heights in hard rock with chiselling and wedging out of rock (where blasting is prohibited), or setting out to the required lines grades, side slopes, trimming of bottom and levels as shown on the drawing and as directed by by the Engineer-in-charge at site according to the HPPWD specifiocation of 1990 volume-1 and sorting of useful and unuseful materials and stacking the useful material along road side which shall not be less than 7.43 cubic metre failing which recovery @ Rs. 300/- per cubic metre shall be effected and transportation of the un useful material for filling in roadway embankements for grade improvement and level to required grades and then disposing off all surplus excavated material in acquired width of the road or on approved dumping site through all modes of transportations including head load, animal loads or mechanical means along with its levelling and fine dressing and carriage of all labour machinery, materials, tools, equipments and safety measured and other incidentals necessary to complete the work by mechanical means and or labor (if any required complete as per the direction of Engineer-in-Charge). Any loss to the public and private property during the course of execution and transportation of useful and un useful materials shall be absolute responsibility of the contractor which shall have to be dully compensated by him to full extent complete in all respects and in all cases. | 26.86 | Per Cubic meter | 435 | ₹11,684.1 |
| 2 | Earth work in excavation in foundation structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto any lead, dressing of sides and bottoms and back filling in trenches with excavated suitable materials complete within all leads, lifts carriage of material and other incidentials. | 108.6 | Per Cubic meter | 300 | ₹32,580 |
| 3 | Stone soling properly hand packed filling interstices with kharanja stone and consolidating with power road roller to the required gradient and camber including spreading watering and rolling of binding materials moorum or earth etcetra complete as per HP.PWD. specification. 100mm (one hundred millimetre) spread thickness (finished work including materials and labour) including carriage of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. | 79.95 | Per Cubic meter | 1,960.55 | ₹1,56,745.97 |
| 4 | Providing and laying plain cement concrete Grade M -20(Twenty) nominal mix 1:2:4 (one cement: two sand: four graded crushed stone aggregate 20mm (twenty milimetre) nominal size concrete for plain/reinforced concrete in open foundations complete including form work as per drawings and Technical Specifications Clause 802, 803, 1202 & 1203 and as per the direction of the Engineer-in-Charge including carriage of material through all modes of transportation within all leads and lifts and other incidentals.The rates are inclusive octrol,royality,Malkana, toll tal, sale tax, or other taxes imposed by government. | 78.75 | Per Cubic meter | 6,993 | ₹5,50,698.75 |
| 5 | Providing concrete for plain/reinforced concrete grade M 15 Nominal mix (1:2.5:5) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 12033 and curing complete including the cost of form work and carriage of materials in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge. | 25.5 | Per Cubic meter | 6,179.7 | ₹1,57,582.35 |
| 6 | Providing and laying plain cement concrete M-10 (ten) grade nominal mix 1:3:6 (one cement : three sand : six graded stone aggregate 20 mm (twenty millimetre) nominal size) in open foundations and plinths as per drawings and technical specification for rural roads clause 802, 803, 1202 and 1203 and curing complete including the cost of form work and carriage of materials in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge. | 1.8 | Per Cubic meter | 6,068.35 | ₹10,923.03 |
| 7 | Back filling behind Retaining wall with granular material complete as per drawing and M.O.R.D. technical specification clause 1204.3.8. Including carriage of material within all lead and lifts and other incidentals. | 8.7 | Per Cubic meter | 970.5 | ₹8,443.35 |
| 8 | Construction of embankment with approved material obtained from borrow pits within all leads and lifts , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.1 and 300.2 as per technical specification clause 301.5 and as per the entire satisfaction and direction of Engineer-in-charge. | 170 | Per Cubic meter | 297.35 | ₹50,549.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.87 MB
SBD.pdf
Tender Documents • 4.70 MB
BOQ_214014.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .